EXHIBIT_A_B301_B302_Hangar_Repairs.pdf

PDF 90 KB Posted

Attached to
REPAIR HANGARS B301 & B302 Federal contract opportunity
Solicitation number
W912KC-17-R-0001
Issued by
Department of the Army Pennsylvania Army National Guard

About this file

Exhibit A

View the file

Other files for this federal contract opportunity

Other files attached to REPAIR HANGARS B301 & B302, newest first.
File Type Posted
AMENDMENT_4_-_W912KC-17-R-0001_-_REPAIR_B301-B302.pdf PDF
AMENDMENT_3_-_W912KC-17-R-0001_-_REPAIR_B301-B302.pdf PDF
20120309-135148.PDF PDF
20120309-140019.PDF PDF
20120314-104233.PDF PDF
20120309-135755.PDF PDF
20120314-111039.PDF PDF
20120309-135905.PDF PDF
20120309-135615.PDF PDF
20120309-133712.PDF PDF
20120314-110802.PDF PDF
20120309-135023.PDF PDF
20120309-135436.PDF PDF
20120309-134001.PDF PDF
20120309-141035.PDF PDF
20120309-135317.PDF PDF
20120309-133846.PDF PDF
AMENDMENT_1_-_W912KC-17-R-0001-J-0001_-_REPAIR_B301-B302.pdf PDF
PA_ANG_301_-_Kitchen.pdf PDF
LEED_Companion_Sheet.pdf PDF
QA_Master_Document_20170413.pdf PDF
AMENDMENT_4_W912KC-17-R-0001.pdf PDF
AMENDMENT_3_RFI_FINAL.PDF PDF
ASK-001.pdf PDF
ATFP_Plan.pdf PDF
Utility_Sketch.pdf PDF
Ansulite_3__AFFF_(AFC-5-A)_SDS.PDF PDF
07_21_29_-_Sprayed_Insulation.pdf PDF
PA_ANG_-_Bldg_301__302_-_Spec_Sec_01_00_00.pdf PDF
Site_Visit_20170206.pptx PPTX presentation
Sign_In_Roster_W912KC-R-17-0001.pdf PDF
B302_Part_5_Drawings.pdf PDF
B302_Part_9_Drawings.pdf PDF
B302_Part_10_Drawings.pdf PDF
B301_Part_2_Drawings.pdf PDF
B301_Part_4_Drawings.pdf PDF
B301_Part_9_Drawings.pdf PDF
B301_Part_1_Drawings.pdf PDF
B302_Part_1_Drawings.pdf PDF
B301_Part_5_Drawings.pdf PDF
B301_Part_6_Drawings.pdf PDF
B301_Part_3_Drawings.pdf PDF
B302_Part_4_Drawings.pdf PDF
PAANG_301_302_Combined_Specs_Vol.1.pdf PDF
PAANG_301_302_Combined_Specs_Vol.2.pdf PDF
BLDG_301_Specs_&_Drawings_Part_2.pdf PDF
BLDG_302_Specs_&_Drawings_Part_2.pdf PDF
BLDG_301_Specs_&_Drawings_Part_1.pdf PDF
EXHIBIT_B_B301_B302_Hangar_Repairs.pdf PDF
EXHIBIT_C_B301_B302_Hangar_Repairs.pdf PDF
Show all 50

REPAIR HANGARS B301 & B302 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B301 & B301 HANGAR REPAIRS RFP# W912KC-17-R-0001

EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE

PART 1: Prepare questionnaires in the format provided.

Provide the following information requested in this format for each of the projects/contracts being described. Prepare not more than three (3) of these documents. Contractors should select their projects carefully because the quality of the contractor’s relevant performance is more important than the quantity of projects submitted. Projects may be on going, if complete to 70 %, and cannot have been completed any earlier than 5 years prior to the solicitation issue date. Provide frank, concise comments regarding your performance on the contracts you identify. Use as much space as required.

A. Offeror (Your) Name (Company/Division):

B. Project/Contract Title:

C. Contract Specifics:

1. Description of Effort as ___________Prime or _________Subcontractor

2. Contract Number _____________________

3. Original Contract $ Value _____________ Current/Final Contract $ Value ____________

4. If amounts in 3 above are different, provide a brief description of the reason:

5. Completion Date:

1. Original Date: ______________ 2. Current Schedule____________________

3. Estimate/Final Completion Date:________________________________

4. Primary cause for Contract Modifications__________________________________

D. Provide detailed description of the work performed under the contract including, but not limited to an offeror's past performance for similarity of the construction methods, particularly ________________ project scope; cost magnitude, and complexity of work performed to those required for the proposed effort.

The Government may also consider similarity of the client type (i.e. federal government) and/or the project sustainability requirements. ANG projects will consider United States Green Building Council (USGBC)

LEED®. The location at which work was performed to the location(s) at which work will be performed may also be considered.

1. Describe the specific elements of the work performed by your firm.

2. Indicate what elements of work were performed by your major subcontractors and if those same subcontractors will be used on this project. If you intend to use these subcontractors, please list name and principal areas of work they will perform. Indicate if you do not intend on utilizing any of these subcontractors.

3. Address any technical areas about this project you consider uniquely relevant to this project. Include in your discussion if project had sustainability requirements. Of particular interest are USGBC LEED® and the level of recognition received. Indicate if no such requirements.

4. If you intend to use any of the same key personnel on this solicitations’ project, indicate by name and position those personnel proposed to be utilized on the referenced contract. (Project Manager, Site

Superintendent, Quality Control Manager). Indicate what position they will have on this solicitation’s contract. Indicate if you do not intend on utilizing any of these same personnel.

5. Describe why you believe the work is very relevant, relevant or semi-relevant to this solicited project.

(see section 00120 for information.) (Use as much space as necessary)

B301 & B301 HANGAR REPAIRS RFP# W912KC-17-R-0001

E. List a point of Contact for Owner/Government agency Contracting Officer and or inspector; include a current phone number and facsimile number. Email address is also desired. (This information is required here even though you will be sending Exhibit C letters and questionnaires to theses references. (Do NOT include a copy of the Exhibit Cs you sent to your references.)

End of Part 1- Questionnaire Requirements – Prepare and send Exhibit C Package to the reference(s) for each of projects discussed in the Exhibit As.

PART 2: Provide the following information one time.

Additional offeror information required, but not project specific. This information need only be provided once in your submission package.

2 A. Applicable to all offerors - Describe your Compliance with the requirements of FAR clause 52.219-8

Utilization of Small Business Concerns. Even if you are a Small or Small Disadvantaged Business this clause in Federal Contracts applies. It is the policy of the United States that small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns shall have the maximum practicable opportunity to participate in performing contracts let by any Federal agency, including contracts and subcontracts for subsystems, assemblies, components, and related services for major systems. It is also policy to establish procedures to ensure the timely payment of amounts due pursuant to the terms of their subcontracts. Describe below the methods you have used to comply with this policy on prior federal contracts. Include any evidence, or a point of contact to verify this information, if available.

2B: Offerors are strongly encouraged to include with their proposals information on problems encountered on relevant projects and the specific corrective actions taken to remedy the problem(s).

2C: List any projects within the last five (5) years that have been assessed Liquidated damages. If none have been assessed, make a positive statement to that effect.

2D: List any projects within the last five (5) years that have been terminated, for any reason. Provide an explanation. If none, make a positive statement to that effect.

2F: Other Past Performance Considerations (OPTIONAL) Information, if provided, shall be limited to the period starting 5 years prior to the solicitation release date and limited to not more than 4 pages (2 double sided pages).

Effectiveness of value engineering (VEC) proposals you submitted on prior contracts. (Provide a brief description; impact on cost, schedule, efficiency or quality; contract number; name and phone number of customer benefiting from the VEC).

Professional/Industry awards (Identify award type, date of award and copy of certificate if applicable), Letters of appreciation, recognition or commendations.

Discuss unique skills and accomplishments (Explain unique skills and/or accomplishments and provide supporting information for verification).

End of Questionnaire Requirements

File details come from the government source that posted it. Updated .