W912JB-19-B-5010
BLDG 825 ROOF REPAIR
RFI’S
1. Was there any diagram or technical specs on the profile of the metal ribbing in the existing roof?
Specifically, the width between ribs and height/ shape of rib.
As-built plans do not call out specific detail on standing seam panel. Standing seam width between ribs is approximately 16 1/8 ” and the height is approximately 1 7/8”. With a rolled over seam which appears to be a ¾” double lock seam. Recommend field verify as measurements are approximates.
2. Also, why did the bid due date get moved up? Is that normal?
Because FAR 14 projects are only required to be solicited for 30 days. This project was over that timeframe, and we adjusted for the 30 days.