Plan_TDVG182002_Construct_Asphalt_Walking_Path_South_of_River_Club_Rd..pdf
PDF 158 KB Posted
- Attached to
- Construct Asphalt Walking Path Federal contract opportunity
- Solicitation number
- W912JB-18-R-9005
About this file
Site plan
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912JB-18-R-9005_Amendment_-4.pdf | ||
| Alpena_Wage_Determination__20Jul2018.pdf | ||
| W912JB-18-P-9005-0003.pdf | ||
| RFI-002.docx | DOCX document | |
| Evaluation_Factor_Amendment_(Asphalt_Path)_-0002.docx | DOCX document | |
| W912JB-18-R-9005-0002.pdf | ||
| Site_Visit_Minutes_and_Sign_in_Sheet.pdf | ||
| RFI-001.docx | DOCX document | |
| (Amended-0001)_SOW_TDVG182002_Construct_Asphalt_Walking_Path_South_of_River_Club_Rd_Rev....doc | DOC document | |
| W912JB-18-R-9005-0001.pdf | ||
| W912JB-18-R-9005.pdf | ||
| Alpena_Base_Access_requirements.pdf | ||
| (Revised)_SOW_TDVG182002_Construct_Asphalt_Walking_Path_South_of_River_Club_Rd_Rev....doc | DOC document | |
| Pathway_plan_with_Photo.pdf | ||
| AF66_-_TDVG182002.xls | XLS spreadsheet |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
x x x x x x x x x x x x x x x x x x x
19+00
20+00
21+83.45
SHEET NO.
J O
B
N
U M
B E
R D
A T
E E
N G
I N
E E
R
A
N O
V E
M B
E R
R I V
A R
D
C O
N T
R O
L
S
E C
T I O
N
S T
L
S C
A L E
R
I V
E
C
L
U
B
O
A
D
CAMPGROUND
0 50 100 150
PROPOSED CENTERLINE
PROPOSED PAVING AREA
APPROX. TREE LINE
APPROX. FENCE LINE
x
4'1'2'
2" MDOT 36A (8' WIDE)
4" MDOT 23A AGGREGATE (10' WIDE)
TOPSOIL & SEED
GRADE (14' WIDE)
TYPICAL CROSS SECTION
NOT TO SCALE
JOGGING TRACK
1. REMOVE TREES IN PATH
2. LEVEL GRADE (14' WIDE) TO LESS THAN 2' RISE OR FALL IN 50'
3. 95% COMPACTION OF SUBGRADE REQUIRED THROUGHOUT PROJECT PATH (TYP.)
4. 4" OF GRAVEL BASE (MDOT 23A)--10' WIDE--98% COMPACTION (TYP.)
5. 2" OF MDOT 36A TOP COURSE--8' WIDE
6. 3" OF TPOSOIL AND MDOT TYPE SEEDING (SEE SPECIFICATIONS) WHEREVER SOIL
WAS DISTURBED BY SITE EXCAVATION
7. PATH TO RUN ALONG TREELINE UNLESS OTHERWISE INDICATED (TYP.)
CROSSWALK
STRIPING PER MDOT
TYPICAL DRAWINGS
CROSSWALK
STRIPING PER MDOT
TYPICAL DRAWINGS
CROSSWALK
STRIPING PER MDOT
TYPICAL DRAWINGS
495' RADIUS
105' RADIUS
105' RADIUS
55' RADIUS
30' RADIUS
30' RADIUS
30' RADIUS
55' RADIUS
45' RADIUS
20' RADIUS
55' RADIUS
30' RADIUS
195' RADIUS
30' RADIUS
55' RADIUS
45' RADIUS
SCALE 1" = 50'
2T612
100 KVA
7.2KV-
120 / 240
1 ɸ 3W
| Sheets and Views |
| Model |
File details come from the government source that posted it.