BUILDING_356_Post_and_Truss_Repair.pdf
PDF 207 KB Posted
- Attached to
- CONSTRUCTION PROJECT - Bldg 356, 357, 358 & 360
- Solicitation number
- W912GY-17-R-0017
About this file
356 - Post, Truss, & Doors Drawing
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised-Epoxy_Broadcast_Floor_Coating_system.doc | DOC document | |
| W912GY-17-R-0017_0002.pdf | ||
| Construction_Q&A_-_Group_B.docx | DOCX document | |
| SOW_Bldg_356_.docx | DOCX document | |
| SOW_Bldg_357.docx | DOCX document | |
| SOW_Bldg_358_.docx | DOCX document | |
| SOW_Bldg_360_.docx | DOCX document | |
| W912GY-17-R-0017_0001.pdf | ||
| Service_Entrance_Conductors_Warehouse_2017-02-16.pdf | ||
| Epoxy_Broadcast_Floor_Coating_system.doc | DOC document | |
| Bldg_358__Lift_Tables_drawing.pdf | ||
| Bldg_356_Lighting_22Mar17.pdf | ||
| Bldg_356_Electrical_22Mar17.pdf | ||
| Construction_QA.docx | DOCX document | |
| Drawings_Bldg_357_Lift_table_location.pdf | ||
| Wall_Pipe_Bracing_over_roll-up_doors..pdf | ||
| Bldg_360_Lighting_-_2017-03-15.pdf | ||
| End-wall_brace_detail.pdf | ||
| SOW_Bldg_358_.pdf | ||
| SOW_Bldg_356_.pdf | ||
| SOW_Bldg_357.pdf | ||
| SOW_Bldg_360_.pdf | ||
| Wage_Determination_-_Construction_(SIAD).pdf | ||
| W912GY-17-R-0017.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scale: 1"=40'
20 40 80 120
Re vi sio n
Ve rs io n
/2
0/
17 0 Co nc ep tu al
Herlong California Scale: Date: Drawn By: Sheet:
Plotted Date:
Sierra Army Depot
DOORS
REN Siding, Floors
Project #356-17-04568 Post and Truss Repair
1"=40' 08/02/2017 HMC 1 Of 1