Amendment_0006_Narrative.docx
DOCX document 14 KB Posted
- Attached to
- Repair Roof, Bldg 6900
- Solicitation number
- W912JB-17-B-8003
About this file
Amendment 06 Narrative
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0006.docx | DOCX document | |
| Amendment_0005.pdf | ||
| Amendment_0004_attachment.pdf | ||
| Amendment_0004.pdf | ||
| Sign_IN_Sheet.pdf | ||
| Site_Visit_MFR.docx | DOCX document | |
| PreBid_Meeting_Slides.ppt | PPT presentation | |
| Amendment_0003.pdf | ||
| Wage_Determination.pdf | ||
| Amendment_0001.docx | DOCX document | |
| Solicitation.docx | DOCX document | |
| Repair_Roof_6900_Drawings.pdf | ||
| Repair_Roof_6900_Specifications.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The purpose of this amendment is to re-establish the bid due date, and to issue an addendum to the scope of work.
1. Change the bid opening date to 30 Jan 2018, 1300 EST.
2. All questions must be submitted to the government NLT 24 Jan 2018, 1600 EST. Submit questions to jonathan.d.bodus.mil@mail.mil. Questions will be answered in the form of an amendment to the solicitation.
3. Add Addendum 01 to the solicitation drawings to remove the requirement to demolish the existing parachute tower from the project scope of work:
a. Sheet A-100 - Remove existing roof and wall construction to below existing metal decking – there is transite siding insulation underneath the metal siding – asbestos remediation will be required.
b. Sheet A-100 – the note “Remove existing metal roof panels” at the west end of “Roof Plan B” will not be removed.
c. Sheet A-101 – Detail F will not be included in the scope of work.
d. Sheet A-200 – at the west end of ‘Roof Plan B’ the requirement for “new metal roof Panels to match existing” is eliminated from the scope of work.
e. Sheet A-200 – Detail F as called out will be removed from the scope of work.
4. Add to the scope of work: Furnish and install a new roofing system on the roof of the parachute tower as depicted in Detail A on sheet A-300. The roof will be installed per the drawings and specifications.
5. All other terms and conditions shall remain the same.