Questions_and_Answers_201_Set_3.doc

DOC document 27 KB Posted

Attached to
Restroom Repair and Fire Suppression Federal contract opportunity
Solicitation number
W912GY16B0006
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to Restroom Repair and Fire Suppression, newest first.
File Type Posted
OF_1419_Restroom_and_Fire_Suppression_201.xls XLS spreadsheet
Question_and_Answer_Set_7.doc DOC document
Questions_and_Answers_Set_6.doc DOC document
Questions_Set_5.doc DOC document
IMG_9203.JPG JPG image
IMG_9202.JPG JPG image
IMG_9200.JPG JPG image
IMG_9198.JPG JPG image
IMG_9201.JPG JPG image
IMG_9205.JPG JPG image
IMG_9199.JPG JPG image
IMG_9204.JPG JPG image
Questions_and_Answers_Set_4_201.doc DOC document
Amendment_0001_-_Extension_of_Closing_Date.pdf PDF
BLDG._201_1st_FLR_PLN-11x17.pdf PDF
BLDG._201_2nd_FLR_PLN-Layout1.pdf PDF
Scope_of_Work_Fire_Suppression_Revision.doc DOC document
Site_Visit_Sign_In_Sheet.pdf PDF
Questions_and_Answers_Set_2.doc DOC document
Question_and_Answer_Set_1_Fire_Suppression_System.doc DOC document
Drawing_-_Sheet_A-4.pdf PDF
Drawing_-_Sheet_A-6.pdf PDF
Drawing_-_Sheet_A-7.pdf PDF
Solicitation_16-B-0006.pdf PDF
ConcreteSpecifications.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers 201 Set 3 1.Can we get a lay out ( drawing) of the building as it sits now?

ANSWER: See attached.

2.

Will they be clearing out the first or second floor so we can perform this work during regular business hours ?

ANSWER: Yes

3.

If so will they be moving desk, tables, computers , and such ?

ANSWER: Yes.

4.

Or will this work be done after hours?

ANSWER: No.

5.

Will they be removing the ceiling tiles and Tee bar so we can remove and install the new pipe ?

ANSWER: No.

6.

On the Statement of work under scope of work items items #1.3.8

Provide four (4) each 100 gallon expansion tanks per building. Can we clarify 4- per building?

ANSWER: Delete the verbiage.

7. Will the building be occupied during construction?

ANSWER: No.

8. Is it the intent to have the backflow prevention device installed at the existing riser connection? If so, we believe the riser room are will need to be enlarged to accommodate for this equipment.

ANSWER: Yes.

9. Will the sprinkler systems on each floor need to be on it's own separate control valve? This is a preferred method to isolate individual floors during future maintenance/repair work.

ANSWER: Yes.