About this file

W912HN-16-R-0008 AMD11

View the file

Other files

File Type Posted
16R08.pdf PDF
16R08.pdf PDF
amd10.pdf PDF
16R08.pdf PDF
amd9.pdf PDF
16R08.pdf PDF
amd8.pdf PDF
16R08.pdf PDF
amd7.pdf PDF
amd6_.pdf PDF
16R08.pdf PDF
16R08.pdf PDF
amd5.pdf PDF
16R08.pdf PDF
amd4.pdf PDF
amd3.pdf PDF
W912HN-16-R-0008.PDF PDF
Amd_0002.pdf PDF
Amd_1.doc DOC document
16R08_Ph1.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is issued to provide clarifications as indicated on page 2.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Feb-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN-16-R-0008

X 9B. DATED (SEE ITEM 11)

23-Mar-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Feb-2017

CODE

U.S. ARMY ENGINEER DISTRICT, SAVANNAH

100 WEST OGLETHORPE AVE

SAVANNAH GA 31401-3640

W912HN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HN-16-R-0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SUMMARY OF CHANGES

SECTION 00 20 00 - INSTRUCTIONS FOR PROCUREMENT

The following have been added by full text:

The following clarifications are provided as a result of Offeror inquiries for this project. The revised price proposal due date of February 8, 2017 at 2:00 p.m. EST remains unchanged.. All other terms and conditions remain the same.

Q1: LEED Certification requirement for a Silver rating is still part of the RFP. However, certifying a project under LEED 2009 is no longer available through GBCI. This changed back in Nov 1, 2016 and has moved to LEED Version 4. Since this is a new version, we are not sure how much of an impact it will have on this project. Will the D/B contractor be required to use the LEED Version 4, or will the government be able to certify the project under the LEED 2009 version, which was used when the RFP was written?

A1: The version of LEED specified in the RFP is still valid for this project. The project was registered prior to LEED 2009 expiring. As such, LEED 2009 still can be used. This has been coordinated with the USGBC. LEED registration information will be transferred to the contractor at award.

Q2: Per amendment 0010 revised section 01 10 10 Design Requirements page 43 paragraph 9.2.7 the shelving was removed (see below) from the scope of work; however, under section 01 10 12 Design After Award Section 5 page 27 it was added. Is the space saver material to be included in the scope of work, or is this a Government Furnished FFE item that we are to accommodate for in our design?

A2: The RFP requires the contractor to provide a Furniture, Fixtures & Equipment (FFE) design package as part of the design after award. RFP Section 5.0 of 01 10 12, along with Appendix D, provides design requirements for the items that are to be part of the FFE design. By Amendment 10, the high-density mobile storage system is now an FFE item and is now government furnished, government installed.

(End of Summary of Changes)