Questions_Set_5.doc

DOC document 24 KB Posted

Attached to
Restroom Repair and Fire Suppression Federal contract opportunity
Solicitation number
W912GY16B0006
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to Restroom Repair and Fire Suppression, newest first.
File Type Posted
OF_1419_Restroom_and_Fire_Suppression_201.xls XLS spreadsheet
Question_and_Answer_Set_7.doc DOC document
Questions_and_Answers_Set_6.doc DOC document
IMG_9203.JPG JPG image
IMG_9202.JPG JPG image
IMG_9200.JPG JPG image
IMG_9198.JPG JPG image
IMG_9201.JPG JPG image
IMG_9205.JPG JPG image
IMG_9199.JPG JPG image
IMG_9204.JPG JPG image
Questions_and_Answers_Set_4_201.doc DOC document
Amendment_0001_-_Extension_of_Closing_Date.pdf PDF
Questions_and_Answers_201_Set_3.doc DOC document
BLDG._201_1st_FLR_PLN-11x17.pdf PDF
BLDG._201_2nd_FLR_PLN-Layout1.pdf PDF
Scope_of_Work_Fire_Suppression_Revision.doc DOC document
Site_Visit_Sign_In_Sheet.pdf PDF
Questions_and_Answers_Set_2.doc DOC document
Question_and_Answer_Set_1_Fire_Suppression_System.doc DOC document
Drawing_-_Sheet_A-4.pdf PDF
Solicitation_16-B-0006.pdf PDF
ConcreteSpecifications.pdf PDF
Drawing_-_Sheet_A-6.pdf PDF
Drawing_-_Sheet_A-7.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions Set 5

1. What agencies are required to be involved in the testing of the new systems? (Fire Dept., base personnel, police dept., etc.)

ANSWER: Fire department, base personnel and the contractor.

2. Who is required to obtain the fire suppression testing agency?

ANSWER: The contractor will hire and independent agent.

3..1.3.24-The SOW does not indicate work being done in the janitor’s closet/room except for the utility sink being removed. A previous response to an RFI advised the floor to be replaced. Does the entire floor in the janitors closet need to be removed, or just the area impacted by the sink removal? Please provide the name and color of the existing tile if a portion is to be replaced. Or, if all of the tile is to be replaced please update the SOW accordingly, including if it should match the new tile being installed. Please clarify the type of flooring desired.

ANSWER: Yes, the janitors closets are in the restroom therefore considered a part of the restroom flooring specs.

4. 1.3.29- Please verify the rooms that should receive VCT tile and which ones should receive tile. 1.3.29 and 1.3.32 both indicate tile being installed, but does not specify which areas get what.

ANSWER: All areas will receive VCT tile as indicated on the drawings.

5. 1.3.3- Install 2 solid core birch pre-hung doors. In a previous response to an RFI, the government indicated these doors should be installed at the restroom entry. Please confirm the total amount of doors to be installed is (4)? The plans indicate one for each restroom entry.

ANSWER: yes

Please provide a picture of the existing fire suppression system where possible.

ANSWER: None are available.