- Company Operations Facilities (COF) & Special Operations Forces (SOF) at Hunter Army Airfield, GA
- Solicitation number
- W912HN-16-R-0008
About this file
SPECS Amd 9
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP_Amd_11.pdf | ||
| 16R08.pdf | ||
| 16R08.pdf | ||
| amd10.pdf | ||
| amd9.pdf | ||
| 16R08.pdf | ||
| amd8.pdf | ||
| 16R08.pdf | ||
| amd7.pdf | ||
| amd6_.pdf | ||
| 16R08.pdf | ||
| 16R08.pdf | ||
| amd5.pdf | ||
| 16R08.pdf | ||
| amd4.pdf | ||
| amd3.pdf | ||
| W912HN-16-R-0008.PDF | ||
| Amd_0002.pdf | ||
| Amd_1.doc | DOC document | |
| 16R08_Ph1.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hunter AAF, Georgia
Solicitation Number
W912HN-16-R-0008
Two-Phase Design-Build for SOF Company Operations Facility (COF) Phase 1 of 2: Procurement and Contracting Requirements
PN 57442
March 2016
This acquisition is being offered as a Small Business Set-Aside
(SBSA).
U.S. ARMY ENGINEER DISTRICT, SAVANNAH
CORPS OF ENGINEERS
100 WEST OGLETHORPE AVENUE
SAVANNAH, GEORGIA 31401-3640
US Army Corps of Engineers Savannah District
SOF COF 16R08
Hunter AAF, GA
(Revised by Amendment 0006)
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 10 DESIGN REQUIREMENTS
01 10 12 DESIGN AFTER AWARD
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.00 37 INDOOR AIR QUALITY (IAQ) MANAGEMENT
01 74 19.00 37 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.00 37 COMMISSIONING
APPENDICES
APPENDIX A SOIL TEST BORING LOCATION PLAN
APPENDIX B SOIL TEST BORING LOGS
APPENDIX C SITE ENGINEER PERMITS AND INFORMATION
APPENDIX D EQUIPMENT AND FURNITURE REQUIREMENTS
APPENDIX E LEED CHECKLIST
APPENDIX F RECYCLING, SALVAGE, AND DISPOSAL OF MATERIALS
APPENDIX G CANOOCHEE EMC GUIDELINES
APPENDIX H SANITARY SEWER EXTENSION SUBMITTAL FORM
APPENDIX I GENERATOR COMPLIANCE CERTIFICATE EXAMPLE
*5 APPENDIX J USASOC GUIDANCE FOR INSTALLATION OF SIPRNET
APPENDIX K DATA OUTLET LAYOUT
APPENDIX L ENERGY & SUSTAINABILITY RECORD CARD
*6 APPENDIX M FT. STEWART/HUNTER AAF INSTALLATION DESIGN GUIDE
-- End of Project Table of Contents --
W912HN-16-R-0008-0009
Tw o-Phase Design-Build for labor and materials for design, demolition, and construction of a Company Operations Facility (COF) for the
Special Operations Forces (SOF) Headquarters at Hunter Army Airf ield, Georgia.
Contractual POC: Julie M. Oliver 912/652-5899 or julie.m.oliver@usace.army.mil
Technical POC: Steven A. Hill 912/652-5163 or steven.a.hill@usace.army.mil
This acquisition w ill be aw arded utilizing a Best Value Trade-Off methodology in accordance w ith FAR 15.101-1.
This acquisition is being solicited as a Small Business Set-Aside (SBSA).
The proposal of the successful Offeror shall be incorporated by reference into the aw arded contract.
IAW DFARS 236-204 Disclosure of Magnitude, the magnitude of construction is betw een $5M and $10M.
Construction Cost Limitation for Design & Construction Costs: The contract aw ard for design & construction shall not exceed $6,571,000.00 for this project. Offerors are under no obligation to approach this amount. How ever, the Government may not be able to make an aw ard if the dollar amount set for this project is exceeded.
NINA G. CROW (912)652-5131
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
23-Mar-2016
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________540 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________31 Jan 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
US ARMY CORPS OF ENGINEERS
100 WEST OGLETHORPE AVE.
SAVANNAH GA 31401-3640
W912HN
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 01 15 - List of Drawing Sheets
General Decision Number: GA170129 01/06/2017 GA129
Superseded General Decision Number: GA20160129
State: Georgia
Construction Type: Building
County: Chatham County in Georgia.
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded
(and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/06/2017
BOIL0026-001 01/01/2013
Rates Fringes
BOILERMAKER......................$ 24.91 19.69
ENGI0474-002 07/01/2013
POWER EQUIPMENT OPERATOR:
Bobcat/Skid Steer/Skid
Loader, Bulldozer, Forklift (under 15 tons), and Loader..................$ 22.72 12.30
Crane (over 10 tons) and
Forklift (15 tons and over).$ 24.55 12.30
Crane (over 120 tons).......$ 25.55 12.30
Crane (over 250 tons).......$ 26.55 12.30
Oiler.......................$ 20.38 12.30
* PLUM0188-001 08/01/2016
PIPEFITTER.......................$ 26.40 14.05
PLUMBER (Including HVAC Pipe
Installation)....................$ 26.40 14.05
SFGA0669-001 04/01/2016
SPRINKLER FITTER (Fire
Sprinklers)......................$ 27.79 16.77
SHEE0085-002 08/01/2012
SHEET METAL WORKER (Excluding
HVAC Duct and Metal Roof
Installation)....................$ 28.34 11.55
SUGA2012-036 08/11/2012
BRICKLAYER.......................$ 16.00 0.00
CARPENTER........................$ 18.50 0.35
CEMENT MASON/CONCRETE FINISHER...$ 15.90 2.66
ELECTRICIAN (Low Voltage
Wiring)..........................$ 18.00 1.67
ELECTRICIAN, Excludes Low
Voltage Wiring...................$ 19.95 5.56
GLAZIER..........................$ 16.42 2.00
IRONWORKER, REINFORCING..........$ 20.48 8.41
IRONWORKER, STRUCTURAL...........$ 21.00 0.00
LABORER: Common or General......$ 11.81 1.15
LABORER: Mason Tender - Brick...$ 9.00 0.00
LABORER: Pipelayer..............$ 12.00 0.23
LABORER: Plaster Tender.........$ 11.00 0.00
OPERATOR: Backhoe/Excavator.....$ 12.00 0.46
OPERATOR: Grader/Blade..........$ 17.52 0.00
PAINTER: Brush, Roller and
Spray............................$ 16.00 1.62
PLASTERER........................$ 16.00 0.00
ROOFER, Excludes Installation of Metal Roofs...................$ 11.38 0.00
SHEET METAL WORKER (HVAC Duct
Installation Only)...............$ 16.88 2.53
SHEET METAL WORKER (Metal
Roofs Installation)..............$ 15.56 0.00
TILE FINISHER....................$ 10.31 0.00
TILE SETTER......................$ 14.00 0.54
TRUCK DRIVER: Dump Truck........$ 13.61 0.00
TRUCK DRIVER: Lowboy Truck......$ 17.41 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or
"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Base Bid - Design of Company Operations Facility (COF) for the Special
Operation Forces (SOF), Hunter Army Airfield, GA, PN 57442, Complete.
FOB: Destination
NET AMT
0002 1 Job Base Bid - Site Development to include Utilities, Gravel Parking, Walks, Curbs, and Gutters, Complete.
0003 1 Job Base Bid - Construction of Company Operations Facility (COF) for the Special
Operations Forces (SOF, Hunter Army Airfield, GA, PN57442, Complete.
0004 1 Job Base Bid - Construction of Service Yard and Access Drive (Gravel), Complete.
0005 1 Job OPTION Option 1 - Construction of Overhead Protection at Company Operations Facility for Special Operation Forces, Hunter Army Airfield, GA, PN57442, Complete.
0006 1 Job OPTION Option 2 - Paved Area for Site Development, Complete.
0007 1 Job OPTION Option 3 - Paved Service Yard and Access Drive, Complete.
0008 1 Job Contractor Manpower Reporting (CMR) -CMR is a one-time charge, and there should be no direct charge for recurring reporting. The Contractor is referred to the CMR website for further instructions: https://cmra/army/mil. This may be a charge covered in overhead, and therefore not separately priced, in which case you may enter "NSP"
Note: ONLY those Offerors selected to participate in Phase II will complete and return
Section 00 10 00 – Solicitation, Contract Line Item Number (CLIN) Schedule.
Section 00 20 00 - Instructions for Procurement
Additional Notes to Offerors
1. Technical inquiries are to be submitted via Bidder Inquiry in ProjNet at:
www.projnet.org\projnet Bidder Inquiry Key: CVNHT7-EZ9BZZ All questions regarding this solicitation must be submitted in writing through ProjNet no later than 10 calendar days prior to the date established for receipt of proposals as shown in this solicitation. The Government reserves the right to not respond to questions/inquiries received after this date. To submit and review bid inquiry items, offerors will need to be a current registered user or self-register in the system. To self-register, go to the web page, click bid tab, select bidder inquiry, select agency USACE, enter the key for this solicitation below, and your email address, then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue. Offerors will receive an acknowledgement of their question(s) via email, followed by an answer to their question after it has been processed by our technical team.
2. If an Offeror believes the requirements in this solicitation contain an error, omission, or are otherwise unsound, the Offeror shall immediately notify the Contracting Officer in writing, to include supporting rationale. Such communication may be submitted to the Contracting Officer through the contracting POC identified in this solicitation.
3. In accordance with FAR Clause 52.237-2, Site Visit (Construction) of this solicitation, a formal site visit will be held. Specific information will be furnished with the Phase II solicitation. Prior to the submission of any proposals, all Offerors are required to visit the project site location to become familiar with the project requirements. A proposal will not be rejected only because the offeror fails to visit the project site. Failure to visit the project site will not relieve the Offeror from responsibility for performance of the work and compliance with the terms and conditions of any resultant contract. In no event will a failure to inspect the site constitute grounds for a claim after award of the contract.
4. Submission of Bid Bond: Note that only those Offerors selected to participate in
Phase II are required to submit a bid bond.
5. Supplemental Price Breakdown for Phase II. If deemed necessary to evaluate the price proposals in response to Phase II, the Government will request a price breakdown of the Contract Line items. The Government will provide details on where and how to send the breakdown. This information will not be needed sooner than three working days after the proposal submission due date. This information is not an opportunity for a firm to revise its non-price or price proposal. Price will not be rated or scored, but will be evaluated for fairness and reasonableness through the use of a price analysis.
Firms are cautioned to distribute direct costs, such as material, labor equipment, subcontracts, etc., and to evenly distribute indirect costs, such as job overhead, home http://www.projnet.org/projnet office overhead, bond, etc., to the appropriate contract line items. Both parties shall presume that field overhead costs through the proposed contract duration are inclusive in the offered price for the contract. If deemed necessary, the supplemental price breakdown information will be used to assist the Government in performing the price evaluations described above.
6. Each Offeror must comply with the Anti-Terrorism and Operations Security (AT/OPSEC) requirements provided below. Note that increased security at military installations may require vehicle and personnel registration, as well as 100% ID checks and random vehicle searches.
a. AT Level I Training. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the Contracting Officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html or it can be provided by the RA ATO in presentation form which will be documented via memorandum. (Item 1)
b. Suspicious Activity Reporting Training. (e.g. IWatch, Corps Watch, or See
Something, Say Something). The contractor and all associated subcontractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training. (Item 4)
7. Quality Control System: Any contract award resulting from this solicitation will require the mandatory use of the automated Quality Control System.
8. General Decision Number GA160129 02/26/2016 GA129 applies to this solicitation and subsequent contract (also see Section 00 01 15). Offerors are reminded that that wage determinations are subject to change prior to award. All proposed pricing shall include the most current wage rates. All Offerors are encouraged to review wage rates established by the Department of Labor prior to submitting proposals at http://www.wdol.gov/dba.aspx. Added by Amendment 0001.
http://jko.jten.mil/courses/atl1/launch.html http://www.wdol.gov/dba.aspx
9. Submission of Bid Bond: In accordance with FAR Clause 52.228-1 Bid Guarantee, included in this solicitation, Offerors are required to submit an original bid bond in accordance with these instructions and by the time and date established for the receipt of proposals. Bid bonds must be submitted in original form and contain original signatures. Photocopied, facsimile, scanned or otherwise mechanically reproduced bid bonds will not be accepted. Failure to submit a proper bid bond shall be cause for rejection of an Offeror’s proposal. Added by Amendment 0001.
Section 00 21 00 - Instructions
PART II SECTION V
SECTION 00 21 00 - PROPOSAL SUBMISSION REQUIREMENTS
AND INSTRUCTIONS NOTES:
A SUBMISSION IN RESPONSE TO PHASE II IS NOT REQUIRED AS PART
OF THE PHASE I PROPOSAL. A PHASE II PROPOSAL WILL BE
REQUESTED FROM ONLY THE OFFERORS SELECTED BY THE
PROCURING CONTRACTING OFFICER TO SUBMIT PROPOSALS FOR
PHASE II.
THE PHASE II SUBMISSION AND EVALUATION CRITERIA MAY BE
SUBJECT TO CHANGE PRIOR TO THE PHASE II SOLICITATION BEING
ISSUED.
1. OVERVIEW.
1.1 This solicitation is for a firm fixed price (FFP) contract using a Two-Phase Selection Process for the FY15 SOF Company Operations Facility (COF) PN57442 at Hunter Army Airfield, Georgia.
1.2 The purpose of the Source Selection plan is to establish a uniform evaluation procedure for the technical evaluation of proposals by the SSEB and the development of the Best Value Decision by the PCO/SSA using the Trade-Off Process IAW FAR 15.101-1. Inasmuch as the proposal shall describe the capability of the Offeror to perform the resulting contract, the proposal should be specific and complete in every detail as well as be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract.
1.3 For the purposes of this solicitation, the Government will utilize the Two- Phase Design-Build process IAW FAR 36.3 for this project. In Phase I, interested Offerors will submit certain specified performance capability proposals for review and consideration by the Government.
1.4 In Phase I, the Government will evaluate the performance capability proposals in accordance with the criteria described herein and will select up to five (5) of the most highly qualified Offerors to participate in Phase II. In Phase II of this process, the Government will evaluate both technical capability and price.
The technical and price proposals of the selected contractors will be reviewed by the Government. The technical information in the Phase II proposal will be reviewed and evaluated by the Government in accordance with the evaluation criteria set forth in this section. The final evaluation ratings used for comparison, selection, and award will reflect both the ratings received in Phase I and the evaluation ratings received in Phase II.
1.5 Only those Offeror’s who receive a written notification from the Savannah District PCO that the firm has been selected to participate in Phase II of this solicitation are invited to submit a Phase II proposal. Only those Offerors selected for Phase II will be provided the technical requirements package.
1.6 Phase I and II Factors:
Phase I:
FACTOR 1 - Relevant Specialized Experience FACTOR 2 - Past Performance.
PHASE II:
FACTOR 3 - This factor will evaluate the offeror’s proposed schedule to complete the project within 540 days of Notice to Proceed.
2. GENERAL INSTRUCTIONS
Firms formally organized as design-build entities, design firms and construction contractors that have associated specifically for performance of this contract, consortia of firms, or any other interested parties may submit proposals. A design firm or construction contractor may offer more than one proposal by entering into more than one association. Associations may be joint ventures or include key team subcontractors. Any legally organized Offeror may submit a proposal.
Contractor Team Arrangements. Contractor Team Arrangements are considered an arrangement in which (1) two or more companies form a partnership or joint venture to act as a potential prime contractor; or (2) a potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program. In accordance with FAR Subpart 9.6, the Government will recognize the integrity and validity of contractor team arrangements; provided, the arrangements are identified and company relationships are fully disclosed in the offer. The Offeror shall identify the major or critical aspects of the requirement to be performed by those identified in the Contractor Team Arrangement. The submission must contain a narrative that clearly explains the relevance to a particular factor of information concerning a company that is part of a Contractor Team Arrangement. The Government will consider the adequacy of this explanation in deciding the relevance of the information to this procurement. Any narrative provided should be incorporated into the Offeror’s proposal at Tab D.
2.1 Notwithstanding the specific requirements of any other area of the solicitation, information submitted about any company other than the Offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractors that will perform major or critical aspects of this requirement, or other associated business, WILL NOT be evaluated for any factor unless the proposal contains a detailed narrative explaining why this submitted information is relevant to this acquisition. The Government will consider the adequacy of this explanation in deciding the relevance and weight, if any, of the information to this procurement. Where information about a subcontractor is properly submitted and given significant weight during the evaluation, the failure of the Offeror to actually perform with that subcontractor may be grounds for termination for default. Any narrative provided should be incorporated into the Offeror’s proposal at Tab D.
2.2 Offerors shall submit their proposal to the address shown in Paragraph 3.1 below.
2.3 Proposals are due no later than the time and date specified in Paragraph 3.1 below.
2.4 Other General Review:
Debarred List: Offerors will be checked against the List of Parties Excluded from Federal Procurement and Nonprocurement Programs. Any Offeror who is listed will be eliminated without further consideration.
Minor Informalities: Proposals will be checked for minor informalities or irregularities.
The Source Selection Authority/PCO will follow guidance at FAR 14.405 when resolving minor informalities or irregularities. The PCO/SSA either will give the Offeror an opportunity to cure any defect resulting from a minor informality or irregularity or waive the defect, whichever is to the advantage of the Government.
3. PROPOSALS:
ELECTRONIC PROPOSAL SUBMISSION IS REQUIRED THROUGH THE
WEBSITE LISTED BELOW. ELECTRONIC SUBMISSION SENT VIA EMAIL OR
FACSIMILE WILL NOT BE ACCEPTED. HAND CARRIED PROPOSAL
SUBMISSION IS NOT AUTHORIZED.
3.1 DIRECTIONS FOR SUBMITTING PROPOSALS
In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically. All submissions shall be in Adobe PDF format.
Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
Title the file(s) in the following format:
W912HN-16-R-0008_COMPANY NAME_
VOLUME I W912HN-16-R-0008_COMPANY
NAME_ VOLUME II
Submit proposals electronically via the AMRDEC SAFE website at:
https://safe.amrdec.army.mil/SAFE/Welcome.aspx. At the AMRDEC SAFE website select the link: I do not have a CAC or this machine is not configured to read my CAC and I would like to access SAFE as a Guest User, to register, access the site and submit your proposal(s). [Note: It has been reported that documents are more quickly uploaded into the AMRDEC SAFE website when using a Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Offerors will have more success utilizing any particular browser. When your proposal is submitted via the AMRDEC SAFE website, the website will provide notification of the submittal to the Government recipients. When completing the information for transmittal at the AMRDEC SAFE website, you will be required to enter e-mail addresses for the recipients. For this solicitation, the recipients will be the PCO and Contract Specialist. The Contract Specialist for this project is Ms.
Julie M. Oliver, whose e-mail address is Julie.M.Oliver@usace.army.mil. The PCO for this project is Ms. Nina Crow, whose e- mail address is Nina.G.Crow@usace.army.mil. These e-mail addresses are the ones you will enter as recipients.
In addition, after uploading your documents, you will be required to verify your email address before AMRDEC will send notification to the Government recipients. This is a very important step – even if you successfully upload your proposal to AMRDEC SAFE, notification will not be sent to the Government until you verify your email address, which may result in the rejection of your proposal for lateness. Follow the instructions on the AMRDEC website and the confirmation emails you receive from
AMRDEC.
Phase I Proposal Due Date and Time:
Request For Proposal No: W912HN-16-R-0008 Due Date of Proposal: 26 Apr 2016 Time by which Proposals are Due: 2:00 P.M. (Eastern Time) Title of Project: FY15 SOF COF PN57442 HAAF
The date and time of delivery will be established by the time of receipt of the e-mail notification to the Contract Specialist and PCO by the AMRDEC SAFE website, not by the date and time of uploading of the proposal into the AMRDEC SAFE website.
Do not assume that electronic communication is instantaneous – in fact, it can take several minutes or even hours in some cases. Please make allowances for delays in transmittal. If an electronic submission is uploaded minutes before the deadline but notification is not actually received in the recipients’ e-mail inboxes until after the mailto:Julie.M.Oliver@usace.army.mil mailto:Nina.G.Crow@usace.army.mil deadline, the submission will be considered late.
3.2 DIRECTIONS FOR SUBMITTING BID BOND: In accordance with FAR Clause 52.228-1, Bid Guarantee in the solicitation, Offerors are required to submit an original bid bond in accordance with these instructions and by the time and date established for the receipt of proposals. The Bid Guarantee shall be 20% of the bid price or $3 Million, whichever is less. Bid bonds must be submitted in original form and contain original signatures. Photocopied, facsimile, scanned or otherwise mechanically reproduced bid bonds will not be accepted. Failure to submit a proper bid bond shall be cause for rejection of an Offeror’s proposal. Bid Bonds must be delivered by U.S.
Mail, including U.S. Express Mail, Federal Express or United Parcel Service. All Bid Bonds must be clearly identified with the contractor’s name and address. To ensure timely and proper handling, the lower left corner of the outermost wrapper should indicate the following:
Request For Proposal No: W912HN-16-R- 0008 Due Date of Proposal: 22 Aug 2016 Time by which Proposals are Due: 2:00 P.M. (Eastern Time) Title of Project: FY15 SOF COF PN57442 HAAF
Bid Bonds must be addressed to:
U.S, Army Engineer District, Savannah ATTN: CECT-SAS-E (Julie M. Oliver) 100 West Oglethorpe Avenue Savannah, Georgia 31401-3640
The date and time of delivery established by commercial carriers is not the official time of receipt by the Government. Security Guards posted at the loading dock entry for the building do not receive bid bonds and will contact Mailroom personnel.
Once Mailroom Personnel are available, the bid bonds will be processed by the Security Guards using established security procedures and subsequently picked up by Mailroom personnel. After receipt by the Mailroom personnel, a record will be made of the receipt of the bid bonds. Completion of these actions will constitute delivery of the bid bonds by the date and time designated for receipt.
Offerors that use U.S. Mail or U.S. Express Mail must allow sufficient time for the bid bonds to be received by Mailroom personnel by the time specified. Offerors are responsible for allowing sufficient time for the bid bonds to be processed for receipt and are cautioned that sufficient time may be as much as 24 hours prior to the date and time designated. The Government will not be responsible for bid bonds delivered to any location or to anyone other than those designated. Offerors are responsible for ensuring that bid bonds are submitted so as to reach the office designated for receipt. Offerors are responsible for allowing sufficient time for the bid bonds to be physically received and processed by Mailroom personnel in accordance with the information provided.
The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.
NOTE: A BID BOND IS NOT REQUIRED IN PHASE I. ONLY OFFERORS
SELECTED TO PARTICIPATE IN PHASE II WILL BE REQUIRED TO SUBMIT A
BID BOND.
GENERAL PROPOSAL FORMAT:
3.3 Title Page. Include the title of the Solicitation, solicitation number, Offeror name, and date of the submittal.
3.4 Table of Contents. Each volume of the proposal shall contain a detailed table of contents. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.
3.5 Electronic Matter Submissions. Written material shall be on 8 ½ x 11 size pages in no less than a 10 pitch or 10 font. Page limitations, where specified in the SOLICITATION, shall be considered a maximum. Pages in excess of any specified limitation shall not be evaluated.
3.6. Number of Copies. Offerors SHALL submit an electronic version (PDF Format) of the original Volume I and Volume II. Offerors SHALL submit only two files in PDF format (i.e. Volume I and Volume II). These two files should be named in a specific format: Solicitation Number, Offerors Company and the volume (e.g.
W912HN-16-R- 0008_USACE_Volume I.pdf).
3.7 Drawings. For Offerors invited to participate in Phase II, drawings submitted for the proposal may be done with any CADD software available to the Offeror.
However, the drawings design submittals will be done and submitted in the latest version of Micro station format only. Conversions from AutoCAD are discouraged because of the file incompatibility and the added work necessary for the conversion.
3.8 Tabs. See Phase II specific tabbing requirements. Phase I proposal shall be organized and tabbed as follows:
PHASE I VOLUME I
TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.
TAB B – Representations & Certifications. Offerors must complete and return applicable clauses located in Section 00 45 00 – Representations & Certifications of the solicitation. Offerors are to ensure all information in the System for Award Management (SAM) is up to date and accurate including FAR/DFAR clause fill-in information. Submit verification that your firm is registered in SAM. For Offerors interested in submitting proposals as a Service Disabled Veteran Owned Small Businesses, you are requested to submit the Department of Veteran Affairs (VA) Verification Letter verifying that your business has been approved as such and added to the verified Veteran business database at www.VetBiz.gov. The Government reserves the right to rely on other sources to confirm SDVOSB status if the Offeror has not been approved through the VA.
TAB C – Proposal Data Sheet – See Attachment 1 provided at the end of this section.
Offerors should ensure telephone number; fax number, e-mail address and DUNS number are all included. The DUNS number provided will be used to access Contractor Performance Assessment Reporting System (CPARS) data. If a separate DUNS has been created for a joint venture (J-V) it must be submitted. A DUNS number shall also be provided for each company identified in any other proposed association of firms or Contractor Team Arrangement. The Offeror should also submit its Tax ID number on the proposal data sheet.
TAB D – Teaming Agreements and Narratives, if applicable (See paragraphs 2.2 and 2.3).
PHASE I VOLUME II
TAB E – FACTOR 1 - Relevant Specialized Experience
TAB F – FACTOR 2 - Past Performance
4. PHASE I - FACTOR 1 - RELEVANT SPECIALIZED EXPERIENCE:
4.1 SUBMISSION REQUIREMENTS.
4.1.1 The prime contractor and the design firm(s) (or prime contractor if design is to be self-performed) shall each demonstrate recent, relevant experience on similar projects.
4.1.2 For construction team member: The prime contractor will use Attachment 3 at the end of this section. The prime contractor shall submit no more than five (5) projects. If more than five (5) projects are submitted, only the first five (5) will be evaluated. Offerors may identify state and local government and private contracts that are similar to the Government’s requirements. If projects were design-build, Offeror should identify them. If the Offeror is a joint venture, each firm shall provide http://www.vetbiz.gov/ information, demonstrating experience relevant to their role on this project in Tab D.
If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer. Submit projects that are currently well underway (fully designed and at least 50% construction progress completed) or construction completed within five (5) years preceding the date of this Solicitation.
4.1.3 For design team member: Submit projects that are currently fully designed within five (5) years preceding the date of this solicitation. Projects do not have to be in construction. Design firms may list prime contractors they have worked for such as government, private or commercial customers. If projects were design-build, Offeror should identify them. The Offeror shall demonstrate the capability of the design team member to perform design work as required under this contract using the Standard Form 330 (SF330). The Offeror is required to complete ALL sections of Part I and Part II of the SF330. See website for the SF330 at Attachment
4. The Government will evaluate the completed SF330.
4.1.3.1 Specialized Experience and Technical Competence. No more than five (5) total project examples may be submitted for the entire design team, even if the proposed Architect-Engineer Firm represents the combining of two or more companies. If more than five (5) projects are submitted, only the first five (5) will be evaluated. Projects shall be identified in Section F of the SF330.
4.1.3.2 Staffing and Professional Qualifications. In addition to the submission of project examples in accordance with 4.1.2, the proposed Architect-Engineer Firm will provide professional qualifications, experience similar to this procurement (see 4.1.3 and 4.1.4) and professional registration for the following disciplines in Section E of the SF330.
a. Architect (required)
b. Structural Engineer (required)
c. Mechanical (required)
d. Fire Protection Engineer (required)
e. RCDD Communications (required)
f. Acoustical Engineer (required)
4.1.4 Projects submitted under this factor will be considered similar to this procurement if they are similar in complexity, type, scope and magnitude, are at least 25,000 square feet of gross space and cost at least $5,000,000. For example, a similar project is a Company Operations Facility, Company Headquarters Building, Battalion Headquarters Building, or administration office.
4.1.5 The Offeror may provide a supplemental narrative, not to exceed five (5) pages, explaining corporate experience that is directly related to the similar features below.
4.1.5.1 Features included in the model(s) in the FTP site below. These models contain fully developed designs, including a Building Information Model (BIM), 2-D CADD files, specifications, and design analysis, and can be downloaded from the following FTP sites:
► FTP://https://mrsi.erdc.dren.mil/cos/standard-designs/
Note: This design is provided as a guide that exemplifies a technically suitable product and incorporates mandatory functional/operational requirements for a similar (although perhaps not an exact) facility to be constructed under this solicitation. In the performance of the awarded contract, it will be left to the Offeror’s discretion if, and how, it will use the sample design provided to satisfy the requirements of this solicitation. This model is not intended to modify or over-ride specific requirements of this solicitation and, under all circumstances, it will be incumbent upon the successful offeror to adhere to the site specific scope and functional/operational requirements specified within the solicitation. Neither this statement of work, nor the adapt-build model, are intended to diminish the offeror’s responsibilities under the clauses titled “Responsibility of the Contractor for Design,” “Warranty of Design,” and “Construction Role During Design.” The successful offeror shall be the designer-of- record and shall be responsible for the final design and construction product, including but not limited to, adherence to the installation architectural theme, building code compliance and suitability of the engineering systems provided. The government assumes no liability for the model design provided and, to the extent it is used by an offeror. The offeror will be responsible for all aspects of the design as designer-of-record.
4.1.5.2 Sound insulation for conference areas that meet a Noise Criteria (NC) minimum 30 rating in accordance with ASHRAE Fundamentals Handbook.
4.1.5.3 HVAC system that include flexibility in zoning to where it can address future changes in occupant densities.
4.1.5.4 Significant Information Technology (IT) operational areas.
4.1.5.5 Automated PA and Mass notification system integrated with phone system.
4.1.5.6 Experience in installing standing seam metal roofs.
4.1.5.7 Experience in constructing buildings with 40' minimum clear spans in any type of facility.
4.1.5.8 Conference and Training Areas.
4.1.5.9 ATFP design and construction experience.
ftp://https/mrsi.erdc.dren.mil/cos/standard-designs/
4.1.5.10 The Offeror should describe any previous teaming experience between current team members if not described in Attachment 2 and 3. Offeror may describe design-build experience on other type projects. The projects must be currently well underway (fully designed and at least 50% construction progress completed) or construction substantially completed within five (5) years preceding the date of this Solicitation.
Narrative should be limited to two (2) pages.
4.2 EVALUATION CRITERIA.
4.2.1 The Government will evaluate the extent of experience of the prime contractor and design firms in design, construction or design-build of projects similar to this procurement. The Government will review the construction projects provided by the Offeror for Factor 2 to evaluate the experience of the Offeror with similar projects. Projects will be evaluated for this factor only if they have been determined to be at least "Somewhat Relevant" as defined in paragraph 5.2.4. This will include the experience of team members, subject to paragraph 4.1.2 and 4.1.4 above. The Government will evaluate the relevance, quality and amount of the offeror's experience. The quantity of relevant experience demonstrated by the Offeror will affect the rating for this Factor. If the Offeror cannot demonstrate relevant experience or the offeror has no relevant experience, the offeror may receive a rating of “unacceptable.”
4.2.2 Rating Methodology for Factor 1. Factor 1 will be rated using the following adjectival descriptions.
4.2.2.1 OUTSTANDING - Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.
4.2.2.2 GOOD - Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.
4.2.2.3 ACCEPTABLE - Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
4.2.2.4 MARGINAL - Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.
4.2.2.5 UNACCEPTABLE - Proposal does not meet requirements and contains one or more deficiencies. Proposal is unawardable.
4.2.3 The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing CPARS (Contractor Performance Assessment Reporting System).