Attachment_B_-_Sample_Task_Order_PWS.docx

DOCX document 23 KB Posted

Attached to
Computer Facilities Management Services
Solicitation number
W912HZ-15-R-0004
Issued by

About this file

Attachment B

View the file

Other files

File Type Posted
W912HZ-15-R-0004-0006.pdf PDF
W912HZ-15-R-0004-0005.pdf PDF
W912HZ-15-R-0004_CONFORMED_COPY4.pdf PDF
rev1Attachment_A_-_Pricing_Schedule.xlsx XLSX spreadsheet
W912HZ-15-R-0004-0004.pdf PDF
W912HZ-15-R-0004-0003.pdf PDF
W912HZ-15-R-0004_CONFORMED_COPY3.pdf PDF
W912HZ-15-R-0004_CONFORMED_COPY.pdf PDF
W912HZ-15-R-0004-0002.pdf PDF
Q A_W912HZ-15-R-0004.docx DOCX document
W912HZ-15-R-0004_Solicitation_rev1.pdf PDF
Attachment_C_-_Past_Performance_Questionnaire.pdf PDF
W912HZ-15-R-0004_Solicitation.pdf PDF
Attachment_A_-_Pricing_Schedule.xlsx XLSX spreadsheet
Attachment_D_-_DD254.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAMPLE TASK ORDER 0001

1.0 Performance Requirements

1.1 Host Based Security

Task:

The contractor shall perform activities related to host-based security leveraging the Department of Defense (DoD) mandated Host-Based Security System (HBSS). Activities include the management, configuration and implementation of various HBSS modules on 2500 Research and Development Environment (RDE) servers, desktops and laptops assets; suggest modifications and improvements to current HBSS module settings; analyze HBSS status reports and provide courses of action suggestions to RDE management.

Period of Performance: 12 months

Deliverables

A001 Task Completion A002 Daily Report

1.2 Comply To Connect

Task:

The contractor shall provide a method for implementing Network Access Control to include systems connecting through the RDE network through Virtual Private Network (VPN), wireless, and wired. The contractor shall evaluate the status of systems daily and isolate any systems that fall outside of the government defined baseline until they can be brought within the defined level of compliance. Systems will be evaluated on such factors such as application and OS patch level, host-based security module implementation, antivirus definition status, and/or system inactivity.

The contractor shall provide a method for maintaining operating system and application layer vulnerability patches for approximately 2500 research and development (R&D) hosts to include Windows, UNIX/Linux, and Macintosh. The method shall include processes for testing and implementation.

Period of Performance: 12 months Deliverables:

A001 Task Completion A002 Daily Report A005 Technical Report

1.3 Virtualization Management

Task:

The contractor shall manage a virtual environment utilizing VMWare that includes up to 500 virtual servers on a shared storage backend. The contractor shall provide a method for implementing and maintaining a virtual desktop infrastructure for up to 1000 systems. The contractor shall provide a method for ensuring that the virtual infrastructure is compliant with DoD Security Technical Implementation Guides (STIG).

Period of Performance: 12 months Deliverables:

A001 Task Completion A005 Technical Report A009 Repository

1.4 Network Management

Task:

The contractor shall manage a research and development wide area network that spans four geographical locations and includes the management of eight firewalls with failover capability, approximately 20 core routers, 200 switches, and 150 wireless access points. The contractor shall operate and maintain network monitoring tools. The contractor shall provide a method for implementing and maintaining secure websites through the use of reverse proxy or other technologies.

Period of Performance: 12 months Deliverables:

A001 Task Completion A005 Technical Report

2.0 Deliverable Description

The contractor shall provide deliverables as described in subsequent task orders. Deliverables shall be specified by the government. Format and delivery schedule for deliverables shall be outlined in CDRLs and/or other means TBD. Deliverables will typically fall within the listing below and be specified in individual task orders.

Identifier
Name
Task Deliverable Description
A001
Task Completion
Task 1.1 - Services complete IAW requirements
A001
Task Completion
Task 1.2 - Services complete IAW requirements
A001
Task Completion
Task 1.3 - Services complete IAW requirements
A001
Task Completion
Task 1.4 - Services complete IAW requirements
A002
Daily Report
Task 1.1 - Status of identified rogue systems
A002
Daily Report
Task 1.2 - Status of quarantined and blocked systems
A005
Technical Report
Task 1.2 - Weekly reports of systems with critical or high vulnerabilities to include the remediation plan
A005
Technical Report
Task 1.3 - Periodic utilization reports of virtualized systems, as requested by the COR or Technical POC.
A005
Technical Report
Task 1.4 - Monthly reports demonstrating network utilization, VLAN structure, changes in access to the network, and uptime statistics
A009
Repository
Task 1.3 - Virtualized systems

Performance Requirement Summary (PRS)

Performance Requirement
Performance Standard and AQL
Method of Surveillance
Incentive /

Disincentive

PWS Task 1.1
a) STD: Accurate

AQL: 95%

b) STD: Identifies deficiencies

AQL: 95%

c) STD: Identifies corrective actions, when applicable

AQL: 95%

d) STD: Deliverables are made in accordance with schedule

AQL: 95%

e) STD: Responsive

AQL: 95%

Periodic Inspections
Performance

Rating according to Rating Criteria in Table 1.

PWS Task 1.2
a) STD: Tasks are performed accurately

AQL: 95%

b) STD: Identifies deficiencies

AQL: 95%

c) STD: Identifies corrective actions, when applicable

AQL: 95%

d) STD: Deliverables are made in accordance with schedule

AQL: 95%

e) STD: Responsive

AQL: 95%

Periodic Inspection/Customer Complaints
Performance
PWS Task 1.3
a) STD: Tasks are performed accurately

AQL: 95%

b) STD: Identifies deficiencies

AQL: 95%

c) STD: Identifies corrective actions, when applicable

AQL: 95%

d) STD: Deliverables are made in accordance with schedule

AQL: 95%

e) STD: Responsive

AQL: 95%

Periodic Inspection/Customer Complaints
Performance
PWS Task 1.4
a) STD: Tasks are performed accurately

AQL: 95%

b) STD: Identifies deficiencies

AQL: 95%

c) STD: Identifies corrective actions, when applicable

AQL: 95%

d) STD: Deliverables are made in accordance with schedule

AQL: 95%

e) STD: Responsive

AQL: 95%

Periodic Inspection/Customer Complaints
Performance

Table 1

PERFORMANCE RATINGS

Performance Rating Criteria

Excellent / Outstanding
Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly effective.
Very Good
Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective.
Good
Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory.
Marginal
Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented.
Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

File details come from the government source that posted it. Updated .