Schedule of material submittals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912JB-18-R-9005_Amendment_-4.pdf | ||
| Alpena_Wage_Determination__20Jul2018.pdf | ||
| W912JB-18-P-9005-0003.pdf | ||
| RFI-002.docx | DOCX document | |
| Evaluation_Factor_Amendment_(Asphalt_Path)_-0002.docx | DOCX document | |
| W912JB-18-R-9005-0002.pdf | ||
| Site_Visit_Minutes_and_Sign_in_Sheet.pdf | ||
| RFI-001.docx | DOCX document | |
| (Amended-0001)_SOW_TDVG182002_Construct_Asphalt_Walking_Path_South_of_River_Club_Rd_Rev....doc | DOC document | |
| W912JB-18-R-9005-0001.pdf | ||
| Alpena_Base_Access_requirements.pdf | ||
| (Revised)_SOW_TDVG182002_Construct_Asphalt_Walking_Path_South_of_River_Club_Rd_Rev....doc | DOC document | |
| W912JB-18-R-9005.pdf | ||
| Pathway_plan_with_Photo.pdf | ||
| Plan_TDVG182002_Construct_Asphalt_Walking_Path_South_of_River_Club_Rd..pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| PROJECT NUMBER | PROJECT TITLE | CONTRACT NUMBER | |||||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | TDVG182002 | Construct Asphalt Walking Path South of River club Rd. | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||||||||||
| Number of copies required | |||||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLE | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | PERFORMANCE TEST RESULTS | OPERATING MANUALS | MATERIAL SAFETY DATA SHEETS | SCHEDULE | NARRATIVE | REQUEST SUB- MISSION DATE (yyyymmdd) | DATE RECEIVED IN CONTRACT- ING | DATE TO CIVIL ENGINEER- ING | RETURN SUSPENSE DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED APPROVED | DATE CONTRACTOR NOTIFIED DIS- APPROVED | CONTRACTOR RESUB- MITTAL | FINAL APPROVAL | REMARKS |
| 1 | Project Management and Coordination - Subcontractor List | X | |||||||||||||||||||||
| 2 | Project Management and Coordination - Key Personnel Names | X | |||||||||||||||||||||
| 3 | Construction Progress Documentation - Startup Construction Schedule | X | |||||||||||||||||||||
| 4 | Construction Progress Documentation - Contractor's Construction Schedule | X | |||||||||||||||||||||
| 5 | Submittal Procedures - Submittal Schedule | X | |||||||||||||||||||||
| 6 | Quality Requirements - Contractor's Quality Control Plan | X | |||||||||||||||||||||
| 7 | Quality Requirements - Schedule of Tests and Inspections | X | |||||||||||||||||||||
| 8 | Safety & Health - Safety and Health Programs | X | |||||||||||||||||||||
| 9 | Safety & Health - Contractor's Safety Plan | X | |||||||||||||||||||||
| 10 | Construction Waste Management & Disposal - Waste Management Plan | X | |||||||||||||||||||||
| 11 | Closeout Procedures - Contractor's List of incomplete items - Substantial Completion | X | |||||||||||||||||||||
| 12 | Closeout Procedures - Certified List of incomplete items - Final Completion | X | |||||||||||||||||||||
| 13 | Provide Sealed Drawings | x | |||||||||||||||||||||
| 14 | Project Record Documents - Record drawings | X | |||||||||||||||||||||
| 15 | Project Record Documents - Misc. Record Submittals | X | |||||||||||||||||||||
| 16 | MDOT-HMA Mix Design | ||||||||||||||||||||||
| 17 | MDOT-HMA Mix Design | ||||||||||||||||||||||
| 18 | MDOT-23 Aggregate | ||||||||||||||||||||||
| 19 | MDOT-Test Results, Materials | ||||||||||||||||||||||
| 20 | MDOT-Test Results, Compaction | ||||||||||||||||||||||
| 21 | MDOT- Pavement Markings - Product Data | X | |||||||||||||||||||||
| 1 | |||||||||||||||||||||||
| 2 | |||||||||||||||||||||||
| 3 | |||||||||||||||||||||||
| 4 | |||||||||||||||||||||||
| 5 | |||||||||||||||||||||||
| 6 | |||||||||||||||||||||||
| 7 | |||||||||||||||||||||||
| 8 | |||||||||||||||||||||||
| 9 | |||||||||||||||||||||||
| 10 | |||||||||||||||||||||||
| 11 | |||||||||||||||||||||||
| 12 | |||||||||||||||||||||||
| 13 | |||||||||||||||||||||||
| 14 | |||||||||||||||||||||||
| 15 |
File details come from the government source that posted it.