LD8 Submittal Register - Amendment 0003.pdf

PDF 154 KB Posted

Attached to
Miter Gate Anchorage Replacement Lock and Dam 5A, 8, and 10 Federal contract opportunity
Solicitation number
W912ES21B0010
Issued by
Department of the Army Corps of Engineers Engineering District St Paul

About this file

This solicitation is for the removal, fabrication, and replacement of miter gate anchorages at three locks and dams on the Upper Mississippi River. The U.S. Army Corps of Engineers, St. Paul District is seeking bids to replace six anchorages each at Lock and Dam 5A near Fountain City, Wisconsin, Lock and Dam 8 near Genoa, Wisconsin, and Lock and Dam 10 near Guttenburg, Iowa under a single solicitation. Bids may be submitted for one, two, or all three locations. The estimated value of each location is between $1 million and $5 million, with a combined value over $10 million. The NAICS code is 237990 for other heavy and civil engineering construction. The contract will be a firm fixed-price total small business set-aside. Bids are due by the date specified in the solicitation, which can be found on the Contracting Opportunities website along with any updates. Offerors must register in the System for Award Management to do business with the Department of Defense and have an active SAM account with completed representations and certifications.

View the file

Other files for this federal contract opportunity

Other files attached to Miter Gate Anchorage Replacement Lock and Dam 5A, 8, and 10, newest first.
File Type Posted
LD5A Amendment 0004 - FULLSIZE.pdf PDF
LD8 Amendment 0004 - FULLSIZE.pdf PDF
LD5A Amendment 0004 - HALFSIZE.pdf PDF
W912ES21B0010 0004 - Solicitation Amendment 0004.pdf PDF
LD10 Amendment 0004 - FULLSIZE.pdf PDF
LD8 Amendment 0004 - HALFSIZE.pdf PDF
LD10 Amendment 0004 - HALFSIZE.pdf PDF
35 50 56 Amendment 0003.pdf PDF
LD5A Amendment 0003 - FULLSIZE.pdf PDF
LD5A Amendment 0003 - HALFSIZE.pdf PDF
LD5A Submittal Register - Amendment 0003.pdf PDF
LD10 Amendment 0003 - HALFSIZE.pdf PDF
LD8 Amendment 0003 - FULLSIZE.pdf PDF
05 50 15 Amendment 0003.pdf PDF
LD10 Amendment 0003 - FULLSIZE.pdf PDF
LD10 Submittal Register - Amendment 0003.pdf PDF
LD8 Amendment 0003 - HALFSIZE.pdf PDF
W912ES21B0010 0003 - Solicitation Amendment 0003.pdf PDF
LD10 Amendment 0002 - FULLSIZE.pdf PDF
LD8 Amendment 0002 - FULLSIZE.pdf PDF
W912ES21B0010 0002 - Solicitation Amendment 0002.pdf PDF
LD5A Amendment 0002 - FULLSIZE.pdf PDF
35 50 56 Amendment 0002.pdf PDF
05 50 15 Amendment 0002.pdf PDF
LD5A Amendment 0002 - HALFSIZE.pdf PDF
LD8 Amendment 0002 - HALFSIZE.pdf PDF
LD10 Amendment 0002 - HALFSIZE.pdf PDF
09 97 02 Amendment 0002.pdf PDF
A22 W912ES21B0010 0001 - Solicitation Amendment 0001.pdf PDF
Section 01 22 00.00 13 Measurements and Payments - Amendment 0001.pdf PDF
W912ES21B0010_Specs.pdf PDF
W912ES21B0010_LD10_Plans.pdf PDF
W912ES21B0010_LD8_Plans.pdf PDF
W912ES21B0010_LD5A_Plans.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 13 PAGES

LD8 Anchorage Replacement

01 32 01.00 13 SD-01 Preconstruction Submittals

1.2 G CORPROJECT SCHEDULER

QUALIFICATIONS

3.4.1 G CORInitial Project Schedule

SD-02 Shop Drawings

3.4.2 G CORProject Schedule Updates

01 35 26 SD-01 Preconstruction Submittals

1.6 G SOAccident Prevention Plan (APP)

1.6.2.1 GConfined Space Entry Plan

1.7 G SOActivity Hazard Analysis (AHA)

1.6.2.3 G SOCritical Lift Plan

SD-06 Test Reports

1.11Notifications and Reports

1.11.2 GAccident Reports

1.11.3LHE Inspection Reports

SD-07 Certificates

1.5.1.4Crane Operators/Riggers

1.6.2.2 GStandard Lift Plan

1.6.2.3 GCritical Lift Plan

1.6.2.4 GNaval Architecture Analysis

1.7Activity Hazard Analysis (AHA)

1.12HOT WORK PERMIT

1.11.4 GCertificate Of Compliance

01 45 04.00 13 SD-01 Preconstruction Submittals

3.2 GCONTRACTOR QUALITY

CONTROL (CQC) PLAN

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 13 PAGES

01 50 02.00 13 SD-02 Shop Drawings

1.7.3Site Plan

SD-06 Test Reports

1.7.2Formaldehyde Emission Test

Results

01 57 20.00 13 SD-01 Preconstruction Submittals

1.7 G ENVEnvironmental Protection Plan

01 71 23.05 13 SD-01 Preconstruction Submittals

3.1.3.2 G SURVConstruction Surveying Work

Plan and Schedule

1.8.1 G SURVQuality Control Plan

3.1.3.1 G SURVPreliminary Survey

1.9.1 G SURVProfessional Certification and

Work Experience

SD-11 Closeout Submittals

3.1.3.3 GSURVAs-Built Survey

1.5Geospatial Data

01 78 02.00 10 SD-11 Closeout Submittals

1.2 GAs-Built Drawings

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

1.5.2Existing Conditions

SD-06 Test Reports

3.2Excavated Concrete Surface

Inspection Report

03 01 33 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 13 PAGES

03 01 33 1.5.1 G STRAnchor Rod Installation

Demonstration Test Plan

1.5.2 G STRAnchor Rod Installation

Production (Final) Plan

1.8 GAnchor Rod Foreman Experience

Requirement

SD-02 Shop Drawings

1.5.4Materials Orders

1.5.4Materials List

SD-03 Product Data

2.1 G STRNonshrink Grout

1.5.3 G STREquipment

2.2 G STRCentralizers

SD-06 Test Reports

1.5.4 G STRMaterials Test Reports

1.4 G STRGrout Compression Test Reports

03 30 00 SD-01 Preconstruction Submittals

1.6.3.1 G MATConcrete Curing Plan

1.6.5 G MATQuality Control Plan

1.6.6Quality Control Personnel

Certifications

1.6.2.1 G MATForm Removal Schedule

3.6.2 G MATCold Weather Concreting Plan

3.1 GWork Plan

SD-02 Shop Drawings

1.6.2.1Formwork

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 13 PAGES

03 30 00 1.6.2.2 G STRReinforcing Steel

SD-03 Product Data

2.4.4Joint Sealants

2.4.3Joint Filler

2.3.1Cementitious Materials

2.4.1Concrete Curing Materials

2.3.4Admixtures

2.6.2Mechanical Reinforcing Bar

Connectors

2.2.2Waterstops

1.6.3.2 G MATPumping Concrete

2.4.2Nonshrink Grout

1.6.1.3 GEpoxy Adhesive

SD-05 Design Data

1.6.1.2 G MATConcrete Mix Design

1.6.1.1Formwork Calculations

SD-06 Test Reports

1.6.1.2 G MATConcrete Mix Design

1.6.4.1Fly Ash

1.6.4.1Pozzolan

1.6.4.2Slag Cement

1.6.4.3Aggregates

3.13.2.3 G STRCompressive Strength Tests

3.13.2.4Air Content

3.13.2.1Slump Tests

2.3.2Water

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 13 PAGES

03 30 00 SD-07 Certificates

2.6.1Reinforcing Bars

1.8 G STRWelder Qualifications

1.6.3.3VOC Content for Form Release

Agents, Curing Compounds, and

Concrete Penetrating Sealers

1.6.3.4Material Safety Data Sheets

SD-08 Manufacturer’s Instructions

2.4.4Joint Sealants

2.4.1Curing Compound

1.6.1.3Epoxy Adhesive

03 30 53.01 SD-01 Preconstruction Submittals

3.5.1 G STRWork Plan

3.1 G STREquipment

05 50 14 SD-02 Shop Drawings

1.3.1 G STRDetail Drawings

2.1.2.1.1 G STRWelding Procedures

2.2.4Welding Repair Plan

2.1.2.2Castings

SD-03 Product Data

2.1.2.1.3.1Filler Metal

2.1.6.3Lubricant

SD-06 Test Reports

2.2Tests, Inspections, and

Verifications

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 13 PAGES

05 50 14 1.3.2Welding Qualifications

2.1.2.3.1 GApplication Qualification for Steel

Studs

2.1.2.4Welding of Aluminum

2.2.3.1Weld Inspection Log

2.2.3.1Certified Welding Inspector

2.2.3.2.1Nondestructive Testing Personnel

05 50 15 SD-02 Shop Drawings

2.3 GDetail Drawings

1.5.1Materials Orders

1.5.2Materials List

2.3.5 GStructural Steel Welding Repairs

SD-06 Test Reports

2.3.3Tests, Inspections, And

Verifications

1.5.3Material Tests Reports

05 59 20 SD-01 Preconstruction Submittals

1.2.3 GWelding Procedure Specifications

(WPS)

1.2.4.1 GFracture Control Plan (FCP)

1.2.1 GWeld Tracking Log Template

1.2.2 GWeld Tracking Log

2.1.4.2 GPerformance Qualification

Records

SD-02 Shop Drawings

1.4.5 GShop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 13 PAGES

05 59 20 2.1.2 GAssembly

2.2.7 GWelding Repairs - Non-Fracture

Critical Members

2.2.7 GWelding Repairs - Fracture

Critical Members

1.5 GDelivery/Shipping Plan

1.4.6 GErection Drawings

SD-03 Product Data

2.1.3Materials Disposition Record

SD-06 Test Reports

2.2 GCertified Test Reports

1.2.2 GWeld Tracking Log

1.4Witness Points

2.1.5.2 GRepair of Mislocated or Misdrilled

Holes

2.2.4.2 GSchedule of Random Testing

2.1.5.3 GManufacturer Certified Test

Reports

2.1.5.3 GDistributor Certified Test Reports

SD-07 Certificates

1.2 GWork Plan

1.4.1 GQualification of Welders and

Welding Operators

1.4.2 GInspector Qualifications

1.4.3 GQualification of Structural Steel

Fabricator

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 13 PAGES

05 59 20 2.2.3.2.1 GNDT Inspector Certification

SD-09 Manufacturer’s Field

Reports

2.2.8 GControl Dimensions

09 97 02 SD-01 Preconstruction Submittals

1.2 GSafety, Health, and

Environmental Requirements

1.2.1 GAccident Prevention Plan

1.2.1.6 GConfined Spaces Plan

1.2.1.7 GRespiratory Protection Plan

1.2.2.1 GAirborne Sampling Plan

1.2.1 GVentilation Assessment Plan

1.2.2 GMedical Surveillance Plan

1.2.3 GEnvironmental Protection Plan

1.2.3.1Waste Manifest

1.2.3.1 GWaste Disposal Plan

1.2.3.2 GContainment Plan

1.2.3.3 GVisible Emissions Monitoring Plan

1.2.3.4 GPM-10 Monitoring Plan

SD-03 Product Data

Part 2 GManufacturer's MSDS Product

Data Sheet

SD-04 Samples

Part 2 GProduct Samples

2.1 GSpecial Paint Formulas

2.3.3 GSolvent and Thinners

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 13 PAGES

09 97 02 SD-06 Test Reports

1.2.3.4PM-10 Test Report

3.4Inspection Reports

1.2.2.2Medical Status Report

1.2.2.3Change in Medical Status Report

1.2.2.1 GAir Monitoring Test Plan

1.2.2.1Air Monitoring Test Report

SD-07 Certificates

1.4.1Certified EHS Professional

1.4.4Coating Thickness Gage

Qualification

1.4.3 GQualified Coating Applicator

3.6.1Contractors Qc Painting And

Coating Inspector

09 97 13.00 40 SD-01 Preconstruction Submittals

1.3 GSafety Plan

Part 2 GMaterial, Equipment, And Fixture

Lists

SD-03 Product Data

2.1.1 GAbrasive Blasting Material

2.1.2 GSealant Compound

2.1.3.1 GInorganic Zinc

2.1.3.1 GInhibitive Polyamide Epoxy

2.1.3.1 GInhibitive Polyamide Epoxy

2.1.3.1 GAliphatic Polyurethane

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 13 PAGES

09 97 13.00 40 1.3Manufacturer's Standard Color

Charts

3.3.1.1Inspection Forms

SD-05 Design Data

2.1.3.1 GInorganic Zinc

2.1.3.1 GInhibitive Polyamide Epoxy

2.1.3.1 GInhibitive Polyamide Epoxy

2.1.3.1 GAliphatic Polyurethane

2.1.3 GMix Design

SD-06 Test Reports

3.3.1 GInspection Reports

2.1.3 GTest Reports

SD-07 Certificates

2.1.1 GAbrasive Blasting Material

2.1.2 GSealant Compound

2.1.3.1Inhibitive Polyamide Epoxy

2.1.3.1Inhibitive Polyamide Epoxy

2.1.3.1Aliphatic Polyurethane

3.2.1 GInorganic Zinc Coating

SD-08 Manufacturer’s Instructions

2.1.3 GProtective Coatings

SD-11 Closeout Submittals

1.5 GWarranty

25 05 11 SD-01 Preconstruction Submittals

3.1.4.3 GWireless Communication

Request

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 13 PAGES

25 05 11 1.4.1 GDevice Account Lock Exception

Request

3.7 GMultiple IP Connection Device

Request

1.8.1.4 GContractor Computer

Cybersecurity Compliance

Statements

1.8.6 GContractor Temporary Network

Cybersecurity Compliance

Statements

SD-02 Shop Drawings

1.7.1 GNetwork Communication Report

1.7.3 GCybersecurity Riser Diagram

SD-06 Test Reports

3.1.4.4 GWireless Communication Test

Report

SD-11 Closeout Submittals

3.2.2.1 GDevice Audit Record Upload

Software

26 05 00.00 40 SD-03 Product Data

2.2.1 GWire and Cable

2.1.2 GCable Trays

3.2.5 GSplices and Connectors

3.3.1 GCommissioning Plan

SD-06 Test Reports

3.3.2 GContinuity Test

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 13 PAGES

26 05 00.00 40 3.3.2 GPhase-Rotation Tests

3.3.2 GInsulation Resistance Test

3.3.2 G600-Volt Wiring Test

SD-08 Manufacturer’s Instructions

3.1Manufacturer's Instructions

35 50 34 SD-01 Preconstruction Submittals

2.1.1 G STRWork Plan

2.1.1 G STRStrain Gage Catalog Cut

SD-06 Test Reports

3.4.1Monthly Data Reports

SD-11 Closeout Submittals

3.4.2Draft Instrumentation Report

3.4.3 G STRFinal Instrumentation Report

35 50 56 SD-01 Preconstruction Submittals

1.3.1 G STRWork Plan

3.12.1 G SODive Operation Plan

3.12.2 G SODiving Safe Practices Manual

3.12.4 G SODive Activity Hazard Analysis

3.12.3 G SODive Personnel List with

Qualifications

3.2.1 G STRSurvey Control Work Plan

3.2.2 G STRSurvey Control Records

3.6 G STRMiter Gate Recess Inspection

Report

1.3.1Visual Verification Of Shoring

System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 13 PAGES

35 50 56 1.3.2 GErecting Engineer

3.10.2Line Boring Plan

3.8Anchorage Bar Inspection Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .