This technical exhibit outlines the grounds maintenance requirements for the U.S. Army Corps of Engineers Engineer Research and Development Center facilities in Vicksburg, Mississippi and surrounding areas. The contractor shall provide grass mowing, edging, trimming and other grounds services for 95 acres at the ERDC main campus and adjacent sites. Mowing levels range from a maximum grass height of 4 inches cut twice monthly to 8 inches cut quarterly. Additional requirements include flower bed maintenance with mulching done in April, June and October, pruning of shrubs and crape myrtles, herbicide application to prevent vegetation growth year-round, and leaf collection from December to February. The estimated areas for each maintenance level and site are provided. The contractor must have an office within 60 miles of Vicksburg and furnish all necessary labor, equipment and supplies to perform the specified grounds maintenance services in accordance with the specifications, technical exhibits and drawings.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT II
GROUNDS SERVICES
TECHNICAL REQUIREMENTS
ERDC 2023
| Maintenance Level |
| Period |
| Requirement |
| Frequency |
| I |
| March 1 - |
November 30
| 4 inch maximum height |
| Minimum twice per month |
| II |
| March 1 - |
November 30
| 5 inch maximum height |
| Minimum once per month |
III
March 1 - November 30
8 inch maximum height Minimum May, July, September, November
| IV |
| March 1 - |
November 30
| Cut to 4 inches Semiannually |
| Cut in May and October |
| V |
| When Directed |
| Cut to Directed Height |
| When Directed |
Flower Bed Maintenance and Pruning of Shrubs
| Minimum 3 inches of Mulch in Flower beds, see section 5.7 |
| April, June, October |
(Crape Myrtle pruning in in March)
Herbicide
| No Vegetative growth, See Paragraph 5.8 |
| 12 months per year |
Leaf collection
| See Paragraph 5.10 |
| December – February |
Where Directed
Estimated Quantities:
Level I – 95 acres ERDC Level II – 56 acres ERDC, 53 acres Big Black Test Site Level III – 78 acres ERDC, 15 acres Flowers Site Level IV – 17 acres ERDC Level V – 95 acres ERDC
Herbicide - 29,621 square yards
Flower Beds- 8,126.32 square yards
| Building | SqYd |
| 6000 AREA | 637.22 |
| 3270 AREA | 1,533 |
| 3200 AREA | 1,446.60 |
| 8000 AREA | 1,350.50 |
| 1000 AREA | 2,721 |
| 3294 AREA | 155 |
| 5008 AREA | 51 |
| 1006 AREA | 130 |
| 6015 AREA | 30 |
| 3396 AREA | 72 |
| total | 8126.3200 |
*** All quantities are approximate, and it is the contractor’s responsibility to verify all quantities before bidding.***