PAANG_301_302_Combined_Specs_Vol.1.pdf
PDF 9 MB Posted
- Attached to
- REPAIR HANGARS B301 & B302 Federal contract opportunity
- Solicitation number
- W912KC-17-R-0001
About this file
Specs Vol 1. Updated 8 February 2017
View the file
Other files for this federal contract opportunity
Show all 50
REPAIR HANGARS B301 & B302 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ISSUED FOR RFP
SPECIFICATIONS
VOLUME 1 of 2
REPAIR HANGAR 301 & REPAIR HANGAR 302
Pittsburgh International Airport, PA
W90FYQ-09-D-0004-DL03
Prepared For:
Prepared By:
3500 Parkway Lane, Suite 600
Norcross, Georgia 30092 678.336.7740 www.pondco.com
3 JUNE 2016
Project No. 1140370
171st Air Refueling Wing Pittsburgh International Airport Coraopolis, PA
THIS PAGE INTENTIONALLY LEFT BLANK
PA ANG Repair Hangars 301 and 302
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 17.00 20 NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 13 SPECIAL PROJECT PROCEDURES
01 35 40.00 20 ENVIRONMENTAL MANAGEMENT
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 52 13 TEMPORARY MODULAR SPACE
01 57 16 TEMPORARY PEST CONTROL
01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 62 35 RECYCLED / RECOVERED MATERIALS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 75 00 STARTING AND ADJUSTING
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.00 40 COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 82 16.00 20 ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS
02 82 33.13 20 REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 30 10 CONCRETE STRENGTHENING USING FIBER REINFORCED POLYMERS
DIVISION 04 - MASONRY
04 20 00 MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
PROJECT TABLE OF CONTENTS Page 1
07 11 13 BITUMINOUS DAMPPROOFING
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 22 00 ROOF AND DECK INSULATION
07 41 13 METAL ROOF PANELS
07 42 63 FABRICATED WALL PANEL ASSEMBLIES
07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 33 23 OVERHEAD COILING DOORS
08 34 59 DAY GATES
08 41 13 ALUMINUM-FRAMED ENTRANCES, STOREFRONTS AND CURTAINWALL
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL AND DOOR LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 13 CERAMIC TILING
09 51 00 ACOUSTICAL CEILINGS
09 62 38 STATIC-CONTROL FLOORING
09 65 00 RESILIENT FLOORING
09 67 23.15 FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM
09 67 23.16 FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 10 00 VISUAL COMMUNICATIONS SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 13 WIRE MESH PARTITIONS
10 22 19 DEMOUNTABLE MOVABLE PARTITIONS
10 22 39 FOLDING PANEL PARTITIONS
10 26 13 WALL AND CORNER GUARDS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
10 55 00 POSTAL SPECIALTIES
DIVISION 11 - EQUIPMENT
11 06 40.13 FOODSERVICE EQUIPMENT SCHEDULE
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
PROJECT TABLE OF CONTENTS Page 2
DIVISION 14 - CONVEYING EQUIPMENT
14 21 23 ELECTRIC TRACTION PASSENGER ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 18.00 10 PREACTION AND DELUGE SPRINKLER SYSTEMS, FIRE PROTECTION
21 13 25.00 HIGH-EXPANSION FOAM FIRE PROTECTION SYSTEM
21 21 03.00 10 WET CHEMICAL FIRE EXTINGUISHING SYSTEM
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 15 13.16 40 HIGH-PRESSURE COMPRESSED-AIR PIPING, PIPING COMPONENTS,
AND VALVES
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 09 13.34 40 CONTROL VALVES, SELF-CONTAINED
23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
23 11 25 FACILITY GAS PIPING
23 23 00 REFRIGERANT PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 31 13.00 40 METAL DUCTS
23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLS
23 52 43.00 20 LOW PRESSURE WATER HEATING BOILERS (UNDER 800,000 BTU/HR
OUTPUT)
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 65 00 COOLING TOWERS
23 82 00.00 20 TERMINAL HEATING AND COOLING UNITS
23 84 16.00 20 DESICCANT DEHUMIDIFICATION EQUIPMENT
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 23 00 LOW-VOLTAGE SWITCHGEAR
26 28 00.00 10 MOTOR CONTROL CENTERS, SWITCHBOARDS AND PANELBOARDS
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 32 14.00 10 DIESEL-GENERATOR SET, STATIONARY 15-300 KW, STANDBY
APPLICATIONS
26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH
26 51 00 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 29.00 10 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR SIPRNET
COMMUNICATION SYSTEMS
PROJECT TABLE OF CONTENTS Page 3
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 31 16.13 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 11 16 BASE COURSE FOR RIGID PAVING
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 11 00 WATER DISTRIBUTION
33 16 15 WATER STORAGE STEEL TANKS
33 30 00 SANITARY SEWERS
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13 JIB CRANE
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
SECTION 01 11 00
SUMMARY OF WORK
08/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM E2114 (2008) Standard Terminology for Sustainability Relative to the Performance of Buildings
1.2 DEFINITIONS
Definitions pertaining to sustainable development are as defined in ASTM E2114, Section 01 35 40.00 20 ENVIRONMENTAL MANAGEMENT and Section 01 57 20.00 10 ENVIRONMENTAL PROTECTION, and as specified.
a. "Environmentally preferable products" have a lesser or reduced effect on the environment in comparison to conventional products and services. This comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, or disposal of the product.
b. "Indoor environmental quality" is the physical characteristics of the building interior that impact occupants, including air quality, illumination, acoustics, occupant control, thermal comfort, daylighting, and views.
c. "Operational performance" is the functional behavior of the building as a whole or of the building components.
d. "Sustainability" is the balance of environmental, economic, and societal considerations.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Upon receipt of Government Furnished Equipment, the Contractor shall submit records in accordance with paragraph entitled, "Government Furnished Property," of this section.
Submit the following items to the Contracting Officer or Contracting Officer's Representative :
SECTION 01 11 00 Page 1
Utility Outage Requests Utility Connection Requests Borrow Permits Excavation Permits Welding Permits Burning Permits
SD-07 Certificates
Energy Performance Rating
1.4 WORK COVERED BY CONTRACT DOCUMENTS
1.4.1 Project Description
The work includes renovation/repair of Buildings 301 and 302 . Also included is associated site and utilities and incidental related work.
1.4.2 Location
The work shall be located at Buildings 301 and 302. Pennsylvania Air National Guard Base, Pittsburgh, Pennsylvania International Airport, Coraopolis, PA. approximately as indicated. The exact location will be shown by the Contracting Officer.
1.4.3 Project Phasing & Du rations
The project construction shall be executed in the phasing sequence indicated below. Each phase shall be completed in its entirety before the next phase is started. All close out documents shall be submitted to the Contracting Officer's Representative as prescribed by section 01 78 00, CLOSEOUT SUBMITTALS at the completion of each phase. The contractor is responsible for determining the sequence of work within each described phase. See G-sheet drawings for limits of work for each phase, locations of swing spaces, specific requirements for each user, and lists of specific equipment required to be relocated
At any given time, a minimum of one hangar bay between Buildings 301 and 302 shall be fully operational for military mission activities. A fully operational hangar is defined as a facility that is unimpeded by all construction activities and can be fully accessed and used by the Government. The project phasing indicated herein and on the G-sheet drawings is intended to maintain this requirement throughout the duration of the project
The contracting officer shall provide a written notice to proceed after the completion of each phase to the contractor before work can begin for the subsequent phase. The total project duration shall be 1,000 calendar days from initial written notice to proceed from the beginning of Phase 1 to the end of Phase 7.
1.4.3.1 Descriptions of Phasing and Durations
Phase 1:
a. All of civil site work
b. Construction of fire tanks, pump house, pumps, and lines between
SECTION 01 11 00 Page 2 pumps and HEF room. All fire protection equipment shall installed in the pump house, tested, and accepted.
c. Construction of new Mechanical, Electrical, and HEF room.
d.Move occupants out of Building 302 into fully prepared swing spaces
The contractor shall complete work in Phase 1 within 210 calendar days from the notice to proceed. The contractor shall notify the contracting officer's representative when work is complete and all close out documents have been submitted. The contracting officer's representative shall have a maximum of 14 calendar days to review the submitted close out documents and, if all contractor requirements have been met, a notice to proceed will be provided for phase 2
Phase 2:
a. Move occupants out of Building 302 into fully prepared swing spaces.
The contractor does not need a notice to proceed to continue work for Phase 3.
Phase 3:
a. Abatement of lead and asbestos materials in Building 302.
b. Renovation work of Building 302.
c. Mechanical system shall be tested and balanced. Commissioning and verification shall be performed on mechanical systems.
d. Complete electrical, security and communication systems are to be installed, verified and commissioned for building 302. Including but not limited to new electrical distribution, generator and inverters.
e. Submission of close out documents
The contractor shall complete work in Phases 2 and 3 within 330 calendar days from the notice to proceed for phase 2. The contractor shall notify the contracting officer's representative when work is complete and all close out documents have been submitted. The contracting officer's representative shall have a maximum of 14 calendar days to review the submitted close out documents and, if all contractor requirements have been met, a notice to proceed will be provided for phase 4.
Phase 4:
a. Move occupants into newly renovated Building 302
The contractor does not need a notice to proceed to continue work for Phase 5.
Phase 5:
a. Move occupants out of Building 301 into fully prepared swing
SECTION 01 11 00 Page 3 spaces.
The contractor does not need a notice to proceed to continue work for Phase 6.
Phase 6:
a. Renovation of Building 301
b. Abatement of lead and asbestos materials in Building 301
c. Mechanical system shall be tested and balanced. Commissioning and verification shall be performed on mechanical systems as prescribed by specifications.
d. Complete electrical, security and communication systems are to be installed, verified and commissioned for building 301. The new electrical distribution system for 301 shall be fed from building 302.
e. Demolition of existing fire pump and fire tank and restoration of site.
f. Submission of close out documents
g. Government acceptance of renovated spaces
The contractor shall complete work in Phases 4, 5, and 6 within 360 calendar days from the notice to proceed for Phase 3. The contractor shall notify the contracting officer and contracting officer's representative when work is complete and all close out documents have been submitted. The contracting officer's representative shall have a maximum of 14 calendar days to review the submitted close out documents and, if all contractor requirements have been met, a notice to proceed will be provided for Phase 7.
Phase 7:
a. Move occupants into newly renovated Building 301.
b. Remove temporary trailers from flightline ramp.
c. Remove temporary utilities serving temporary trailers.
d. Clean up of Building 304 after occupants have moved out of swing space.
1.4.3.2 Fire Protection Phasing
The fire protection work was designed to maintain full fire protection of the occupied hangar bay throughout construction. The existing fire pumps, tank, and AFFF system will provide protection to Hangar 301 during phases 1 through 3. The new pumps, tanks, and HEF system will provide protection to Hangar 302 after phase 3. The new pumps, tanks, and HEF system will provide protection to Hangar 301 after phase 6. The existing fire alarm and foam releasing systems are to remain functional throughout construction until the new systems have been tested and accepted
SECTION 01 11 00 Page 4
1.4.3.3 Electrical Distribution Phasing
The electrical work has been design to allow for one hangar and the surrounding spaces to be fully functional and used by the Government at any given time. During phase 1 the new distribution system is to be installed in the new electrical room while the existing electrical system is still being utilized. Once the new electrical service is established the contractor shall temporarily relocate electrical feeds for Building 301 to the new service and build new distribution for Building 302. During Phases 2 through 3, Building 302 and will be fully functional, while building 301 is being renovated. During this renovation the temporary feeds for Building 301 will be demolished along with the existing distribution systems. The new distribution system for Building 301 is to be installed and feed from new service established in phase 1. During phase 4 the entire electrical distribution system shall be fully functional
1.4.3.4 Mechanical Phasing
The mechanical systems are designed to be a full replacement of the existing mechanical systems. The mechanical systems have been designed to allow for one hangar and the surrounding spaces to be fully functional and used by the Government at any given time. If any component of the HVAC systems that is required to be demolished or rendered nonfunctional during a particular phase of the project that will disrupt the service an occupied space, the contractor shall provide temporary HVAC to those spaces. The SIPRNET room shall be remain operational during the entire construction process. Temporary HVAC shall be provided to the SIPRNET area while work on Building 302 is being performed. Connections feeding Building 301 spaces that are constructed during the Building 302 phase shall be isolated by valves and capped during the renovation of Building 302 phase to allow for easy installation and change over.
1.4.3.5 LEED commissioning
LEED commissioning will be performed by a third-party consultant hired by the A-E.
1.4.3.6 Contractor Conditions During Project Phases
Contractor does not need to demobilize and re-mobilize between each phase
The contractor's bond shall remain effective through the construction period between the beginning of Phase 1 and the end of Phase 7.
Contractor shall erect temporary partition wall in all areas between building areas that are occupied and areas under construction. Temporary partition walls shall be used to contain dust., and debris within construction area and to protect occupied areas from construction activities. Temporary partition walls shall be constructed to the satisfaction of the COR.
1.4.4 Requirements for Moving Building Occupants and Items
The contractor is responsible for moving all existing items for building occupants throughout the project. This includes, but not limited to, furniture, equipment, and miscellaneous items placed in boxes by the Government. The contractor is not required to move computers, phones, and other items identified by the Government. Contractor shall quantify all materials to be moved during the pre-proposal walk through; this will be
SECTION 01 11 00 Page 5 the contractor's sole opportunity to quantify materials to be moved.
Larger equipment that shall be moved by the contractor is indicated on sheet G-112. This list is not a comprehensive list of equipment; however, it should be used as general guidance for moving equipment during each phase.
The contractor shall use a specialty subcontractor for all moving work.
This subcontractor shall have experience and appropriate equipment for large scale moving operations similar to what is required for this project.
Equipment that is indicated on sheet G-112 shall be inspected by the Government and the contractor before it is moved and after it is setup.
This inspection shall be documented on form located at the end of this specification section. This form will serve as documentation of the condition of the equipment before and after the move. The condition of the equipment for each move (i.e. from the original location to the swing space location and the swing space location to the final location) will be documented. These forms will be maintained by the Government and the contractor if desired. The contractor is responsible for all damage incurred by the moving operation.
1.4.5 Description of Telecommunications and Electronic Security System Work
There are several base networks that need to be maintained during the renovation of Buildings 301 and 302. If these networks go offline they will disrupt communications in other buildings across the base. Building 302 houses one of the four base Information Transfer Notes (ITN). This ITN is in an Inter-Switch Trunk (IST) configuration with building 310 ITN providing hot standby failover capability and load sharing for the Command Post and Ops Ground and bi-directional routing for the base LAN. Building 302 houses the Base Network Control Center (BNCC) which hosts the primary base share drive, the base file plan server, the HBSS scanner, the wireless network server and client servers such as digital dental, fire department and the OPS PEX server. Building 302 houses the SIPRNET server and the head end CATV system for the base.
All telecommunications work shall be furnished, installed, and tested by the contractor including cabling, connectors, outlets, racks, patch panels, patch cords, fiber and fiber patch panels, labeling and testing.
All cable trays, conduit, patch panels and related items shall be part of the base bid package. The purchase, installation, testing and labeling of all communications equipment and wiring shall be a separate line item "Bid Option".
1.4.6 Work with SIPRNET Area
Power and communication to SIPRNET area shall be fully functional throughout entire project. All work within the SIPRNET Area shall be coordinated with the Contracting Office's Representative. All work shall be observed by the base personnel. If base personnel is not present, no work shall be completed. Access to SIPRNET area will be strictly controlled by the Government throughout the duration of the project.
1.5 PROJECT ENVIRONMENTAL GOALS
Contractor shall distribute copies of the Environmental Goals to each subcontractor and the Contracting Officer. The overall goal for design, construction, and operation is to produce a building that meets the
SECTION 01 11 00 Page 6 functional program needs and incorporates the principles of sustainability. Specifically:
a. Preserve and restore the site ecosystem and biodiversity; avoid site degradation and erosion. Minimize offsite environmental impact.
b. Use the minimum amount of energy, water, and materials feasible to meet the design intent. Select energy and water efficient equipment and strategies.
c. Use environmentally preferable products and decrease toxicity level of materials used.
d. Use renewable energy and material resources.
e. Optimize operational performance (through commissioning efforts) in order to ensure energy efficient equipment operates as intended.
Consider the durability, maintainability, and flexibility of building systems.
f. Manage construction site and storage of materials to ensure no negative impact on the indoor environmental quality of the building.
g. Reduce construction waste through reuse, recycling, and supplier take-back.
1.6 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.7 ON-SITE PERMITS
1.7.1 Utility Outage Requests and Utility Connection Requests
Notify the Contracting Officer 's Representative at least 72 hours prior to starting excavation work. Contractor is responsible for marking and verifying all utilities not marked.
The Contractor shall verify the elevations of existing piping, utilities, and any type of underground obstruction not indicated or specified to be removed. But indicated in locations to be transversed by piping, ducts, and other work to be installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
Work shall be scheduled to hold outages to a minimum.
Utility outages and connections required during the prosecution of work that affect existing systems shall be arranged for at the convenience of
SECTION 01 11 00 Page 7 the Government and shall be scheduled outside the regular working hours or on weekends.
Contracting Officer 's Representative may permit utility outages at his discretion.
Contractor shall not be entitled to additional payment for utility outages and connections required to be performed outside the regular work hours.
Requests for utility outages and connections shall be made in writing to the Contracting Officer 's Representative at least 14 calendar days in advance of the time required. Each request shall state the system involved, area involved, approximate duration of outage, and the nature of work involved.
1.7.2 Borrow, Excavation, Welding, and Burning Permits
ACTIVITY SUBMISSION DATE SUBMISSION FORM
Borrow Permits 15 calendar days prior to work
Coordinate with Base Civil Engineer
Burning Permits 15 calendar days prior to work
Coordinate with Base Civil Engineer
Excavation Permits 15 calendar days prior to work
Coordinate with Base Civil Engineer
Welding Permits 15 calendar days prior to work
Coordinate with Base Civil Engineer
Permits shall be posted at a conspicuous location in the construction area.
Burning of trash or rubbish is not permitted .
1.8 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation by contacting the Contracting Officer 's Representative 15 calendar days in advance . Scan the construction site with Ground Penetrating Radar and electromagnetic or sonic equipment, and mark the surface of the ground, where existing underground utilities or utilities encased in pier structures are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated to be specified or removed but indicated or discovered during scanning in locations to be traversed by piping, ducts, and other work to be conducted or installed.
Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.8.1 Notification Prior to Excavation
Notify the Contracting Officer 's Representative at least 15 days prior to starting excavation work.
SECTION 01 11 00 Page 8
1.9 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged shall remain the property of the Government.
The salvaged property shall be segregated, itemized, delivered, and off-loaded at the Government designated storage area located within 2 miles of the construction site. Soil and rocks must be separated prior to delivery to the storage area.
Contractor shall maintain property control records for material or equipment designated as salvage. Contractor's system of property control may be used if approved by the Contracting Officer. Contractor shall be responsible for storage and protection of salvaged materials and equipment until disposition by the Contracting Officer.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 9
SHOP/PERSONNEL -
WING
NOMENCLATURE
POND
NOMENCLATURE
QUANITY ITEM
BLDG./HGR
(CURRENT
LOCATION)
RM. #
(CURRENT
LOCATION)
EQUIPMENT
MOVED TO
Munitions MUNITIONS 4 EA.
DESKS (ONE WITH TOP
BOOKSHELF/FILE CABINET) 302 101 Trailer
Munitions MUNITIONS 1 EA.
FILE CABINET WITH TOP
BOOKSHELF 302 101 Trailer
Munitions MUNITIONS 1 EA. 100LB. SAFE 302 101 Trailer Munitions MUNITIONS 1 EA. SOFA 302 101 Trailer Munitions MUNITIONS 4 EA. CHAIRS 302 101 Trailer Munitions MUNITIONS 3 EA. LOCKERS 302 101 Trailer Munitions MUNITIONS 1 EA. WALL MOUNTED CUPBOARD 302 101 Trailer Munitions MUNITIONS 1 EA. TV 302 101 Trailer Munitions MUNITIONS 1 EA. TV STAND 302 101 Trailer Munitions MUNITIONS 1 EA. PRINTER 302 101 Trailer Munitions MUNITIONS 1 EA. SHREDDER 302 101 Trailer Munitions MUNITIONS 3 EA. COMPUTERS 302 101 Trailer Munitions MUNITIONS 3 EA. NOTEBOOKS 302 101 Trailer Munitions MUNITIONS 1 EA. COAT RACK 302 101 Trailer Munitions MUNITIONS 2 EA. TRASH CANS 302 101 Trailer Munitions MUNITIONS 1 EA. MICROWAVE 302 101 Trailer Munitions MUNITIONS 1 EA. MICROWAVE STAND 302 101 Trailer Munitions MUNITIONS 1 EA. RECYCLING BIN 302 101 Trailer
Flightline MX FLIGHTLINE 1 EA. MAIL CENTER
146 (TOOL
ROOM) 304
Flightline MX FLIGHTLINE 5 EA. PELICAN BOXES
146 (TOOL
ROOM) 304
Flightline MX FLIGHTLINE 7 EA. TOOL BOXES
146 (TOOL
ROOM) 304
Flightline MX FLIGHTLINE 7 EA. SHELVING UNITS
146 (TOOL
ROOM) 304
Flightline MX FLIGHTLINE 4 EA. 4'X8' PPE BOARDS
146 (TOOL
ROOM) 304
Flightline MX FLIGHTLINE 4 EA. LOCKERS ( 3 FLAMMABLE 1 PMEL)
146 (TOOL
ROOM) 304
Flightline MX FLIGHTLINE 2 EA. SHADOW BOARDS
146 (TOOL
ROOM) 304
Flightline MX FLIGHTLINE 1 EA. DESK
146A ( TOOL
ROOM OFFICE) 304
Flightline MX FLIGHTLINE 1 EA. PRINTER
146A ( TOOL
ROOM OFFICE) 304
Flightline MX FLIGHTLINE 2 EA. FILING CABINET
146A ( TOOL
ROOM OFFICE) 304
Flightline MX FLIGHTLINE 1 EA. COMM STORAGE CABINET
146A ( TOOL
ROOM OFFICE) 304
Flightline MX FLIGHTLINE 6EA. COMPUTER DESKS
147 ( FLIGHT
LINE OFFICE) 304
Flightline MX FLIGHTLINE 1 EA. COPIER
147 ( FLIGHT
LINE OFFICE) 304
Flightline MX FLIGHTLINE 1 EA. FAX
147 ( FLIGHT
LINE OFFICE) 304
Flightline MX FLIGHTLINE 1 EA. PRINTER
147 ( FLIGHT
LINE OFFICE) 304
Flightline MX FLIGHTLINE 1 EA. SHREDDER
147 ( FLIGHT
LINE OFFICE) 304
Flightline MX FLIGHTLINE 1 EA. REFRIGERATOR
147 ( FLIGHT
LINE OFFICE) 304
Flightline MX FLIGHTLINE 2 EA. FILING CABINETS
147 ( FLIGHT
LINE OFFICE) 304
Flightline MX FLIGHTLINE 1 EA. BOOK SHELF
147 ( FLIGHT
LINE OFFICE) 304
Flightline MX FLIGHTLINE 1 EA. DRY ERASE BOARD
147 ( FLIGHT
LINE OFFICE) 304
Flightline MX FLIGHTLINE 2 EA. BULLETIN BOARDS
147 ( FLIGHT
LINE OFFICE) 304
Flightline MX FLIGHTLINE 7 EA. PERSONAL LOCKERS
148 ( FLIGHT
LINE OFFICE
PERSONNEL) 304
Flightline MX FLIGHTLINE 6 EA. PERSONAL LOCKERS
151 ( WOMENS
LATRINE) 304
Flightline MX FLIGHTLINE 3 EA. REFRIGERATORS
153 ( FLIGHT
LINE BREAK
ROOM) 304
Flightline MX FLIGHTLINE 6 EA. COUCHES
153 ( FLIGHT
LINE BREAK
ROOM) 304
Flightline MX FLIGHTLINE 46 EA. CHAIRS
153 ( FLIGHT
LINE BREAK
ROOM) 304
Flightline MX FLIGHTLINE 1 EA. COFFEE MAKER
153 ( FLIGHT
LINE BREAK
ROOM) 304
Flightline MX FLIGHTLINE 4 EA. MICROWAVES
153 ( FLIGHT
LINE BREAK
ROOM) 304
Flightline MX FLIGHTLINE 1 EA. COFFEE FUND LOCKER
153 ( FLIGHT
LINE BREAK
ROOM) 304
Flightline MX FLIGHTLINE 1 EA. POP MACHINE
153 ( FLIGHT
LINE BREAK
ROOM) 304
Flightline MX FLIGHTLINE 1 EA. CANDY MACHINE
153 ( FLIGHT
LINE BREAK
ROOM) 304
Flightline MX FLIGHTLINE 1 EA. TELEVISION
153 ( FLIGHT
LINE BREAK
ROOM) 304
Flightline MX FLIGHTLINE 1 EA. TOASTER
153 ( FLIGHT
LINE BREAK
ROOM) 304
Flightline MX FLIGHTLINE 1 EA. TOASTER OVEN
153 ( FLIGHT
LINE BREAK
ROOM) 304
Flightline MX FLIGHTLINE 1 EA. AIRCRAFT STATUS/TRIP BOARD
153 ( FLIGHT
LINE BREAK
ROOM) 304
Flightline MX FLIGHTLINE 1 EA. SAFETY BOARD
153 ( FLIGHT
LINE BREAK
ROOM) 304
Flightline MX FLIGHTLINE 6 EA. COMPUTER STATIONS
155 (COMPUTER
ROOM) 304
Flightline MX FLIGHTLINE 2 EA. PRINTERS
155 (COMPUTER
ROOM) 304
Flightline MX FLIGHTLINE 1 EA. SHREDDER
155 (COMPUTER
ROOM) 304
Flightline MX FLIGHTLINE 1 EA. 2 DRAWER FILING CABINET
155 (COMPUTER
ROOM) 304
Flightline MX FLIGHTLINE 1 EA. CREDENSA'
155 (COMPUTER
ROOM) 304
Flightline MX FLIGHTLINE 9 EA. CHAIRS
155 (COMPUTER
ROOM) 304
Flightline MX FLIGHTLINE 1 EA. DRY ERASE BOARD
155 (COMPUTER
ROOM) 304
Flightline MX FLIGHTLINE 1 EA. BULLETIN BOARD
155 (COMPUTER
ROOM) 304
Flightline MX FLIGHTLINE 48 EA. PERSONAL LOCKERS
156 ( FLIGHT
LINE LOCKER
ROOM) 304
Flightline MX FLIGHTLINE 6 EA. 18 PERSON PPE LOCKERS 157 304
Flightline MX FLIGHTLINE 65 EA. PERSONAL LOCKERS
247 (UPSTAIRS
LOCKER ROOM) 304
Flightline MX FLIGHTLINE 12 EA. BENCHES
247 (UPSTAIRS
LOCKER ROOM) 304
Flightline MX FLIGHTLINE 1 EA. TAIL NUMBER BIN UNIT 302 153 (OUTSIDE) 304 Flightline MX FLIGHTLINE 1 EA. FLAMMABLE LOCKER 302 146 (OUTSIDE) 304 Flightline MX FLIGHTLINE 2 EA. FLAMMABLE LOCKERS 302 153 (OUTSIDE) 304 Flightline MX FLIGHTLINE 3 EA. TELEVISIONS 146, 147, 153 DRMO Flightline MX FLIGHTLINE 2 EA. BULLETIN BOARDS 147 DRMO
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 2 EA. DESKS 302 235 Trailer
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 2 EA. ORGANIZERS 302 235 Trailer
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 2 EA. COMPUTERS 302 235 Trailer
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 4 EA. MONITORS 302 235 Trailer
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 2 EA. KEYBOARDS 302 235 Trailer
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 2 EA. MOUSES 302 235 Trailer
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. LAPTOP 302 235 Trailer
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 2 EA. CHAIRS 302 235 Trailer
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. TV 302 235 Trailer
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. SMALL REFRIGERATOR 302 235 Trailer
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 2 EA. PHONES 302 235 Trailer
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. MICROWAVE 302 235 Trailer
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. H20 DISPENSER 302 235 Trailer
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. PAPER SHREDDER 302 235 Trailer
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. PRINTER 302 235 Trailer
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. SHELVING UNIT 302 235 Trailer
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 2 EA. TOP HALF SHELVING UNITS 302 235 Trailer
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 2 EA. LOCKERS 302 235 Trailer
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 2 EA. GARBAGE CANS 302 235 Trailer
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) ?
MULTIPLE BINDERS OF ACFT
HISTORY 302 235 Trailer
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) ?
MULTIPLE MX PERFORMANCE
BINDERS 302 235 Trailer
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 6 EA. BOXES OF SUPPLIES 302 235 Trailer
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 2 EA. COMPUTERS 302 235 Storage
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 3 EA. MONITORS 302 235 Storage
MOF Analysis
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 4 EA. SMALL FILING CABINETS 302 235 Storage
MOF Support/OIC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. WORKSTATION 302 238 Trailer
MOF Support/OIC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. DESK 302 238 Trailer
MOF Support/OIC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 2 EA. COMPUTERS 302 238 Trailer
MOF Support/OIC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 4 EA. MONITORS 302 238 Trailer
MOF Support/OIC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 3 EA. CHAIRS 302 238 Trailer
MOF Support/OIC
MAINTENANCE
FLIGHT (MOF) 1 EA. TV 302 238 Trailer
MOF Support/OIC
OPERATIONS
FLIGHT (MOF) 1 EA. FILE CABINET 302 238 Trailer
MOF Support/OIC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 2 EA. LOCKERS 302 238 Trailer
MOF Support/OIC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. SMALL TABLE 302 238 Trailer
MOF Support/OIC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 8 EA. LARGE BOXES 302 238 Storage
MOF P&S
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 3 EA. DESKS 302 236 Trailer
MOF P&S
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 3 EA. COMPUTERS 302 236 Trailer
MOF P&S
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 6 EA. CHAIRS 302 236 Trailer
MOF P&S
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 3 EA. PHONES(7322)(7399)(7304) 302 236 Trailer
MOF P&S
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. TABLE 302 236 Trailer
MOF P&S
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA.
WHOLE FILE PLAN-CABINETS BY
MOC DOOR/BEHIND DESK 302 236 Trailer
MOF P&S
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. TV 302 236 Trailer
MOF P&S
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. COPIER 302 236 Trailer
MOF P&S
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. PRINTER AND IT'S SHELF 302 236 Trailer
MOF P&S
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. SHREDDER 302 236 Trailer
MOF P&S
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 4 EA.
LOCKERS FROM THE LOCKER
ROOM 302 236 Trailer
MOF P&S
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. LOCKER/CABINET TV IS ON 302 236 Trailer
MOF P&S
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. REFRIDGERATOR 302 236 Trailer
MOF RA
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 2 EA. WORKSTATIONS 301 205 Trailer
MOF RA
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 2 EA. FILING CABINETS 301 205 Trailer
MOF RA
MAINTENANCE
FLIGHT (MOF) 1 EA. LOCKER 301 205 Trailer
MOF RA
OPERATIONS
FLIGHT (MOF) 4 EA. CHAIRS 301 205 Trailer
MOF RA
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 2 EA. COMPUTERS/MONITORS 301 205 Trailer
MOF RA
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 6 EA. LARGE BOXES 301 205 Trailer
MOF RA
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. REFRIGERATOR 301 205 Trailer
MOC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 3 EA. WORK STATIONS (DESKS) 302 237 Trailer
MOC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 5 EA. COMPUTERS 302 237 Trailer
MOC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 7 EA. MONITORS 302 237 Trailer
MOC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA.
BACK UP BATTERY FOR
COMPUTERS 302 237 Trailer
MOC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 6 EA. CHAIRS 302 237 Trailer
MOC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 2 EA. PLASMA TV 302 237 Trailer
MOC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. CREDENZA 302 237 Trailer
MOC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 9 EA. LOCKERS 302 237 Trailer
MOC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. PRINTER 302 237 Trailer
MOC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. TABLE FOR PRINTER 302 237 Trailer
MOC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 4 EA.
PHONES TO INCLUDE THE STE
AND CRASH NET 302 237 Trailer
MOC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. UHF RADIO/SPEAKERS 302 237 Trailer
MOC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. TABLE FOR UHF RADIO 302 237 Trailer
MOC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 2 EA. GARBAGE CANS 302 237 Trailer
MOC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 1 EA. STORAGE CREDENZA 302 237 Trailer
MOC
MAINTENANCE
FLIGHT (MOF) 25 EA. BINDERS/CHECKLIST 302 237 Trailer
MOC
OPERATIONS
FLIGHT (MOF) 1 EA. SHELTER IN PLACE SUPPLIES 302 237 Trailer
MOC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 2 EA.
LARGE BOXES FOR MISC STUFF
(pens, personal items) 302 237 Trailer
MOC
MAINTENANCE
OPERATIONS
FLIGHT (MOF) 2 EA. LARGE BOXES 302 237 Storage
Structural -Decal Room Equip. DECAL ROOM 1 EA. DECAL ROOM EQUIPMENT 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA. PPE STORAGE LOCKERS 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA. DECAL VIDMAR 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA. TRAINING RECORD CABINET 302 162 304 Structural -Decal Room Equip. DECAL ROOM 2 EA. GERBER SUPPLY CABINET 302 162 304 Structural -Decal Room Equip. DECAL ROOM 2 EA. DECAL STORAGE DRAWER UNIT 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA. GERBER PLOTTER, LARGE 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA. GERBER PRINTER, LARGE 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA. GERBER PRINTER, SMALL 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA. GERBER PLOTTER, SMALL 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA.
GERBER PC & MONITOR &
SCANNER 302 162 304
Structural -Decal Room Equip. DECAL ROOM 1 EA. GERBER WORKSTATION DESK 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA. GERBER EQUIPMENT TABLE 302 162 304 Structural -Decal Room Equip. DECAL ROOM 2 EA. DECAL PREP TABLES 302 162 304 Structural -Decal Room Equip. DECAL ROOM 2 EA. DECAL STORAGE WALL UNIT 302 162 304 Structural -Decal Room Equip. DECAL ROOM 3 EA.
COLD WEATHER GEAR STORAGE
UNIT 302 162 304
Structural -Decal Room Equip. DECAL ROOM 1 EA.
PPE CLEANING EQUIPMENT &
SHELF 302 162 304
Structural -Decal Room Equip. DECAL ROOM 5 EA. NETWORK PC & MONITOR 302 162 304 Structural -Decal Room Equip. DECAL ROOM 2 EA. NETWORK PRINTER 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA. SMCO OFFICE EQUIPMENT 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA. SHREDDER 302 162 304 Structural -Decal Room Equip. DECAL ROOM 2 EA. FILE CABINET (Supervisor) 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA. BOOKSHELF (Supervisor) 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA. SUPERVISOR OFFICE FURNITURE 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA. STORAGE LOCKER 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA. WATER COOLER UNIT 302 162 304
Structural -Decal Room Equip. DECAL ROOM 1 EA. REFRIDGERATOR 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA. POP MACHINE 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA.
TRAINING VIDEO STORAGE
CABINET 302 162 304
Structural -Decal Room Equip. DECAL ROOM 1 EA. TV & DVD/VCR 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA.
SHOP EQUIPMENT AND TOOLING
CATALOGS (5bxs) 302 162 304
Structural -Decal Room Equip. DECAL ROOM 1 EA. CLEANING SUPPLY LOCKER 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA. PPE STORAGE LOCKERS 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA. DECAL VIDMAR 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA. TRAINING RECORD CABINET 302 162 304 Structural -Decal Room Equip. DECAL ROOM 2 EA. GERBER SUPPLY CABINET 302 162 304 Structural -Decal Room Equip. DECAL ROOM 2 EA. DECAL STORAGE DRAWER UNIT 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA. GERBER PLOTTER, LARGE-110V 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA. GERBER PRINTER, LARGE 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA. GERBER PRINTER, SMALL-110V 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA. GERBER PLOTTER, SMALL-110V 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA.
GERBER PC & MONITOR &
SCANNER-110V 302 162 304
Structural -Decal Room Equip. DECAL ROOM 1 EA. GERBER WORKSTATION DESK 302 162 304 Structural -Decal Room Equip. DECAL ROOM 1 EA. GERBER EQUIPMENT TABLE 302 162 304 Structural -Decal Room Equip. DECAL ROOM 2 EA. DECAL PREP TABLES 302 162 304 Structural -Decal Room Equip. DECAL ROOM 2 EA. DECAL STORAGE WALL UNIT 302 162 304 Structural -Decal Room Equip. DECAL ROOM 3 EA.
COLD WEATHER GEAR STORAGE
UNIT 302 162 304
Structural -Decal Room Equip. DECAL ROOM 1 EA.
PPE CLEANING EQUIPMENT &
SHELF 302 162 304
Structural -Decal Room Equip. DECAL ROOM 5 EA. NETWORK PC & MONITOR-110V 302 162 304 Structural -Decal Room Equip. DECAL ROOM 2 EA. NETWORK PRINTER-110V 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. SANDER-208V&AIR 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. DRILL PRESS-220V 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 5 EA. VACUUMS-110V 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. ENGLISH WHEEL 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. NOTCHER 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. FOOTSHEAR 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. POWERSHEAR-230V 3 PHASE 302 162 304
Shop Equip. METAL SHOP 1 EA.
TUBING BENDER W/TOOLING
VIDMAR 302 162 304
Structural -SMCO Shop Equip. METAL SHOP 1 EA. GRINDER-110V 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. MINI SANDER-110V 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. ROTEX PUNCH 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA.
TUBING FLARING MACHINE-440V
3 PHASE & AIR 302 162 304
Structural -SMCO Shop Equip. METAL SHOP 1 EA. BAND SAW-230V 3 PHASE 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. SM-15 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. DIMPLER-110V & AIR 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. SLIP ROLLER 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. SHRINKER 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. STRETCHER 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. BAR FOLDER 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. SM-12 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. SM-13 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 2 EA. VISE & PEDESTAL 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. SM-25 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 2 EA. WORK TABLES 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. HAZ MAT CABINET 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. TOOL LOCKER 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. CHEMICAL REFRIDGERATOR-110V 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. SHOP SUPPLY VIDMAR 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. SHOP EQUIPMENT CABINET 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. TC MAX PC & MONITOR-110V 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. SM-10 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. LMR STATION 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. FLASHLIGHT BANK-110V 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA.
DRILL BATTERY BANK (11 PCS)-
110V 302 162 304
Structural -SMCO Shop Equip. METAL SHOP 1 EA. SHOP / BENCH STOCK VIDMARS 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 3 EA. BAG ROLL HOLDERS 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. HAZ CHEMICAL LOCKER 302 162 304
Shop Equip. METAL SHOP 1 EA. BOX & PAN BRAKE 302 162 304
Shop Equip. METAL SHOP 2 EA. WYPALL HOLDER 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. PPE CLEANING CABINET 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. SAFETY MIRROR 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 2 EA. SCRAP METAL BARREL 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. METAL STORAGE VIDMAR 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. BROOM RACK 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. LO/TO BOARD 302 162 304 Structural -SMCO Shop Equip. METAL SHOP 1 EA. RECYCLE BATTERY BOX 302 162 304 Structural -SMCO Office Equip. METAL SHOP 1 EA. SHREDDER 302 162 304 Structural -SMCO Office Equip. METAL SHOP 1 EA. FILE CABINET (Supervisor) (2ea) 302 162 304 Structural -SMCO Office Equip. METAL SHOP 1 EA. BOOKSHELF (Supervisor) 302 162 304 Structural -SMCO Office Equip. METAL SHOP 1 EA. SUPERVISOR OFFICE FURNITURE 302 162 304 Structural -SMCO Office Equip. METAL SHOP 1 EA. STORAGE LOCKER 302 162 304 Structural -SMCO Office Equip. METAL SHOP 1 EA. WATER COOLER UNIT-110V 302 162 304 Structural -SMCO Office Equip. METAL SHOP 1 EA. REFRIDGERATOR-110V 302 162 304 Structural -SMCO Office Equip. METAL SHOP 1 EA. POP MACHINE-110V 302 162 304 Structural -SMCO Office Equip. METAL SHOP 1 EA.
TRAINING VIDEO STORAGE
CABINET 302 162 304
Structural -SMCO Office Equip. METAL SHOP 1 EA. TV & DVD/VCR-110V 302 162 304 Structural -SMCO Office Equip. METAL SHOP 1 EA.
SHOP EQUIPMENT AND TOOLING
CATALOGS (5bxs) 302 162 304
Structural -SMCO Office Equip. METAL SHOP 1 EA. CLEANING SUPPLY LOCKER 302 162 304 Structural -SMCO Equip Hangar 302. METAL SHOP 2 EA.
CHEM BAG AND SUPPLY LOCKERS
(from hangar) 302 162 304
Structural -SMCO Equip Hangar 302. METAL SHOP 1 EA. METAL STORAGE RACK 302 162 304 Structural -SMCO Equip Hangar 302. METAL SHOP 1 EA. MOPS & BUCKETS 302 162 304 Structural -SMCO Equip Hangar 302. METAL SHOP 1 EA. HOT BONDER 302 162 304 Structural -SMCO Equip Hangar 302. METAL SHOP 1 EA. CLAYTON VACUUM 302 162 304 Structural -SMCO Equip Hangar 302. METAL SHOP 1 EA. COMPOSITE MATERIAL RACK 302 162 304 Structural -SMCO Equip Hangar 302. METAL SHOP 1 EA. SHOP STOCK OVERFLOW VIDMAR 302 162 304 Structural -SMCO Equip Hangar 302. METAL SHOP 1 EA. TUBING STORAGE 302 162 304 Structural -SMCO Equip Hangar 302. METAL SHOP 1 EA. SM-6 302 162 304 Structural -SMCO Equip Hangar 302. METAL SHOP 1 EA. SM-8 302 162 304
Equip Hangar 302. METAL SHOP 1 EA. CAGE 302 162 304
Equip Hangar 302. METAL SHOP 1 EA. WEIGHT & BALANCE FIXTURE 302 162 304 Structural -SMCO Equip Hangar 302. METAL SHOP 1 EA.
ACCURPRESS MACHINE-208V 3
PHASE 302 162 304
Electrical Environmental E&E 1 EA. VIDMAR, BENCH STOCK 302 139 Engine Shop Electrical Environmental E&E 1 EA. VIDMAR, OXYGEN BENCH STOCK 302 139 Engine Shop Electrical Environmental E&E 1 EA. VIDMAR, WORK ORDER RESIDUE 302 139 Engine Shop Electrical Environmental E&E 1 EA. VIDMAR, IN-SHOP TOOLBOX 302 139 Engine Shop Electrical Environmental E&E 1 EA. LOCKER, WIRE SUPPLIES 302 139 Engine Shop Electrical Environmental E&E 1 EA. LOCKER, TAIL NUMBER BIN 302 139 Engine Shop Electrical Environmental E&E 1 EA. LOCKER, SQUIB 302 139 Engine Shop Electrical Environmental E&E 1 EA.
WORKBENCH, LARGE, W/
ATTACHED VISE 302 139 Engine Shop
Electrical Environmental E&E 2 EA. WORKBENCH, LARGE 302 139 Engine Shop Electrical Environmental E&E 1 EA. WORKBENCH, SMALL 302 139 Engine Shop Electrical Environmental E&E 1 EA. SOLDER STATION 302 139 Engine Shop Electrical Environmental E&E 1 EA. CTK STORAGE RACK 302 139 Engine Shop Electrical Environmental E&E 3 EA. MINI CTKS (DISPATCHABLE) 302 139 Engine Shop Electrical Environmental E&E 1 EA. OXYGEN MAINTENANCE CTK 302 139 Engine Shop Electrical Environmental E&E 1 EA. IDG/ACM CTK 302 139 Engine Shop Electrical Environmental E&E 2 EA. MULTIMETER KITS 302 139 Engine Shop Electrical Environmental E&E 1 EA. HEATING TOOLKIT 302 139 Engine Shop Electrical Environmental E&E 1 EA.
HEATING TOOLKIT RECHARGER
KIT 302 139 Engine Shop
Electrical Environmental E&E 1 EA. WIRE MAINTENANCE KIT 302 139 Engine Shop Electrical Environmental E&E 1 EA. CTK KEY LOCKBOX 302 139 Engine Shop Electrical Environmental E&E 8 EA.
SHOP COMPUTERS (2 DESKTOP, 6
LAPTOP/ETOOL) 302 139 Engine Shop
Electrical Environmental E&E 1 EA.
PPE STORAGE (CURRENTLY A
WALL MOUNTED BOARD) 302 139 Engine Shop
Electrical Environmental E&E 2 EA.
BATTERY CHARGERS,
DEPLOYMENT PACKED/ROTATING
USAGE 302 139 Engine Shop
Electrical Environmental E&E 3 EA.
220VAC, 3 PRONG
ROTATING/LOCKING
RECEPTACLES (TAKE FROM OLD
BATTERY SHOP) 302 139 Engine Shop
Electrical Environmental E&E 1 EA. PERSONAL GEAR LOCKER 302 138 Engine Shop Electrical Environmental E&E 3 EA.
BATTERY CHARGERS, SET UP FOR
USAGE 302 140 Engine Shop
Electrical Environmental E&E 2 EA.
BATTERY CHARGERS,
DEPLOYMENT PACKED/ROTATING
USAGE 302 140 Engine Shop
Electrical Environmental E&E 3 EA.
220VAC, 3 PRONG
ROTATING/LOCKING
RECEPTACLES (TAKE FROM OLD
BATTERY SHOP) 302 140 Engine Shop
Electrical Environmental E&E 1 EA.
CHEMICAL STORAGE FIRE LOCKER
(REQUIRES STATIC GROUNDING) 302 140 Engine Shop
Electrical Environmental E&E 1 EA. BOTTLE SERVICING STAND 302 126 Engine Shop Electrical Environmental E&E 1 EA. BOTTLE STORAGE RACK 302 126 Engine Shop Electrical Environmental E&E 1 EA.
VIDMAR, BOTTLE MAINTENANCE
TOOLS 302 126 Engine Shop
Electrical Environmental E&E 1 EA. AIR VISE, BOTTLE 302 126 Engine Shop Electrical Environmental E&E 1 EA. C02 BOTTLE CRADLE ASSEMBLY 302 126 Engine Shop Electrical Environmental E&E 1 EA. C02 BOTTLE STORAGE RACK 302 126 Engine Shop Electrical Environmental E&E 1 EA.
CHEMICAL GEAR STORAGE (ROLL
AWAY BIN) 302 126 Engine Shop
Electrical Environmental E&E 1 EA. DESK 302 138A Engine Shop Electrical Environmental E&E 1 EA.
COMPUTER STAND
W/COMPUTER AND PRINTER 302 138A Engine Shop
Electrical Environmental E&E 1 EA. OFFICE SUPPLY LOCKER 302 138A Engine Shop Electrical Environmental E&E 1 EA.
PERSONAL RECORDS FILE
CABINET 302 138A Engine Shop
Electrical Environmental E&E 1 EA.
IPAD STORAGE/CHARGING
CABINET 302 138A Engine Shop
Electrical Environmental E&E 2 EA.
This is the start of the file's text. The full file is on GovTribe.