152007_RFI__7_removable_curbs.pdf

PDF 12 KB Posted

Attached to
Main Gate Entry Control Point Upgrade Federal contract opportunity
Solicitation number
W912L619R5001
Issued by
Department of the Army National Guard

About this file

RFI 7

View the file

Other files for this federal contract opportunity

Other files attached to Main Gate Entry Control Point Upgrade, newest first.
File Type Posted
152007_RFI__12_cable_barrier_spring_response.pdf PDF
RFI_0011.pdf PDF
152007_RFI__13_Bollard_Storage_Location.pdf PDF
19-R-5001-0003.pdf PDF
RFI_0010.doc DOC document
W912L619R50010002_Amendment_0002.pdf PDF
Front_Gate_ECP_Upgrade_Site_Visit_Sign_In_Sheet.pdf PDF
152007_RFI__2_-_Swing_Gate_Demo.pdf PDF
152007_RFI__8_UFC_requirements.pdf PDF
152007_RFI__5_-_signage_combined_V2_.pdf PDF
152007_RFI__9_cable_barriers_V2.pdf PDF
152007_RFI__4_-_E005_For_reference_only.pdf PDF
152007_RFI__1_-_Barriers.pdf PDF
152007_RFI__6_signage_V3.pdf PDF
152007_RFI__3_-_Gate_Closure.pdf PDF
W912L619R50010001.pdf PDF
RFI.doc DOC document
W912L6-19-R-5001.pdf PDF
WRANGB_COMBINED_SPECS_152007_FINAL_Upload_in_FBO.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION

(RFI)

PROJECT TITLE: Construct Barrier at Main Gate RFI NO: 7

PROJECT NUMBER: YZEU152007

BASE: Will Roger's Air National Guard

DISTRIBUTION/ROUTING Date Initials Critical: Yes No Contractor to Contracting Contracting Received Date Req’d: ASAP Contracting to COR COR Received COR to A & E (if necessary) A & E Received A & E to COR COR Received COR to Contractor & Contracting /18 CEC

SUBJECT: Project Questions Drawing/Spec Ref:

Information Requested: Ref Sheet G-002, General Project Notes, Note 17 states that the "General contractor shall remove all removable curbs within work areas and store them in a place to be determined by the contracting officer after completing of work the contractor shall place the removable curb in their original locations. Contractor shall supply 50 new removable curbs to replace damaged or poor conditioned curbs and for other locations deemed necessary by the contracting officer. All removable curbs damaged during construction shall be replaced at the contractors expense."

Does the contractor need to purchase 50 removable curbs as stated in this note? And if so, can you provide a detail or description of what a "removable curb" is exactly.

Attachment(s):

POC: Phone: Organization:

Response: Note 17 was inadvertantly left on the drawings from a previous project. There are no removable curbs, and we do not want 50 removable curbs to be purchased.

Attachment(s):

POC: CEC Phone: 405-686-50003 Organization: 137 SOCES