Scope_of_Work_Fire_Suppression_Revision.doc
DOC document 27 KB Posted
- Attached to
- Restroom Repair and Fire Suppression Federal contract opportunity
- Solicitation number
- W912GY16B0006
About this file
Fire Suppression Statement of Work Update
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF_1419_Restroom_and_Fire_Suppression_201.xls | XLS spreadsheet | |
| Question_and_Answer_Set_7.doc | DOC document | |
| Questions_and_Answers_Set_6.doc | DOC document | |
| Questions_Set_5.doc | DOC document | |
| IMG_9203.JPG | JPG image | |
| IMG_9202.JPG | JPG image | |
| IMG_9200.JPG | JPG image | |
| IMG_9198.JPG | JPG image | |
| IMG_9201.JPG | JPG image | |
| IMG_9205.JPG | JPG image | |
| IMG_9199.JPG | JPG image | |
| IMG_9204.JPG | JPG image | |
| Questions_and_Answers_Set_4_201.doc | DOC document | |
| Amendment_0001_-_Extension_of_Closing_Date.pdf | ||
| Questions_and_Answers_201_Set_3.doc | DOC document | |
| BLDG._201_1st_FLR_PLN-11x17.pdf | ||
| BLDG._201_2nd_FLR_PLN-Layout1.pdf | ||
| Site_Visit_Sign_In_Sheet.pdf | ||
| Questions_and_Answers_Set_2.doc | DOC document | |
| Question_and_Answer_Set_1_Fire_Suppression_System.doc | DOC document | |
| Drawing_-_Sheet_A-4.pdf | ||
| Drawing_-_Sheet_A-6.pdf | ||
| Drawing_-_Sheet_A-7.pdf | ||
| Solicitation_16-B-0006.pdf | ||
| ConcreteSpecifications.pdf |
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.1 Scope of Work Items: RPR Fire Suppression System
1.1.1 Remove existing Fire Sprinkler Systems. Design and Install Wet Pipe and Dry Pipe Fire Sprinkler Systems, designed for the following densities designed at a density of .30 gpm/SF over 3,000 SF (Misc. Storage of Class IV Commodities with 12’ or less storage height) per NFPA 13 and UFC 3-600-01.
· 1st & 2nd Floor Offices (UFC 3-600-01 & FM Global Data Sheet 3-26 for non-storage occupancies): .10gpm/sf over 1,500 SF (wet pipe system).
· Attic storage area (NFPA 13 for storage): .15gpm/sf over 1,500 (dry pipe system) increase remote area by 30% per NFPA 13 for dry pipe system.
· Unused attic space (UFC 3-600-01 & FM Global Data Sheet 3-26 for non-storage occupancies): .10gpm/sf over 1,500 SF (dry pipe system) increase remote area by 30% per NFPA 13 and UFC 3-600-01 for slope greater than 2/12.
1.1.2 Provide Design/Build Wet Pipe and Dry Pipe Fire Sprinkler Systems.
1.1.3 Design shall be based on a minimum available water flow of 70 psi per static, 20 psi residual and 2720 gpm flow as per flow test performed at hydrant 3-1 at Building 207 on April 27, 2011. Contractor shall field verify all locations.
1.1.4 Provide Fire Sprinkler design drawings, stamped by a Fire Protection Engineer.
1.1.5 Remove existing Fire Sprinkler systems.
1.1.6 Provide Schedule 40 black domestic piping, couplings, fittings and heads.
1.1.7 Provide backflow prevention as code required.
1.1.8 Provide four (4) each 100-gallon expansion tanks per building.
1.1.9 Provide anti-freeze protection for each system by filling systems with 38% Propylene Glycol (or anti-freeze equivalent) solution.
1.1.10 Provide water flow alarms and tamper switches on all valves.
1.1.11 Provide all wiring, conduits and fittings to tie into existing Fire Alarm Systems.
1.1.12 Provide exterior insulation on risers.
1.1.13 Program Fire Sprinkler devices to report to SIAD and local Fire Departments.
1.1.14 Provide Fire Sprinkler System as-built drawings for each building.
1.1.15 Provide five (5) year certification on each Fire Sprinkler System.
1.1.16 During construction when the Fire Sprinkler systems is out of service; SIAD shall provide a fire watch (if required) during this time.