HVAC_EQUIPMENT_Q&A.pdf

PDF 38 KB Posted

Attached to
HVAC REPLACEMENT
Solicitation number
W912L519Q5023
Issued by

About this file

QUESTIONS & ANSWERS

View the file

Other files

File Type Posted
HVAC_EQUIPMENT_ADDITIONAL_-_Q&A.pdf PDF
Site_Visit_Sign_in_Sheet.pdf PDF
SOW_20190918.doc DOC document
HP-33.JPG JPG image
2805_HP17.pdf PDF
2805_HP28.pdf PDF
2805_HP12.pdf PDF
2805_HP20.pdf PDF
2805_HP8.pdf PDF
2902_HP30.pdf PDF
2902_HP28.pdf PDF
2805_HP27.pdf PDF
2805_HP7.pdf PDF
2805_HP19.pdf PDF
ATTACHMENT_1_PERFORMANCE_WORK_STATEMENT.pdf PDF
ATTACHMENT_2_WAGE_DETERMINATION.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HVAC EQUIPMENT BUILDING 2805 & 2902

QUESTIONS AND ANSWERS

Question: How many heat pumps cab be available to replace at one time?

Answer: The contractor shall change at least two heat pumps at a time.

Question: Are the controls local or do they tie back into a site BAS?

Answer: The controls tie back into the site BAS.

Question: If they tie back into the BAS who is the manufacturer?

Answer: The current BAS manufacturer is Alerton Controls.

Question: Is there required bid form?

Answer: No, the offeror shall submit a technical package that demonstrates the technical capabilities and technical approach to the project and a price breakout.

Question: Who is the ATC Contractor?

Answer: The ATC Contractor is Alberio Energy New Castle.

Question: Could you forward the sign in sheet?

Answer: The sign in sheet is posted in this Amendment.

Question: Are Trane units Sole Sourced?

Answer: They are not Sole Sourced, they have previously been bought at Sieberlich Trane in New

Castle. When replacing these units the replacement does not have to be “Trane” but shall possess equal technical characteristics which will be determined acceptable by the Government submitted within the technical package of the offeror’s proposal.

Question: What is the anticipated award date?

Answer: The anticipated award date is prior to 30 September 2019.