Text version

FY18RESETS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912HP18R1004 is hereby amended to correct errors issued in AMD 0001. See continuation page show ing the changes in red.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HP18R1004

X 9B. DATED (SEE ITEM 11)

29-Jun-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Aug-2018

CODE

US ARMY CORPS OF ENGINEERS, CHARLESTON

69-A HAGOOD AVENUE

CHARLESTON SC 29403

W912HP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HP18R1004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been modified:

TECHNICAL REVISION A

AL040 HVAC Reset

SPECIFICATIONS:

02 41 00 DEMOLITION

1) ADD the following Paragraph:

“1.2.3 Existing Hazardous Materials

The Hazardous Materials Assessment Report is provided in Specification Section 02 84 00 to show where hazardous material is expected to exist in the facilities. The intent of this contract is NOT to fully remove all hazardous material from the facilities. The intent is to only disturb the hazardous material as needed to perform the work in this contract, and that any hazardous material disturbed by this work is to be addressed in accordance with the Division 02 Existing Conditions specifications.

02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES

2) Paragraph 3.1 GENERAL REQUIREMENTS

DELETE the first sentence that states “Asbestos abatement work tasks shall be performed as summarized in Table 1.”

3) Paragraph 3.3.1 Removal of Mobile Objects

DELETE the sentence that states “The Government will remove Furniture and equipment from the area of work.”

And REPLACE it with “The contractor shall remove furniture and equipment from the work area as needed before work begins”.

DRAWINGS:

4) Sheet A-101, LEGEND, DELETE the second legend item and symbol “EXISTING LAY-IN ACOUSTICAL

CEILING GID SYSTEM (REINSTALLED)”.

5) Sheet A-101, DELETE GENERAL NOTE 2 that states “IN ALL SPACES THAT RECEIVE NEW CEILINGS, PROVIDE ACOUSTICAL PANELS AND GRID SYSTEM SIMILAR TO EXISTING SYSTEM”.

6) Sheet A-101, DELETE GENERAL NOTE 8 that states “NEW CEILINGS SHALL BE RE-INSTALLED TO

MATCH EXISITNG CEILING HEIGHTS” and REPLACE it with “NEW CEILINGS SHALL BE

INSTALLED TO MATCH EXISITNG CEILING HEIGHTS.”

7) Sheet A-102, LEGEND, DELETE the second legend item and symbol “EXISTING LAY-IN ACOUSTICAL

CEILING GID SYSTEM (REINSTALLED)”.

8) Sheet A-102, DELETE GENERAL NOTE 2 that states “IN ALL SPACES THAT RECEIVE NEW CEILINGS, PROVIDE ACOUSTICAL PANELS AND GRID SYSTEM SIMILAR TO EXISTING SYSTEM”.

9) Sheet A-102, DELETE GENERAL NOTE 8 that states “NEW CEILINGS SHALL BE RE-INSTALLED TO MATCH EXISITNG CEILING HEIGHTS” and REPLACE it with “NEW CEILINGS SHALL BE

INSTALLED TO MATCH EXISITNG CEILING HEIGHTS.”

10) Sheet A-103, LEGEND, DELETE the second legend item and symbol “EXISTING LAY-IN ACOUSTICAL

CEILING GID SYSTEM (REINSTALLED)”.

11) Sheet A-103, DELETE GENERAL NOTE 2 that states “IN ALL SPACES THAT RECEIVE NEW CEILINGS, PROVIDE ACOUSTICAL PANELS AND GRID SYSTEM SIMILAR TO EXISTING SYSTEM”.

12) Sheet A-103, DELETE GENERAL NOTE 8 that states “NEW CEILINGS SHALL BE RE-INSTALLED TO MATCH EXISITNG CEILING HEIGHTS” and REPLACE it with “NEW CEILINGS SHALL BE

INSTALLED TO MATCH EXISITNG CEILING HEIGHTS.”

13) Sheet M-104, DELETE the sentence in HVAC KEYED NOTE 3 that states “SEE DETAIL #3, Sheet G-005.”

14) Sheet M-105, DELETE the sentence in HVAC KEYED NOTE 6 that states “SEE DETAIL #3, Sheet G-005.”

15) Sheet M-106, DELETE the sentence in HVAC KEYED NOTE 6 that states “SEE DETAIL #3, Sheet G-005.”

16) Sheet M-702, Detail #1 VAV AIR HANDLING UNIT, on the call out for the smoke detector in the return and supply air duct, DELETE “TO FIRE ALARM PANEL” and REPLACE with “TO EXISTING FIRE ALARM

PANEL”.

FL037 HVAC Reset

SPECIFICATIONS:

17) ADD the following Paragraph:

The Hazardous Materials Assessment Report is provided in Specification Section 02 84 00 to show where hazardous material is expected to exist in the facilities. The intent of this contract is NOT to fully remove all hazardous material from the facilities. The intent is to only disturb the hazardous material as needed to perform the work in this contract, and that any hazardous material disturbed by this work is to be addressed in accordance with the Division 02 Existing Conditions specifications.

18) Paragraph 3.1 GENERAL REQUIREMENTS

DELETE the first sentence that states “Asbestos abatement work tasks shall be performed as summarized in Table

19) Paragraph 3.3.1 Removal of Mobile Objects

DELETE the sentence that states “The Government will remove Furniture and equipment from the area of work.”

And REPLACE it with “The contractor shall remove furniture and equipment from the work area as needed before work begins”.

DRAWINGS:

20) Sheets M-702, M-704 and M-706, Detail #1 VAV AIR HANDLING UNIT, on the call out for the smoke detector in the return and supply air duct, DELETE “TO FIRE ALARM PANEL” and REPLACE with “TO

EXISTING FIRE ALARM PANEL.”

FL037 Electrical Reset

21) ADD the following Paragraph:

The Hazardous Materials Assessment Report is provided in Specification Section 02 84 00 to show where hazardous material is expected to exist in the facilities. The intent of this contract is NOT to fully remove all hazardous material from the facilities. The intent is to only disturb the hazardous material as needed to perform the work in this contract, and that any hazardous material disturbed by this work is to be addressed in accordance with the Division 02 Existing Conditions specifications.

22) Paragraph 3.1 GENERAL REQUIREMENTS

DELETE the first sentence that states “Asbestos abatement work tasks shall be performed as summarized in Table

23) Paragraph 3.3.1 Removal of Mobile Objects

DELETE the sentence that states “The Government will remove Furniture and equipment from the area of work.”

And REPLACE it with “The contractor shall remove furniture and equipment from the work area as needed before work begins”.

KY043 HVAC Reset

SPECIFICATIONS:

21) ADD the following Paragraph:

The Hazardous Materials Assessment Report is provided in Specification Section 02 84 00 to show where hazardous material is expected to exist in the facilities. The intent of this contract is NOT to fully remove all hazardous material from the facilities. The intent is to only disturb the hazardous material as needed to perform the work in this contract, and that any hazardous material disturbed by this work is to be addressed in accordance with the Division 02 Existing Conditions specifications.

02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES

22) Paragraph 3.1 GENERAL REQUIREMENTS

DELETE the first sentence that states “Asbestos abatement work tasks shall be performed as summarized in Table 1.”

23) Paragraph 3.3.1 Removal of Mobile Objects

DELETE the sentence that states “The Government will remove Furniture and equipment from the area of work.”

And REPLACE it with “The contractor shall remove furniture and equipment from the work area as needed before work begins”.

KY043 PLUMBING Rest

DRAWINGS:

24) Sheets PD102, PD103 and PD104: DELETE the highlighted note above GENERAL NOTES AND LEGEND that states “CLEAN ALL ROOF DRAINS AND ROOF DRAIN PIPING. SECURE DOME STRAINERS TO

THEIR RESPECTIVE DRAIN BODIES AS REQUIRED.”

KY043 HVAC Reset

25) ADD the following Paragraph:

The Hazardous Materials Assessment Report is provided in Specification Section 02 84 00 to show where hazardous material is expected to exist in the facilities. The intent of this contract is NOT to fully remove all hazardous material from the facilities. The intent is to only disturb the hazardous material as needed to perform the work in this contract, and that any hazardous material disturbed by this work is to be addressed in accordance with the Division 02 Existing Conditions specifications.

26) Paragraph 3.1 GENERAL REQUIREMENTS

DELETE the first sentence that states “Asbestos abatement work tasks shall be performed as summarized in Table

27) Paragraph 3.3.1 Removal of Mobile Objects

DELETE the sentence that states “The Government will remove Furniture and equipment from the area of work.”

And REPLACE it with “The contractor shall remove furniture and equipment from the work area as needed before work begins.”

MS007 HVAC Reset

SPECIFICATIONS:

25) ADD the following Paragraph:

The Hazardous Materials Assessment Report is provided in Specification Section 02 84 00 to show where hazardous material is expected to exist in the facilities. The intent of this contract is NOT to fully remove all hazardous material from the facilities. The intent is to only disturb the hazardous material as needed to perform the work in this contract, and that any hazardous material disturbed by this work is to be addressed in accordance with the Division 02 Existing Conditions specifications.

26) Paragraph 3.1 GENERAL REQUIREMENTS

DELETE the first sentence that states “Asbestos abatement work tasks shall be performed as summarized in Table

27) Paragraph 3.3.1 Removal of Mobile Objects

DELETE the sentence that states “The Government will remove Furniture and equipment from the area of work.”

And REPLACE it with “The contractor shall remove furniture and equipment from the work area as needed before work begins.”

02 84 00 HAZARDOUS MATERIALS REPORT

28) DELETE Page 62 of 100 and 63 of 100 and REPLACE with attached Sheet ASBLOC.

29) DELETE Page 93 of 100 and 94 of 100 and REPLACE with attached Sheet LBPLOC.

DRAWINGS:

30) Sheet A-101, LEGEND, DELETE the second legend item and symbol “EXISTING LAY-IN ACOUSTICAL

CEILING GID SYSTEM (REINSTALLED)”.

31) Sheet A-101, DELETE GENERAL NOTE 3 that states “IN ALL SPACES THAT RECEIVE NEW CEILINGS, PROVIDE ACOUSTICAL PANELS AND GRID SYSTEM SIMILAR TO EXISTING SYSTEM”.

32) Sheet A-101, DELETE GENERAL NOTE 8 that states “NEW CEILINGS SHALL BE RE-INSTALLED TO

MATCH EXISITNG CEILING HEIGHTS” and REPLACE it with “NEW CEILINGS SHALL BE

INSTALLED TO MATCH EXISITNG CEILING HEIGHTS.”

33) Sheet A-102, LEGEND, DELETE the second legend item and symbol “EXISTING LAY-IN ACOUSTICAL

CEILING GID SYSTEM (REINSTALLED)”.

34) Sheet A-102, DELETE GENERAL NOTE 3 that states “IN ALL SPACES THAT RECEIVE NEW CEILINGS, PROVIDE ACOUSTICAL PANELS AND GRID SYSTEM SIMILAR TO EXISTING SYSTEM”.

35) Sheet A-102, DELETE GENERAL NOTE 8 that states “NEW CEILINGS SHALL BE RE-INSTALLED TO MATCH EXISITNG CEILING HEIGHTS” and REPLACE it with “NEW CEILINGS SHALL BE

INSTALLED TO MATCH EXISITNG CEILING HEIGHTS.”

36) Sheet A-103, LEGEND, DELETE the second legend item and symbol “EXISTING LAY-IN ACOUSTICAL

CEILING GID SYSTEM (REINSTALLED)”.

37) Sheet A-103, DELETE GENERAL NOTE 3 that states “IN ALL SPACES THAT RECEIVE NEW CEILINGS, PROVIDE ACOUSTICAL PANELS AND GRID SYSTEM SIMILAR TO EXISTING SYSTEM”.

38) Sheet A-103, DELETE GENERAL NOTE 8 that states “NEW CEILINGS SHALL BE RE-INSTALLED TO MATCH EXISITNG CEILING HEIGHTS” and REPLACE it with “NEW CEILINGS SHALL BE

INSTALLED TO MATCH EXISITNG CEILING HEIGHTS.”

39) Sheet A-104, LEGEND, DELETE the second legend item and symbol “EXISTING LAY-IN ACOUSTICAL

CEILING GID SYSTEM (REINSTALLED)”.

40) Sheet A-104, DELETE GENERAL NOTE 3 that states “IN ALL SPACES THAT RECEIVE NEW CEILINGS, PROVIDE ACOUSTICAL PANELS AND GRID SYSTEM SIMILAR TO EXISTING SYSTEM”.

41) Sheet A-104, DELETE GENERAL NOTE 8 that states “NEW CEILINGS SHALL BE RE-INSTALLED TO MATCH EXISITNG CEILING HEIGHTS” and REPLACE it with “NEW CEILINGS SHALL BE

INSTALLED TO MATCH EXISITNG CEILING HEIGHTS.”

42) Sheet M-702, Detail #1 VAV AIR HANDLING UNIT, on the call out for the smoke detector in the return and supply air duct, DELETE “TO FIRE ALARM PANEL” and REPLACE with “TO EXISTING FIRE ALARM

PANEL”.

NC019 HVAC Reset

43) ADD the following Paragraph:

The Hazardous Materials Assessment Report is provided in Specification Section 02 84 00 to show where hazardous material is expected to exist in the facilities. The intent of this contract is NOT to fully remove all hazardous material from the facilities. The intent is to only disturb the hazardous material as needed to perform the work in this contract, and that any hazardous material disturbed by this work is to be addressed in accordance with the Division 02 Existing Conditions specifications.

02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES

44) Paragraph 3.1 GENERAL REQUIREMENTS

DELETE the first sentence that states “Asbestos abatement work tasks shall be performed as summarized in Table

45) Paragraph 3.3.1 Removal of Mobile Objects

DELETE the sentence that states “The Government will remove Furniture and equipment from the area of work.”

And REPLACE it with “The contractor shall remove furniture and equipment from the work area as needed before work begins”.

DRAWINGS:

46.) Sheet A-102, DELETE the sentence in GENERAL NOTE 2 that states “ACTUAL INSTALLATION SHALL

MATCH EXISTING.”

NC027 HVAC Reset

SPECIFICATIONS

47) ADD the following Paragraph:

The Hazardous Materials Assessment Report is provided in Specification Section 02 84 00 to show where hazardous material is expected to exist in the facilities. The intent of this contract is NOT to fully remove all hazardous material from the facilities. The intent is to only disturb the hazardous material as needed to perform the work in this contract, and that any hazardous material disturbed by this work is to be addressed in accordance with the Division 02 Existing Conditions specifications.

02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES

48) Paragraph 3.1 GENERAL REQUIREMENTS

DELETE the first sentence that states “Asbestos abatement work tasks shall be performed as summarized in Table

49) Paragraph 3.3.1 Removal of Mobile Objects

DELETE the sentence that states “The Government will remove Furniture and equipment from the area of work.”

And REPLACE it with “The contractor shall remove furniture and equipment from the work area as needed before work begins.”

DRAWINGS:

50) Sheet A-102, DELETE the sentence in GENERAL NOTE 2 that states “ACTUAL INSTALLATION SHALL MATCH EXISTING.” And ADD the following: “NEW ACOUSTIC CEILINGS ARE TO BE 2’X2’ LAY-IN

IN LIEU OF THE 2’X4’ SYSTEM SHOWN. ALTHOUGH NOT SHOWN IN THIS PLAN, REMOVE THE

EXISITING ACOUSTIC CEILINGS IN ROOMS 128 AND 129 AND PROVIDE NEW ACOUTSIC

CEILINGS.”