Questions_Set_5.doc
DOC document 24 KB Posted
- Attached to
- Restroom Repair and Fire Suppression Federal contract opportunity
- Solicitation number
- W912GY16B0006
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF_1419_Restroom_and_Fire_Suppression_201.xls | XLS spreadsheet | |
| Question_and_Answer_Set_7.doc | DOC document | |
| Questions_and_Answers_Set_6.doc | DOC document | |
| IMG_9203.JPG | JPG image | |
| IMG_9202.JPG | JPG image | |
| IMG_9200.JPG | JPG image | |
| IMG_9198.JPG | JPG image | |
| IMG_9201.JPG | JPG image | |
| IMG_9205.JPG | JPG image | |
| IMG_9199.JPG | JPG image | |
| IMG_9204.JPG | JPG image | |
| Questions_and_Answers_Set_4_201.doc | DOC document | |
| Amendment_0001_-_Extension_of_Closing_Date.pdf | ||
| Questions_and_Answers_201_Set_3.doc | DOC document | |
| BLDG._201_1st_FLR_PLN-11x17.pdf | ||
| BLDG._201_2nd_FLR_PLN-Layout1.pdf | ||
| Scope_of_Work_Fire_Suppression_Revision.doc | DOC document | |
| Site_Visit_Sign_In_Sheet.pdf | ||
| Questions_and_Answers_Set_2.doc | DOC document | |
| Question_and_Answer_Set_1_Fire_Suppression_System.doc | DOC document | |
| Drawing_-_Sheet_A-4.pdf | ||
| Solicitation_16-B-0006.pdf | ||
| ConcreteSpecifications.pdf | ||
| Drawing_-_Sheet_A-6.pdf | ||
| Drawing_-_Sheet_A-7.pdf |
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions Set 5
1. What agencies are required to be involved in the testing of the new systems? (Fire Dept., base personnel, police dept., etc.)
ANSWER: Fire department, base personnel and the contractor.
2. Who is required to obtain the fire suppression testing agency?
ANSWER: The contractor will hire and independent agent.
3..1.3.24-The SOW does not indicate work being done in the janitor’s closet/room except for the utility sink being removed. A previous response to an RFI advised the floor to be replaced. Does the entire floor in the janitors closet need to be removed, or just the area impacted by the sink removal? Please provide the name and color of the existing tile if a portion is to be replaced. Or, if all of the tile is to be replaced please update the SOW accordingly, including if it should match the new tile being installed. Please clarify the type of flooring desired.
ANSWER: Yes, the janitors closets are in the restroom therefore considered a part of the restroom flooring specs.
4. 1.3.29- Please verify the rooms that should receive VCT tile and which ones should receive tile. 1.3.29 and 1.3.32 both indicate tile being installed, but does not specify which areas get what.
ANSWER: All areas will receive VCT tile as indicated on the drawings.
5. 1.3.3- Install 2 solid core birch pre-hung doors. In a previous response to an RFI, the government indicated these doors should be installed at the restroom entry. Please confirm the total amount of doors to be installed is (4)? The plans indicate one for each restroom entry.
ANSWER: yes
Please provide a picture of the existing fire suppression system where possible.
ANSWER: None are available.