A.07.14.01_RFIs.pdf

PDF 49 KB Posted

Attached to
SOLAR WALL, KAISERSLAUTERN, GERMANY
Solicitation number
W912GB-17-T-0009
Issued by

About this file

Questions & Answers

View the file

Other files

File Type Posted
A.01.13_GE72N_00230_01.pdf PDF
A.01.13_GE72N_Electrical.pdf PDF
A.07.24_W912GB17T0009_Amend_1.pdf PDF
RFQ.pdf PDF
A.01.38_SOW_ISB-17-0174(C).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI’s – Requests for Information and Responses

W912GB17T0009, SOLAR FAÇADE, ROB

QUESTION RESPONSE

Are there any construction drawings from the building? Specially tube heaters (incl. Natural Gas/exhaust air) and Electricity (connection point for ventilation system)

Please see revised SOW, provided with Amendment 01 to the RFQ.

Are there any information about the construction of the roof and the wall girders/beams? Static information required (specially for the cross connections)

Unfortunately, we have no additional information regarding static loads or construction

As seen the building is used as a temporary storage. There could be some ventilation duct below the ceiling: Is there a requirement regarding the height of the ceiling? Specially at the lower walls (south and/or north) and for the tube heaters

Ductwork shall be installed above roof wherever possible. Clearance of ceilings shall remain as is where possible. Any planned installation that reduces ceiling clearance shall be clearly indicated in the quote and if required, must be coordinated with COR/user after award.

At which times is the primary occupancy at the building?

Please see revised SOW, provided with Amendment 01 to the RFQ.

Will an extension of the due‐date be granted?

Amendment 01 to the RFQ extends the due date until Friday, 22 Sep 2017 at 1600h.