Site_Visit_Lightning_protection.pdf
PDF 155 KB Posted
- Attached to
- LIGHTNING PROTECTION Federal contract opportunity
- Solicitation number
- W912JA-17-T-0032
About this file
Site Visit Minutes
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre-bid_site_visit_-_QA_1.docx | DOCX document | |
| Aircraft_Shelter_-_electrical_panel_1.JPG | JPG image | |
| Site_Visit_Roster.pdf | ||
| Electrical_Plans_-_Renovate_bldg_1201_(2015).pdf | ||
| Electrical_Plans_-_Renovate_bldg_1201_(2011).pdf | ||
| Lightning_Protection_SOW_-_Rev2.docx | DOCX document | |
| Aircraft_Shelter_-_electrical_panel_2.JPG | JPG image | |
| Electrical_Plans_-_1403.pdf | ||
| Electrical_Plans_-_Construct_Bldg_1203.pdf | ||
| 13100_-_LIGHTING_PROTECTION.doc | DOC document | |
| Lightning_Protection_SOW_-_Rev1.doc.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
HEADQUARTERS, 187TH FIGHTER WING (ANG)
MONTGOMERY, ALABAMA 36108-4824
16 March 2017
MEMORANDUM FOR RECORD
SUBJECT: MINUTES OF PRE-BID CONFERENCE AND SITE VISIT, W912JA-17-T-0032
DATE: 16 March 2017
1. The following Government personnel attended the site visit:
Name Position
William Sanford, Capt Civil Engineering
Mark Pigg Civil Engineering
Michael Surles, CMSgt Air Field Manager
April Mcleroy, SMSgt Air Field Manager
Matt Jock, TSgt Air Field Manager
Jason D’Elia Security Forces
Stephen Shanks, MSgt Contracting
Please see attendance rooster for a list of contractors who attended the site visit.
2. The meeting was held at 0930 at Building 1801, 187th Fighter Wing (FW), Montgomery, Alabama. Major points that where discussed: Scope of Contract, Contract Type (Firm Fixed
Price), Period of Performance, and Date for turning in proposals
3. The meeting was then turned over to Capt Sanford who gave a brief overview of the requirements. Chief Surles then gave a short brief on the requirements for access to the flightline and the request that advance notification be given to allow him time to coordinate aircraft movements. Question was asked how much advanced notice and he answered one (1) day. In discussions with Capt. Sanford it was decided that instead of 30 days for the period of performance that it would be more appropriate to amend the solicitation to “work must be completed no later than 12 May 2017”, with later clarification that the included all certifications complete and provided to the 187th FW.
4. The site visit was began with inspections (in order) of buildings 1203, 1201, Aircraft Shelters and building 1403. Numerous observation, questions and requests were presented during the site visit. The questions shall be answered in a separate document and posted to www.FBO.gov when they are answered. The following are the noted observations and requests.
a. Building 1203 and 1201 have surge protectors, Statement of Work shall have to be amended. Outstanding question is whether there certifications are current.
b. Can copies of the certifications be provided? Civil Engineering shall provide copies.
http://www.fbo.gov/
c. Can single line electrical drawings be provided for all building? Civil Engineering shall provide copies.
d. Solicitation and Statement of Work shall be amended to address changes to scope and date of the period of performance.
5. Reminder, all questions should be sent to the 187th FW Contracting Office by 22 March 2017 to allow time for answers. Primary point of is MSgt. Stephen A. Shanks
Stephen.a.shanks2.mil@mail.mil.
STEPHEN A. SHANKS, MSgt, AL ANG
Contract Specialist mailto:Stephen.a.shanks2.mil@mail.mil
| 2017-03-21T13:40:46-0500 | |
| SHANKS.STEPHEN.AUSTIN.1151924979 |