TEMPLATE_AF_3052_Constr_Cost_Est_Breakdown_Pre-Eng_Structure.xls

XLS spreadsheet 173 KB Posted

Attached to
RPR MAIN GATE (VALENCIA GATE) 162ND WING. Federal contract opportunity
Solicitation number
W912L2-16-B-2001
Issued by
Department of the Army Arizona Army National Guard

About this file

Template - AF Form 3052 - Construction Cost Est Breakdown Pre-engineered structure

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF 3052 BACK SHT

AF FORM 3052
TOTAL MATERIAL COSTS$ - 0
TOTAL LABOR COSTS- 0
TOTAL OTHER DIRECT COSTS- 0
SUBTOTAL$ - 0
OVERHEAD%- 0
CONTRACT MANHOUR REPORTING%- 0
SUBTOTAL$ - 0
PROFIT%- 0
TOTAL PRICE$ - 0
DATE:FIRM NAME:
TITLE:BY:
(Signature)

AF 3052 FRONT PG1

CONSTRUCTION COST ESTIMATE BREAKDOWNOMB No. 0704-0193
Expires 31 October 1989
CONTRACTORADDRESS
CONTRACT FOR (Work to be preformed) Valencia Main Gate Minor Construction WorkPROPOSED TOTAL CONTRACT PRICE$ - 0
PURCHASE REQUEST NUMBERPROJECT NUMBERXHEA162020WORK LOCATIONValencia Main Gate
MATERIAL COSTLABOR COSTS
LINEITEMUNITOTHER
NO.OFQUANTITYMANHOURAVERAGEDIRECTLINE
MEASUREUNITTOTALMANDAYSRATETOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
1ARCHITECTURAL & SITE
3Demo Curblf$ - 0$ - 0$ - 0
4Base CourseSq Yd$ - 0$ - 0$ - 0
5Asphalt PavingSq Yd$ - 0$ - 0$ - 0
6Stripingea$ - 0$ - 0
Storm Drain Inletea$ - 0$ - 0$ - 0
Storm Drain Manholeea$ - 0$ - 0$ - 0
7Concrete Curblf$ - 0$ - 0$ - 0
9Gatesea$ - 0$ - 0
10Signageea$ - 0$ - 0
12ELECTRICAL DEMO
13Electrical Demolition$ - 0
14LIGHTING
15Pole foundation$ - 0
163/4" PVC Conduitlf35
17#10 AWG Conductorlf280
18Weatherproof Pullboxea1
17SUBTOTALS$ - 0$ - 0$ - 0$ - 0
AF FORM 3052 Jan 88

AF 3052 FRONT PG 2

CONSTRUCTION COST ESTIMATE BREAKDOWNOMB No. 0704-0193
Expires 31 October 1989
CONTRACTORADDRESS
CONTRACT FOR (Work to be preformed) Valencia Main Gate Repair WorkPROPOSED TOTAL CONTRACT PRICE- 0
PURCHASE REQUEST NUMBERPROJECT NUMBERXHEA162020WORK LOCATIONValencia Main Gate
MATERIAL COSTLABOR COSTS
LINEITEMUNITOTHER
NO.OFQUANTITYMANHOURAVERAGEDIRECTLINE
MEASUREUNITTOTALMANDAYSRATETOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
1POWER MISC.
2#12 Awg conductorlf
3Concrete Bollard$ - 0$ - 0
43/4" PVC Conduitlf
5
6
7FIRST PAGE SUBTOTAL$ - 0$ - 0$ - 0$ - 0
8
9
10
11
12
13
14SECOND PAGE SUBTOTAL$ - 0$ - 0$ - 0$ - 0
15
16SUBTOTAL$ - 0$ - 0$ - 0$ - 0
17Subcontractor markup%$0.00$0.00$0.00$0.00
18Total$ - 0$ - 0$ - 0$ - 0
AF FORM 3052 Jan 88

AF 3052 BACK SHT sample

INSTRUCTIONS FOR COMPLETING AF FORM 3052
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of
all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF, linear
feet - LF, board feet - BF, each - EA, pound - LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the
Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issed. Otherwise, the
contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7
the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of significant
dollar value.
Col 10 Line Total. Self-explanatory.
NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on
the last page as follows:
TOTAL MATERIAL COSTS$- 0
TOTAL LABOR COSTS$- 0
TOTAL OTHER DIRECT COSTS$- 0
TOTAL DIRECT COSTS$- 0
OVERHEAD%%$- 0
SUBTOTAL$- 0
PROFIT%%$- 0
TOTAL PRICE$- 0
DATE ______________________________FIRM NAME _______________________________________________
TITLE ______________________________BY ________________________________________________________
(Signature)
_________________________________________________________________________________________________________________________
INSTRUCTIONS TO OFFERORS
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from
this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data
(see ASPR 3-807.3(e) and 3.807.4).
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this form any
additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and
analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), and made
available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying
the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation
of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any
negotiations prior to contract award.
(Reverse of AF Form 3052, Jan 88)

File details come from the government source that posted it. Updated .