HVAC_EQUIPMENT_Q&A.pdf
PDF 38 KB Posted
- Attached to
- HVAC REPLACEMENT
- Solicitation number
- W912L519Q5023
About this file
QUESTIONS & ANSWERS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HVAC_EQUIPMENT_ADDITIONAL_-_Q&A.pdf | ||
| Site_Visit_Sign_in_Sheet.pdf | ||
| SOW_20190918.doc | DOC document | |
| HP-33.JPG | JPG image | |
| 2805_HP17.pdf | ||
| 2805_HP28.pdf | ||
| 2805_HP12.pdf | ||
| 2805_HP20.pdf | ||
| 2805_HP8.pdf | ||
| 2902_HP30.pdf | ||
| 2902_HP28.pdf | ||
| 2805_HP27.pdf | ||
| 2805_HP7.pdf | ||
| 2805_HP19.pdf | ||
| ATTACHMENT_1_PERFORMANCE_WORK_STATEMENT.pdf | ||
| ATTACHMENT_2_WAGE_DETERMINATION.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HVAC EQUIPMENT BUILDING 2805 & 2902
QUESTIONS AND ANSWERS
Question: How many heat pumps cab be available to replace at one time?
Answer: The contractor shall change at least two heat pumps at a time.
Question: Are the controls local or do they tie back into a site BAS?
Answer: The controls tie back into the site BAS.
Question: If they tie back into the BAS who is the manufacturer?
Answer: The current BAS manufacturer is Alerton Controls.
Question: Is there required bid form?
Answer: No, the offeror shall submit a technical package that demonstrates the technical capabilities and technical approach to the project and a price breakout.
Question: Who is the ATC Contractor?
Answer: The ATC Contractor is Alberio Energy New Castle.
Question: Could you forward the sign in sheet?
Answer: The sign in sheet is posted in this Amendment.
Question: Are Trane units Sole Sourced?
Answer: They are not Sole Sourced, they have previously been bought at Sieberlich Trane in New
Castle. When replacing these units the replacement does not have to be “Trane” but shall possess equal technical characteristics which will be determined acceptable by the Government submitted within the technical package of the offeror’s proposal.
Question: What is the anticipated award date?
Answer: The anticipated award date is prior to 30 September 2019.