Sketch_01_-_B570_Boiler_Piping_Diagram.pdf
PDF 193 KB Posted
- Attached to
- Replace Bldg. 570 Boiler "Mulligans"
- Solicitation number
- W912JB-19-Q-5013
About this file
Boiler Piping Diagram
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P1
T1
B/570
BOILER
HWS
CALL
HWR
ISOLATION
VALVE
(TYP)
UNION
(TYP)
PRIMARY
LOOP
TACO
SR501
TEE
SECONDARY
LOOP
BUILDING 570 - NEW BOILER
NATURAL GAS CONNECTION & EXHAUST NOT SHOWN
T2
OS
RESET
P2BP2A
TEE
TEE
TEE
SHEET OF
Project Number:
Scale:
Date: 20190521
N.T.S.
VGLZ 182039
PROJECT
BULD. 570 BOILER
PIPING DIAGRAM
1 1
Drawn By:
A. VERMEERSCH
\\127WG-FS-01\127WG_Shared\127WG_Shared\127 Mission_Support_Group\127th Civil Engineering Sq\CES_CECE Engineers\AutoCAD Users\CE Shared AutoCAD Settings\Templates\Template Graphics\127 Wing Patch Scan 600dpi001.tifP:\CES_CECE Engineers\AutoCAD Users\CE Shared AutoCAD Settings\Templates\Template Graphics\CE Color PATCH small.jpg
NOTES
1. USE TACO SR501
2. ISOLATION VALVES AND UNIONS AT
PUMP AND BOILER
3. P1 SUPPLIED WITH BOILER OR BY
CONTRACTOR
4. TEE OFF ELBOW - 12" MIN
5. TEES SEPARATED - 24" MIN
6. MAKE PARALLEL PIPING ON P2
EQUAL.
SKETCH 01
AutoCAD SHX Text
SELFRIDGE AIR NATIONAL
AutoCAD SHX Text
GUARD BASE, MICHIGAN
AutoCAD SHX Text 127th Wing/Civil Engineer
| Sheets and Views |
| ANSI A 8x11L |
File details come from the government source that posted it.