Pre-Bid_Confrence_&_Site_Vist_Questions_and_Answers.pdf
PDF 61 KB Posted
- Attached to
- Building 1062 Re-Roof
- Solicitation number
- W912J3-18-B-5001
About this file
Pre-Bid Conference and Site Visit Questions and Answers Have Been Posted
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site Visit Questions and Answers Document W912J3‐18‐B‐5001
17 August 2018
Q1. Are there existing drawing with detailed information about what is under the current roof?
A1. Yes, refer to drawings.
Q2. Will there be an area to park equipment during the performance of work?
A2. Yes, we will provide a bed down area that will be identified during the pre‐construction conference.
Q3. Is the roof built to slope?
A3. Contractor to match existing roof conditions. Refer to drawings.
Q4. What are conditions under the current roof?
A4. Good, Refer to drawings for detail.
Q5. Was a core sample taken? If yes what was the outcome of the sample?
A5. Yes core sample taken during Pre‐Bid site. 4” Rigid Insulation, Fiber board and two layers of roof membrane at the sample location.
Q6. What is the required R value for the new roof? Standard value?
A6. Follow ASHRAE standards for our location/zone.
Q7. Is there a metal deck under the current roof?
A7. Yes, refer to drawings for detail.
Q8. Is there any conduit under the current roof?
A8. Existing As‐Built drawings does not show any conduit running between roof membrane and metal deck.
Q9. Will the metal coping be reused?
A9. Replace existing coping. Contractor to match existing color/Style.
Site Visit Questions and Answers Document W912J3‐18‐B‐5001
17 August 2018
Q10. Does the new roof need new metal wall flashing?
A10. Yes, Replace existing flashing throughout.
‐‐ End Site Visit Questions and Answers Document ‐‐
File details come from the government source that posted it.