W912ES21B0010 0004 - Solicitation Amendment 0004.pdf

PDF 238 KB Posted

Attached to
Miter Gate Anchorage Replacement Lock and Dam 5A, 8, and 10 Federal contract opportunity
Solicitation number
W912ES21B0010
Issued by
Department of the Army Corps of Engineers Engineering District St Paul

About this file

This solicitation amendment modifies an invitation for bid for miter gate anchorage replacement projects at three locks and dams. The U.S. Army Corps of Engineers, St. Paul District is seeking bids to remove, fabricate, and replace six miter gate anchorages each at Lock and Dam 5A near Fountain City, Wisconsin, Lock and Dam 8 near Genoa, Wisconsin, and Lock and Dam 10 near Guttenburg, Iowa. Bids may be submitted for one, two, or all three locations. The estimated value of each individual project is between $1 million and $5 million, with a combined value over $10 million. The NAICS code is 237990. Awards will be firm fixed-price contracts. The solicitation is set aside for total small businesses. Bid submissions are due by the amended date.

View the file

Other files for this federal contract opportunity

Other files attached to Miter Gate Anchorage Replacement Lock and Dam 5A, 8, and 10, newest first.
File Type Posted
LD5A Amendment 0004 - HALFSIZE.pdf PDF
LD10 Amendment 0004 - HALFSIZE.pdf PDF
LD5A Amendment 0004 - FULLSIZE.pdf PDF
LD8 Amendment 0004 - FULLSIZE.pdf PDF
LD10 Amendment 0004 - FULLSIZE.pdf PDF
LD8 Amendment 0004 - HALFSIZE.pdf PDF
LD5A Amendment 0003 - FULLSIZE.pdf PDF
LD5A Amendment 0003 - HALFSIZE.pdf PDF
LD5A Submittal Register - Amendment 0003.pdf PDF
LD10 Amendment 0003 - FULLSIZE.pdf PDF
LD10 Submittal Register - Amendment 0003.pdf PDF
LD8 Amendment 0003 - HALFSIZE.pdf PDF
W912ES21B0010 0003 - Solicitation Amendment 0003.pdf PDF
LD8 Submittal Register - Amendment 0003.pdf PDF
35 50 56 Amendment 0003.pdf PDF
LD10 Amendment 0003 - HALFSIZE.pdf PDF
LD8 Amendment 0003 - FULLSIZE.pdf PDF
05 50 15 Amendment 0003.pdf PDF
LD5A Amendment 0002 - FULLSIZE.pdf PDF
35 50 56 Amendment 0002.pdf PDF
05 50 15 Amendment 0002.pdf PDF
LD8 Amendment 0002 - HALFSIZE.pdf PDF
LD10 Amendment 0002 - HALFSIZE.pdf PDF
09 97 02 Amendment 0002.pdf PDF
LD10 Amendment 0002 - FULLSIZE.pdf PDF
LD8 Amendment 0002 - FULLSIZE.pdf PDF
W912ES21B0010 0002 - Solicitation Amendment 0002.pdf PDF
LD5A Amendment 0002 - HALFSIZE.pdf PDF
A22 W912ES21B0010 0001 - Solicitation Amendment 0001.pdf PDF
Section 01 22 00.00 13 Measurements and Payments - Amendment 0001.pdf PDF
W912ES21B0010_Specs.pdf PDF
W912ES21B0010_LD10_Plans.pdf PDF
W912ES21B0010_LD5A_Plans.pdf PDF
W912ES21B0010_LD8_Plans.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this solicitation amendment is to make revisions to the specif ications, remove and replace plans sheets, and answ er Vendor submitted questions.

All other solicitation terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Apr-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES21B0010

X 9B. DATED (SEE ITEM 11)

16-Mar-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Apr-2021

CODE

CONTRACTING DIVISION

USACE - ST PAUL

180 FIFTH STREET EAST

SUITE 700

SAINT PAUL MN 55101-1678

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES21B0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The following have been added by full text:

AMENDMENT 0004

Specification Section 03 01 33 paragraph 1.8 which currently reads:

1.8 ANCHOR ROD FOREMAN EXPERIENCE REQUIREMENT

The anchor rod installation foreman must have experience supervising at least three similar projects in the past five years. Similar projects are defined as installing anchor rods or reinforcing steel in existing concrete or rock at least one inch in diameter and at least six feet in length. The anchor rods must be installed using a grout similar to the grout required under this contract. At least two of the previous projects must have been done during a period of below freezing temperatures (colder than 32 degrees Fahrenheit) where heating and special grout curing precautions were required.

Is hereby changed to read:

1.8 ANCHOR ROD FOREMAN EXPERIENCE REQUIREMENT

The anchor rod installation foreman must have experience supervising at least three similar projects in the past five years or one similar project that spanned at least two years. Similar projects are defined as installing anchor rods or reinforcing steel in existing concrete or rock at least one inch in diameter and at least six feet in length. The anchor rods must be installed using a grout similar to the grout required under this contract. At least one of the previous projects must have been done during a period of below freezing temperatures (colder than 32 degrees Fahrenheit) where heating and special grout curing precautions were required.

Plan Sheets S-001, SG506, SG507, SG509, and SG510 are removed and replaced for all three sites. Replacement Plan Sheets can be found in the following files:

LD5A Amendment 0004 – FULLSIZE.pdf LD5A Amendment 0004 – HALFSIZE.pdf LD8 Amendment 0004 – FULLSIZE.pdf LD8 Amendment 0004 – HALFSIZE.pdf LD10 Amendment 0004 – FULLSIZE.pdf LD10 Amendment 0004 – HALFSIZE.pdf

Vendor Questions and Answers:

Q - Reference Gov't response to question I.D. 9125641 and Addendum #2. The question asked if ASTM A709 Grade 50 with Zone 3 charpy requirements for fracture critical would be an acceptable substitution due to availability issues. This material is used on many USACE projects and has fine grain structure and fatigue properties. The answer that was provided was ASTM A709 Grade 50WF with Zone 3. The W is for weathering steel and still has availability issues. The anchorage frame and shear key paint, so the weathering steel properties does not seem to be applicable. Therefore, the question is can ASTM A709 Grade 50 Fracture Critical to the Zone 3 requirements be an acceptable substitution for the anchorage frame, shear key, and pin plate material?

A – The guide spec language has an error and the fine-grained requirement should not be included. This requirement is what was leading the Government to require the weathering (W) steel (per ASTM A709).

Amendment 0004 plan sheets remove the "W" from all notes referencing this steel.

Q – Section 25 05 11. We are unfamiliar with this specification section, in general. Can more information on this spec section be given, as to what it will be specifically used for on this project? It appears to be more in-line with scope involving a PLC or site integrations where we are hooked into the sites control systems.

A – This section is more informative than instructive. It is to alert the Contractor that there are many regulations and requirements necessary for connecting to any of the Governments control systems. This project doesn’t replace PLC but it does make reconnections.

Q – This spec section calls out surveying by a Professional Surveyor. Can you provide more details on what will be required or is expected to be professionally surveyed during this project?

A – Survey control points are provided in the plans for each of the three sites. The Government expects that the contractor will use these survey control points to establish the locations of the existing anchorage bars and associated equipment, as well as confirm that they were put back in the exact same locations (allowing for specified tolerances) at the end of the project.

Q – The anchor rod foreman's experience states that the foreman must have experience in 3 project over the past 5 years with 2 projects in blow freezing temperatures. We have a qualified foreman with experience in the installation of a large number of these types of anchors many of which were installed in below freezing temperatures, but all of these installations were on a single project which spanned multiple years. Would this type of experience be acceptable for the anchor rod foreman?

A – See revised Specification Section 03 01 33 paragraph 1.8 which is incorporated as part of solicitation amendment 0004.

Q - Will government provide minimum flow through the culvert valves to assist in flushing ice out of the lock chamber?

A - Yes, the Government will control valves to assist in flushing ice out of the lock chamber.

Q - Section 01 45 04.00 13 States the Quality Control manager "shall be a person with a minimum of 5 years’ experience in related duties on construction work." Section 03 01 33 States "The quality manager must hold a current license as a professional engineer in a U.S. state or territory with experience on at least five similar projects. Evidence of extraordinary proven experience may be considered by the Contracting Officer as sufficient to act as the Quality Manager." Are these two sections referring to two separate positions or is it the intent for the CQC System Manager to be a PE? If these are to separate positions what is the intent of the quality manager identified in section 03 01 33?

A - From our review, the bidder asking the question is referring to specification Section 03 30 00 (Cast-in-Place Concrete), Part 1.6.6.1, not specification section 03 01 33 (Anchor Rod Installation - there is no reference of a PE in this section). The CQC System Manager noted in specification section 01 45 04.00 13 is the top QC manager in the quality control organizational chart and oversees the entire project's quality control plan. The qualifications noted in this specification section apply to an individual separate from the Cast-In-Place QC manager, who is lower in the QC organizational chart and only responsible for the QC of the concrete, not the entire project. There are multiple features within the overall project that require a PE to design and/or oversee its implementation, but a PE is not required for the overall project QC.

(End of Summary of Changes)