Questions_Set_6.doc
DOC document 24 KB Posted
- Attached to
- Construct Fence
- Solicitation number
- W912GY16B0005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OF_1419.xls | XLS spreadsheet | |
| Questions_Set_7.doc | DOC document | |
| Questions_Set_5.doc | DOC document | |
| Lot_23.png | PNG image | |
| Lot_33.png | PNG image | |
| Questions_Set_4.doc | DOC document | |
| Site_Visit_Sign_In_Sheet.pdf | ||
| 420-7_Fire.pdf | ||
| SIAD_385-1_Safety_Regulation_2012-04-26_FINAL.DOC | DOC document | |
| Questions_and_Answers_Set_3.doc | DOC document | |
| TS-33_Fence_-_2015-07-28_VER_2.pdf | ||
| Questions_and_Answers_Fence_Set_2.doc | DOC document | |
| Questions_and_Answers_Fence_Projects.doc | DOC document | |
| Plan_-_TS-33_Fence_-_2015-07-27.pdf | ||
| Drawing_TS-23_Fence_-_2015-12-02.pdf | ||
| Solicitation_16-B-0005.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions Set 6
1. We were wanting to confirm that the fence lines and gate locations for the new fence and gates will be staked by the Army/Sierra Depot at no cost to the contactor or are we to responsible for the marking of the fence and gate locations?
ANSWER: All corners will be marked by Government. Gate locations are per the drawings and shall be marked by the contractor.
2. In reading the question/ answers on list 5 I see that the ground rod quantities has changed to one at each corner. Originally it called out to have a ground rod at opposite corners, which I interpreted as meaning two
(2). Am I wrong?
ANSWER: Each corner a ground rod shall be placed.
3. On set #5 of questions and answers, the answer for question #2 dealing with the top rail says that the top rail is 1 7/8" OD, on the drawings in the Steel Post Schedule it states that the top rail is a 1.66 OD (1 5/8"), which is the standard for top rail. Can this please be clarified, is the top rail to be used on this project a 1 5/8" OD or is 1 7/8" OD. Your help in this matter would be very much appreciated.
ANSWER: Follow the drawing requirement.