HVAC_EQUIPMENT_ADDITIONAL_-_Q&A.pdf

PDF 37 KB Posted

Attached to
HVAC REPLACEMENT
Solicitation number
W912L519Q5023
Issued by

About this file

These questions were sent by the deadline but to the incorrect email. They are now being answered.

View the file

Other files

File Type Posted
Site_Visit_Sign_in_Sheet.pdf PDF
SOW_20190918.doc DOC document
HVAC_EQUIPMENT_Q&A.pdf PDF
HP-33.JPG JPG image
2805_HP17.pdf PDF
2805_HP28.pdf PDF
2805_HP12.pdf PDF
2805_HP20.pdf PDF
2805_HP8.pdf PDF
2902_HP30.pdf PDF
2902_HP28.pdf PDF
2805_HP27.pdf PDF
2805_HP7.pdf PDF
2805_HP19.pdf PDF
ATTACHMENT_1_PERFORMANCE_WORK_STATEMENT.pdf PDF
ATTACHMENT_2_WAGE_DETERMINATION.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HVAC EQUIPMENT BUILDING 2805 & 2902

ADDITIONAL ‐ QUESTIONS AND ANSWERS

Question: What is the scope of piping that needs to be replaced? Are we removing and replacing piping back to the first isolation valve? Or are we simply disconnecting and reconnecting the hoses that are attached to the existing units?

Answer: Disconnecting and reconnecting hoses, only replace if needed.

Question: Please confirm that each unit replacement only requires a local (i.e. ‐ valve) shutdown as opposed to shutting down and draining most or all of the piping system.

Answer: Isolation valves are located on every unit (or supposed to be). The contractor should not have to shut down and drain everything.

Question: Is the contractor responsible for moving the Computer system etc. before the work start, if so, is there a location where you want the items storage?

Answer: There is no need for the contractor to touch the computer (DDC System), it is located in the CE Shop.

Question: Is the contractor going to get full access to the secured areas??

Answer: The contractor will have full access.