TEMPLATE_AF_3052_Constr_Cost_Est_Breakdown_Pre-Eng_Structure.xls
XLS spreadsheet 173 KB Posted
- Attached to
- RPR MAIN GATE (VALENCIA GATE) 162ND WING. Federal contract opportunity
- Solicitation number
- W912L2-16-B-2001
About this file
Template - AF Form 3052 - Construction Cost Est Breakdown Pre-engineered structure
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF_1419_Abstract_-_W912L2-16-B-2001_-_Signed.pdf | ||
| OF_1419A_Abstract_-_W912L2-16-B-2001_-_Continuation.pdf | ||
| QUESTIONS__ANSWERS_-_1 2 15 16 34_-_W912L2-16-B-2001_-_RPR_Main_Gate_(Valencia_Gate)_-_22Jun.pdf | ||
| Amendment_2_-_W912L2-16-B-2001-0002.pdf | ||
| PT160620-SSK-001-16.06.20.pdf | ||
| Amendment_1_-_W912L2-16-B-2001-0001.pdf | ||
| QUESTIONS_ANSWERS_W912L2-16-B-2001_RPR_Main_Gate_(Valencia_Gate)_16Jun.pdf | ||
| Pre-Bid_Conference_Sign-in_Main_Gate_(Valencia).pdf | ||
| Amendment_1_-_W912L2-16-B-2001.doc | DOC document | |
| Pre-Bid_Conference_slides_Main_Gate_(Valencia).pdf | ||
| A-04._Wage_Det_AZ160033_26Feb16.doc | DOC document | |
| W912L2-16-B-2001_SOLICITATION.doc | DOC document | |
| A-04._Wage_Det_AZ160008_8Jan16.doc | DOC document | |
| Schedule_of_Material_Submittals_form66.pdf | ||
| TEMPLATE_AF_3052_Constr_Cost_Est_Breakdown_Repair_Valencia_Main_Gate.xls | XLS spreadsheet |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF 3052 BACK SHT
| AF FORM 3052 | ||||
| TOTAL MATERIAL COSTS | $ - 0 | |||
| TOTAL LABOR COSTS | - 0 | |||
| TOTAL OTHER DIRECT COSTS | - 0 | |||
| SUBTOTAL | $ - 0 | |||
| OVERHEAD | % | - 0 | ||
| CONTRACT MANHOUR REPORTING | % | - 0 | ||
| SUBTOTAL | $ - 0 | |||
| PROFIT | % | - 0 | ||
| TOTAL PRICE | $ - 0 | |||
| DATE: | FIRM NAME: | |||
| TITLE: | BY: | |||
| (Signature) |
AF 3052 FRONT PG1
| CONSTRUCTION COST ESTIMATE BREAKDOWN | OMB No. 0704-0193 | |||||||||
| Expires 31 October 1989 | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| CONTRACT FOR (Work to be preformed) Valencia Main Gate Minor Construction Work | PROPOSED TOTAL CONTRACT PRICE | $ - 0 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | XHEA162020 | WORK LOCATION | Valencia Main Gate | ||||||
| MATERIAL COST | LABOR COSTS | |||||||||
| LINE | ITEM | UNIT | OTHER | |||||||
| NO. | OF | QUANTITY | MANHOUR | AVERAGE | DIRECT | LINE | ||||
| MEASURE | UNIT | TOTAL | MANDAYS | RATE | TOTAL | COSTS | TOTAL | |||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| 1 | ARCHITECTURAL & SITE | |||||||||
| 3 | Demo Curb | lf | $ - 0 | $ - 0 | $ - 0 | |||||
| 4 | Base Course | Sq Yd | $ - 0 | $ - 0 | $ - 0 | |||||
| 5 | Asphalt Paving | Sq Yd | $ - 0 | $ - 0 | $ - 0 | |||||
| 6 | Striping | ea | $ - 0 | $ - 0 | ||||||
| Storm Drain Inlet | ea | $ - 0 | $ - 0 | $ - 0 | ||||||
| Storm Drain Manhole | ea | $ - 0 | $ - 0 | $ - 0 | ||||||
| 7 | Concrete Curb | lf | $ - 0 | $ - 0 | $ - 0 | |||||
| 9 | Gates | ea | $ - 0 | $ - 0 | ||||||
| 10 | Signage | ea | $ - 0 | $ - 0 | ||||||
| 12 | ELECTRICAL DEMO | |||||||||
| 13 | Electrical Demolition | $ - 0 | ||||||||
| 14 | LIGHTING | |||||||||
| 15 | Pole foundation | $ - 0 | ||||||||
| 16 | 3/4" PVC Conduit | lf | 35 | |||||||
| 17 | #10 AWG Conductor | lf | 280 | |||||||
| 18 | Weatherproof Pullbox | ea | 1 | |||||||
| 17 | SUBTOTALS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| AF FORM 3052 Jan 88 |
AF 3052 FRONT PG 2
| CONSTRUCTION COST ESTIMATE BREAKDOWN | OMB No. 0704-0193 | |||||||||
| Expires 31 October 1989 | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| CONTRACT FOR (Work to be preformed) Valencia Main Gate Repair Work | PROPOSED TOTAL CONTRACT PRICE | - 0 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | XHEA162020 | WORK LOCATION | Valencia Main Gate | ||||||
| MATERIAL COST | LABOR COSTS | |||||||||
| LINE | ITEM | UNIT | OTHER | |||||||
| NO. | OF | QUANTITY | MANHOUR | AVERAGE | DIRECT | LINE | ||||
| MEASURE | UNIT | TOTAL | MANDAYS | RATE | TOTAL | COSTS | TOTAL | |||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| 1 | POWER MISC. | |||||||||
| 2 | #12 Awg conductor | lf | ||||||||
| 3 | Concrete Bollard | $ - 0 | $ - 0 | |||||||
| 4 | 3/4" PVC Conduit | lf | ||||||||
| 5 | ||||||||||
| 6 | ||||||||||
| 7 | FIRST PAGE SUBTOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 8 | ||||||||||
| 9 | ||||||||||
| 10 | ||||||||||
| 11 | ||||||||||
| 12 | ||||||||||
| 13 | ||||||||||
| 14 | SECOND PAGE SUBTOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 15 | ||||||||||
| 16 | SUBTOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 17 | Subcontractor markup | % | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 18 | Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| AF FORM 3052 Jan 88 |
AF 3052 BACK SHT sample
| INSTRUCTIONS FOR COMPLETING AF FORM 3052 | ||||||
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of | ||||||
| all direct costs. | ||||||
| Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF, linear | ||||||
| feet - LF, board feet - BF, each - EA, pound - LB). | ||||||
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the | ||||||
| Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issed. Otherwise, the | ||||||
| contractor is responsible for determining quantity estimates. | ||||||
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (col 5) for item listed in column 1. | ||||||
| Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 | ||||||
| the average rate per manhour (manday) and in col 8 the total labor cost. | ||||||
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of significant | ||||||
| dollar value. | ||||||
| Col 10 Line Total. Self-explanatory. | ||||||
| NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on | ||||||
| the last page as follows: | ||||||
| TOTAL MATERIAL COSTS | $ | - 0 | ||||
| TOTAL LABOR COSTS | $ | - 0 | ||||
| TOTAL OTHER DIRECT COSTS | $ | - 0 | ||||
| TOTAL DIRECT COSTS | $ | - 0 | ||||
| OVERHEAD | % | % | $ | - 0 | ||
| SUBTOTAL | $ | - 0 | ||||
| PROFIT | % | % | $ | - 0 | ||
| TOTAL PRICE | $ | - 0 | ||||
| DATE ______________________________ | FIRM NAME _______________________________________________ | |||||
| TITLE ______________________________ | BY ________________________________________________________ | |||||
| (Signature) | ||||||
| _________________________________________________________________________________________________________________________ | ||||||
| INSTRUCTIONS TO OFFERORS | ||||||
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and | ||||||
| estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from | ||||||
| this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data | ||||||
| (see ASPR 3-807.3(e) and 3.807.4). | ||||||
| 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this form any | ||||||
| additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and | ||||||
| analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of | ||||||
| a. The existing, verifiable data. | ||||||
| b. The judgmental factors applied in projecting from known data to the estimate, and | ||||||
| c. The contingencies used by the offeror in his proposed price. | ||||||
| In short, the offeror's estimating process itself needs to be disclosed. | ||||||
| 3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), and made | ||||||
| available to the contracting officer or his authorized representative upon request. | ||||||
| 4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying | ||||||
| the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation | ||||||
| of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any | ||||||
| negotiations prior to contract award. | ||||||
| (Reverse of AF Form 3052, Jan 88) |