Site_Plan_2018-08-21_1.doc

DOC document 626 KB Posted

Attached to
FP STANDARDS - GATES AND FENCE
Solicitation number
W912GY18R0031
Issued by

About this file

Site Plan

View the file

Other files

File Type Posted
Site_Visit_Sign_In_Sheet.pdf PDF
Questions_and_Answers_Set_3.docx DOCX document
Questions_and_Answers_Set_2.docx DOCX document
Questions_and_Answers_Set_1.docx DOCX document
Visitor_Request_form1246R_Mar-2017.pdf PDF
Fence_Design_PD_2018-08-21_2.doc DOC document
Gate_Opener_PD_2018-08-21_3.doc DOC document
Gate_Detail_PD_2018-08-21_4.doc DOC document
W912GY18R0031-FP_GATES.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Johnstonville

Honey Lake State Wildlife Area

CONTRACTOR SHALL FIELD VERIFY ALL JOB CONDITIONS AND DIMENSIONS. VARIATIONS OR DISCREPANCIES SHALL BE REPORTED TO THE CONTRACTING OFFICERS REPRESENTATIVE (COR) IMMEDIATELY AND WORK ON THE AFFECTED AREA SHALL NOT PROCEED UNTIL DIRECTED BY THE COR.

IF CERTAIN FEATURES ARE NOT FULLY SHOWN OR CALLED FOR ON THE DRAWINGS OR SPECIFICATIONS, THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS AT JOB SITE. ANY CONDITIONS REQUIRING CONSTRUCTION DIFFERENT FROM THAT SHOWN ON THE PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE COR.

Plumas National Forest

Honey Lake

SIERRA ARMY DEPOT

Susanville Road

California Nevada Herlong

X

Pyramid Lake with new 86±lf FE6 fence and new double

MATERIALS AND PRODUCTS SPECIFIED BY NAME OR MODEL NUMBER SHALL NOT BE SUBSTITUTED WITHOUT APPROVAL OF THE COR..

70 70 fence as necessary (58'-3"±) to replace X

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK OF ALL TRADES

AND SHALL CHECK ALL DIMENSIONS AND HOLES AND OPENINGS REQUIRED IN STRUCTURAL89
MEMBERS. ALL DISCREPANCIES SHALL BE CALLED TO THE ATTENTION OF THE COR AND SHALL49

BE RESOLVED BEFORE PROCEEDING WITH THE WORK.

49 Cold Springs Valley Gate #1 - Remove existing gate and H-T N F Sparks THE CONTRACT DOCUMENTS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL MEASURES

Tahoe National Forest 4 8 16 24

13' automated gates (26' total opening).

27' 149'-6" X Humbolt- Toiyabe

Reno

NECESSARY TO PROTECT LIFE AND PROPERTY DURING CONSTRUCTION. SUCH MEASURES

SHALL INCLUDE, BUT ARE NOT LIMITED TO BRACING AND SHORING FOR LOADS DUE TO CONSTRUCTION AND MATERIALS.

THE REMOVAL, CUTTING, DRILLING, ETC. OF EXISTING WORK SHALL BE PERFORMED WITH CARE IN ORDER NOT TO JEOPARDIZE THE STRUCTURAL INTEGRITY OF THE EXISTING FEATURES. IF STRUCTURAL MEMBERS OR MECHANICAL, ELECTRICAL OR ARCHITECTURAL FEATURES NOT INDICATED FOR REMOVAL INTERFERES WITH THE NEW WORK, THE COR SHALL BE IMMEDIATELY NOTIFIED AND PRIOR APPROVAL SHALL BE OBTAINED BEFORE REMOVAL OF MEMBERS.

THE CONTRACTOR SHALL SAFELY SHORE EXISTING CONSTRUCTION WHEREVER EXISTING SUPPORTS ARE REMOVED TO ALLOW THE INSTALLATION OF THE NEW WORK.

THE CONTRACTOR SHALL PERFORM THE WORK WITH A MINIMUM OF INCONVENIENCE TO THE FACILITY AND SO AS NOT TO INTERRUPT THE DAY TO DAY WORK OPERATIONS. THE CONTRACTOR SHALL ENSURE SAFE PASSAGE OF PERSONS AROUND AREAS OF CONSTRUCTION AND SHALL CONDUCT OPERATIONS TO PREVENT DAMAGE OR HARM TO THE FACILITIES AND PERSONNEL. COORDINATE ALL OPERATIONS WITH THE COR.

CONTRACTOR SHALL PROMPTLY REPAIR DAMAGE CAUSED DURING OPERATIONS WITH SIMILAR MATERIALS AND WORKMANSHIP.

ALL REMOVED ITEMS, MATERIALS AND DEBRIS, UNLESS OTHERWISE NOTED, SHALL BE REMOVED PROMPTLY FROM THE SITE AND DISPOSED OF IN A LEGAL MANNER.

ALL PERSONNEL TO WEAR APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT (PPE) PRIOR TO AND DURING CONSTRUCTION.

CONSTRUCTION SITE TO BE PROPERLY BARRICADED FROM INCOMING VEHICULAR TRAFFIC.

CONTRACTOR SHALL UTILIZE "WET CUTTING" METHOD WHEN CUTTING OR SAWING ANY AND ALL CONCRETE OR ASPHALT MATERIAL TO MINIMIZE DUST AND SILICA EXPOSURE TO SURROUNDING BUILDINGS AND PERSONNEL.

Scale:1"=8± Miles LOCATION MAP National Forest

X

159'-2"± Gate #2 - Remove existing gate and replace with new 18±lf FE6 fence and new 5' automated gate.

GAS GAS

W W W W

Elec file_0.bin

Elec file_1.bin

Chan and lock existing gate and install 3 Jersey type barrieres Elec

GAS

GAS

GAS

GAS

GAS

Elec Elec Elec Elec Elec Elec A25 (Susanville Road)

PLEASE CONTACT THE SIERRA ARMY DEPOT BASE SAFETY DIVISION PERSONNEL AT (530) 827-5282 FOR ANY SAFETY QUESTIONS, SAFETY CONCERNS, UNSAFE CONDITIONS OR ACCIDENT REPORTING ISSUES.

06/28/2018 Conceptual Site Plan View

0 40 80 160 240

Cover Sheet Revision # Version Gate Renovation Project #100-17-04652 A25 @ Chewing Gum Rd.

Distribution Statement A: Approved for public release: distribution unlimited.

Scale:1"=80' Herlong Sierra Army Depot California file_2.png

Scale: Date: Drawn By: Sheet: 1"=80' 08/21/2018 TLW 1 Of 4 Plotted Date: