Sketch_01_-_B570_Boiler_Piping_Diagram.pdf

PDF 193 KB Posted

Attached to
Replace Bldg. 570 Boiler "Mulligans"
Solicitation number
W912JB-19-Q-5013
Issued by

About this file

Boiler Piping Diagram

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P1

T1

B/570

BOILER

HWS

CALL

HWR

ISOLATION

VALVE

(TYP)

UNION

(TYP)

PRIMARY

LOOP

TACO

SR501

TEE

SECONDARY

LOOP

BUILDING 570 - NEW BOILER

NATURAL GAS CONNECTION & EXHAUST NOT SHOWN

T2

OS

RESET

P2BP2A

TEE

TEE

TEE

SHEET OF

Project Number:

Scale:

Date: 20190521

N.T.S.

VGLZ 182039

PROJECT

BULD. 570 BOILER

PIPING DIAGRAM

1 1

Drawn By:

A. VERMEERSCH

\\127WG-FS-01\127WG_Shared\127WG_Shared\127 Mission_Support_Group\127th Civil Engineering Sq\CES_CECE Engineers\AutoCAD Users\CE Shared AutoCAD Settings\Templates\Template Graphics\127 Wing Patch Scan 600dpi001.tifP:\CES_CECE Engineers\AutoCAD Users\CE Shared AutoCAD Settings\Templates\Template Graphics\CE Color PATCH small.jpg

NOTES

1. USE TACO SR501

2. ISOLATION VALVES AND UNIONS AT

PUMP AND BOILER

3. P1 SUPPLIED WITH BOILER OR BY

CONTRACTOR

4. TEE OFF ELBOW - 12" MIN

5. TEES SEPARATED - 24" MIN

6. MAKE PARALLEL PIPING ON P2

EQUAL.

SKETCH 01

AutoCAD SHX Text

SELFRIDGE AIR NATIONAL

AutoCAD SHX Text

GUARD BASE, MICHIGAN

AutoCAD SHX Text 127th Wing/Civil Engineer

Sheets and Views
ANSI A 8x11L

File details come from the government source that posted it.