Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised-Epoxy_Broadcast_Floor_Coating_system.doc | DOC document | |
| W912GY-17-R-0017_0002.pdf | ||
| Construction_Q&A_-_Group_B.docx | DOCX document | |
| SOW_Bldg_356_.docx | DOCX document | |
| SOW_Bldg_357.docx | DOCX document | |
| SOW_Bldg_358_.docx | DOCX document | |
| SOW_Bldg_360_.docx | DOCX document | |
| Service_Entrance_Conductors_Warehouse_2017-02-16.pdf | ||
| BUILDING_356_Post_and_Truss_Repair.pdf | ||
| Epoxy_Broadcast_Floor_Coating_system.doc | DOC document | |
| Bldg_358__Lift_Tables_drawing.pdf | ||
| Bldg_356_Lighting_22Mar17.pdf | ||
| Bldg_356_Electrical_22Mar17.pdf | ||
| Construction_QA.docx | DOCX document | |
| Drawings_Bldg_357_Lift_table_location.pdf | ||
| Wall_Pipe_Bracing_over_roll-up_doors..pdf | ||
| Bldg_360_Lighting_-_2017-03-15.pdf | ||
| End-wall_brace_detail.pdf | ||
| SOW_Bldg_358_.pdf | ||
| SOW_Bldg_356_.pdf | ||
| SOW_Bldg_357.pdf | ||
| SOW_Bldg_360_.pdf | ||
| Wage_Determination_-_Construction_(SIAD).pdf | ||
| W912GY-17-R-0017.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 0001 to Solicitation W912GY-17-R-0017 is captured in the Summary of Changes page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Aug-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912GY-17-R-0017
X 9B. DATED (SEE ITEM 11)
18-Jul-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Aug-2017
CODE
SIERRA ARMY DEPOT
CONTRACTING OFFICE
74 C STREET BUILDING 60
HERLONG CA 96113
W912GY 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912GY-17-R-0017
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0001
Building 356
1. SOW 356 Section 1.3.48 removed “MDPs and subpanels shall be Square D or equivalent.”
2. SOW 356 Section 1.3.36 changed from “Install a top coating over the 10” +/- concrete strip along the building. Use Mapei Mapecem 202, this is good from 1/4” to 2” in thickness. Clean pea gravel may be added to increase thickness.” to “Install a top coating over the 10” +/- concrete strip along the building.
Coating must be good from 1/4” to 2” in thickness. Clean pea gravel may be added to increase thickness.”
3. SOW 356 Section 1.3.9 changed from “Government will supply all disposal dumpsters. Contractor will coordinate dumpster delivery and removal with the government.” to “Government will supply all disposal dumpsters for recyclables and asbestos only. Contractor will coordinate dumpster delivery and removal with the government.”
4. SOW 356 Section 1.3.55 changed to Reserved.
5. SOW 356 Section 1.3.44 changed from “Install engineered bracing on North and South ends of building.
Shear sheathing shall be place horizontally (when more than 8’ tall) with 2’ min. staggered butt joints.” to
“Install engineered bracing on South end of building. Shear sheathing shall be place horizontally (when more than 8’ tall) with 2’ min. staggered butt joints.”
Building 357
6. SOW 357 Section 1.3.9 changed from “Government will supply all disposal dumpsters. Contractor will coordinate dumpster delivery and removal with the government.” to “Government will supply all disposal dumpsters for recyclables and asbestos only. Contractor will coordinate dumpster delivery and removal
7. SOW 357 Section 1.3.56 changed to Reserved.
8. SOW 357 Section 1.3.48 removed “MDPs and subpanels shall be Square D or equivalent.”
9. SOW 357 Section 1.3.36 changed from “Install a top coating over the 10” +/- concrete strip along the added to increase thickness.” to “Install a top coating over the 10” +/- concrete strip along the building.
Coating must be good from 1/4” to 2” in thickness. Clean pea gravel may be added to increase thickness.”
10. SOW 357 Section 1.3.43 changed from “Ceiling and wall insulation: Install R-21 foil faced insulation in-between roof rafters at bottom of rafters and R-19 foil faced insulation in walls. Rafters are 24” O.C.” to
Ceiling and wall insulation: Install R-21 foil faced insulation in-between roof rafters at bottom of rafters and R-11 foil faced insulation in walls. Rafters are 24” O.C.”
Building 358
11. SOW 358 Section 1.3.9 changed from “Government will supply all disposal dumpsters. Contractor will coordinate dumpster delivery and removal with the government.” to “Government will supply all disposal dumpsters for recyclables and asbestos only. Contractor will coordinate dumpster delivery and removal
12. SOW 358 Section 1.3.39 changed from “Install a top coating over the 10” +/- concrete strip along the added to increase thickness.” to “Install a top coating over the 10” +/- concrete strip along the building.
Coating must be good from 1/4” to 2” in thickness. Clean pea gravel may be added to increase thickness.”
13. SOW 358 Section 1.3.56 changed to Reserved.
14. SOW 358 Section 1.3.48 removed “MDPs and subpanels shall be Square D or equivalent.”
15. SOW 358 Section 1.3.64 removed “Contractor shall install exterior 120v, 20amp GFCI receptacles with metal boxes and metal covers. The Government will allow 8 GFCIs on 1 single pole, 20amp breaker.”
16. SOW 358 Section 1.3.64 removed “From these 480v safety switches the Contractor shall connect 3ea, Government provided lift tables. The Contractor shall provide power to the tables. The Contractor is NOT responsible for operation of the lift tables.”
Building 360
17. SOW 360 Section 1.3.9 changed from “Government will supply all disposal dumpsters. Contractor will coordinate dumpster delivery and removal with the government.” to “Government will supply all disposal dumpsters for recyclables and asbestos only. Contractor will coordinate dumpster delivery and removal
18. SOW 360 Section 1.3.13 changed from “Install TYVEK or equivalent moisture barrier to exterior of warehouse building.” to “Install commercial grade moisture barrier to exterior of warehouse building.”
19. SOW 360 Section 1.3.58 removed “MDPs and subpanels shall be Square D or equivalent.”
20. SOW 360 Section 1.3.43 changed from “Ceiling and wall insulation: Install R-21 foil faced insulation in-between roof rafters at bottom of rafters and R-19 foil faced insulation in walls. Rafters are 24” O.C.” to
Ceiling and wall insulation: Install R-21 foil faced insulation in-between roof rafters at bottom of rafters and R-11 foil faced insulation in walls. Rafters are 24” O.C.”
21. SOW 360 Section 1.3.50 changed from “Install (2) Thermo-Cycler GTC-480 or approved equal heaters (4 units total) on the east side of building 351 as shown in the Appendices” to “Install (2) Thermo-Cycler
GTC-480 or approved equal heaters (4 units total) on the east side of building 360 as shown in the
Appendices”
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 17-Aug-2017 12:00 PM to 28-Aug-2017 12:00 AM.
The performance payment bonds has changed from Yes to No.
(End of Summary of Changes)