LD8 Submittal Register - Amendment 0003.pdf
PDF 154 KB Posted
- Attached to
- Miter Gate Anchorage Replacement Lock and Dam 5A, 8, and 10 Federal contract opportunity
- Solicitation number
- W912ES21B0010
About this file
This solicitation is for the removal, fabrication, and replacement of miter gate anchorages at three locks and dams on the Upper Mississippi River. The U.S. Army Corps of Engineers, St. Paul District is seeking bids to replace six anchorages each at Lock and Dam 5A near Fountain City, Wisconsin, Lock and Dam 8 near Genoa, Wisconsin, and Lock and Dam 10 near Guttenburg, Iowa under a single solicitation. Bids may be submitted for one, two, or all three locations. The estimated value of each location is between $1 million and $5 million, with a combined value over $10 million. The NAICS code is 237990 for other heavy and civil engineering construction. The contract will be a firm fixed-price total small business set-aside. Bids are due by the date specified in the solicitation, which can be found on the Contracting Opportunities website along with any updates. Offerors must register in the System for Award Management to do business with the Department of Defense and have an active SAM account with completed representations and certifications.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 13 PAGES
LD8 Anchorage Replacement
01 32 01.00 13 SD-01 Preconstruction Submittals
1.2 G CORPROJECT SCHEDULER
QUALIFICATIONS
3.4.1 G CORInitial Project Schedule
SD-02 Shop Drawings
3.4.2 G CORProject Schedule Updates
01 35 26 SD-01 Preconstruction Submittals
1.6 G SOAccident Prevention Plan (APP)
1.6.2.1 GConfined Space Entry Plan
1.7 G SOActivity Hazard Analysis (AHA)
1.6.2.3 G SOCritical Lift Plan
SD-06 Test Reports
1.11Notifications and Reports
1.11.2 GAccident Reports
1.11.3LHE Inspection Reports
SD-07 Certificates
1.5.1.4Crane Operators/Riggers
1.6.2.2 GStandard Lift Plan
1.6.2.3 GCritical Lift Plan
1.6.2.4 GNaval Architecture Analysis
1.7Activity Hazard Analysis (AHA)
1.12HOT WORK PERMIT
1.11.4 GCertificate Of Compliance
01 45 04.00 13 SD-01 Preconstruction Submittals
3.2 GCONTRACTOR QUALITY
CONTROL (CQC) PLAN
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 13 PAGES
01 50 02.00 13 SD-02 Shop Drawings
1.7.3Site Plan
SD-06 Test Reports
1.7.2Formaldehyde Emission Test
Results
01 57 20.00 13 SD-01 Preconstruction Submittals
1.7 G ENVEnvironmental Protection Plan
01 71 23.05 13 SD-01 Preconstruction Submittals
3.1.3.2 G SURVConstruction Surveying Work
Plan and Schedule
1.8.1 G SURVQuality Control Plan
3.1.3.1 G SURVPreliminary Survey
1.9.1 G SURVProfessional Certification and
Work Experience
SD-11 Closeout Submittals
3.1.3.3 GSURVAs-Built Survey
1.5Geospatial Data
01 78 02.00 10 SD-11 Closeout Submittals
1.2 GAs-Built Drawings
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
1.5.2Existing Conditions
SD-06 Test Reports
3.2Excavated Concrete Surface
Inspection Report
03 01 33 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 13 PAGES
03 01 33 1.5.1 G STRAnchor Rod Installation
Demonstration Test Plan
1.5.2 G STRAnchor Rod Installation
Production (Final) Plan
1.8 GAnchor Rod Foreman Experience
Requirement
SD-02 Shop Drawings
1.5.4Materials Orders
1.5.4Materials List
SD-03 Product Data
2.1 G STRNonshrink Grout
1.5.3 G STREquipment
2.2 G STRCentralizers
SD-06 Test Reports
1.5.4 G STRMaterials Test Reports
1.4 G STRGrout Compression Test Reports
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1 G MATConcrete Curing Plan
1.6.5 G MATQuality Control Plan
1.6.6Quality Control Personnel
Certifications
1.6.2.1 G MATForm Removal Schedule
3.6.2 G MATCold Weather Concreting Plan
3.1 GWork Plan
SD-02 Shop Drawings
1.6.2.1Formwork
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 13 PAGES
03 30 00 1.6.2.2 G STRReinforcing Steel
SD-03 Product Data
2.4.4Joint Sealants
2.4.3Joint Filler
2.3.1Cementitious Materials
2.4.1Concrete Curing Materials
2.3.4Admixtures
2.6.2Mechanical Reinforcing Bar
Connectors
2.2.2Waterstops
1.6.3.2 G MATPumping Concrete
2.4.2Nonshrink Grout
1.6.1.3 GEpoxy Adhesive
SD-05 Design Data
1.6.1.2 G MATConcrete Mix Design
1.6.1.1Formwork Calculations
SD-06 Test Reports
1.6.1.2 G MATConcrete Mix Design
1.6.4.1Fly Ash
1.6.4.1Pozzolan
1.6.4.2Slag Cement
1.6.4.3Aggregates
3.13.2.3 G STRCompressive Strength Tests
3.13.2.4Air Content
3.13.2.1Slump Tests
2.3.2Water
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 13 PAGES
03 30 00 SD-07 Certificates
2.6.1Reinforcing Bars
1.8 G STRWelder Qualifications
1.6.3.3VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.6.3.4Material Safety Data Sheets
SD-08 Manufacturer’s Instructions
2.4.4Joint Sealants
2.4.1Curing Compound
1.6.1.3Epoxy Adhesive
03 30 53.01 SD-01 Preconstruction Submittals
3.5.1 G STRWork Plan
3.1 G STREquipment
05 50 14 SD-02 Shop Drawings
1.3.1 G STRDetail Drawings
2.1.2.1.1 G STRWelding Procedures
2.2.4Welding Repair Plan
2.1.2.2Castings
SD-03 Product Data
2.1.2.1.3.1Filler Metal
2.1.6.3Lubricant
SD-06 Test Reports
2.2Tests, Inspections, and
Verifications
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 13 PAGES
05 50 14 1.3.2Welding Qualifications
2.1.2.3.1 GApplication Qualification for Steel
Studs
2.1.2.4Welding of Aluminum
2.2.3.1Weld Inspection Log
2.2.3.1Certified Welding Inspector
2.2.3.2.1Nondestructive Testing Personnel
05 50 15 SD-02 Shop Drawings
2.3 GDetail Drawings
1.5.1Materials Orders
1.5.2Materials List
2.3.5 GStructural Steel Welding Repairs
SD-06 Test Reports
2.3.3Tests, Inspections, And
Verifications
1.5.3Material Tests Reports
05 59 20 SD-01 Preconstruction Submittals
1.2.3 GWelding Procedure Specifications
(WPS)
1.2.4.1 GFracture Control Plan (FCP)
1.2.1 GWeld Tracking Log Template
1.2.2 GWeld Tracking Log
2.1.4.2 GPerformance Qualification
Records
SD-02 Shop Drawings
1.4.5 GShop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 13 PAGES
05 59 20 2.1.2 GAssembly
2.2.7 GWelding Repairs - Non-Fracture
Critical Members
2.2.7 GWelding Repairs - Fracture
Critical Members
1.5 GDelivery/Shipping Plan
1.4.6 GErection Drawings
SD-03 Product Data
2.1.3Materials Disposition Record
SD-06 Test Reports
2.2 GCertified Test Reports
1.2.2 GWeld Tracking Log
1.4Witness Points
2.1.5.2 GRepair of Mislocated or Misdrilled
Holes
2.2.4.2 GSchedule of Random Testing
2.1.5.3 GManufacturer Certified Test
Reports
2.1.5.3 GDistributor Certified Test Reports
SD-07 Certificates
1.2 GWork Plan
1.4.1 GQualification of Welders and
Welding Operators
1.4.2 GInspector Qualifications
1.4.3 GQualification of Structural Steel
Fabricator
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 13 PAGES
05 59 20 2.2.3.2.1 GNDT Inspector Certification
SD-09 Manufacturer’s Field
Reports
2.2.8 GControl Dimensions
09 97 02 SD-01 Preconstruction Submittals
1.2 GSafety, Health, and
Environmental Requirements
1.2.1 GAccident Prevention Plan
1.2.1.6 GConfined Spaces Plan
1.2.1.7 GRespiratory Protection Plan
1.2.2.1 GAirborne Sampling Plan
1.2.1 GVentilation Assessment Plan
1.2.2 GMedical Surveillance Plan
1.2.3 GEnvironmental Protection Plan
1.2.3.1Waste Manifest
1.2.3.1 GWaste Disposal Plan
1.2.3.2 GContainment Plan
1.2.3.3 GVisible Emissions Monitoring Plan
1.2.3.4 GPM-10 Monitoring Plan
SD-03 Product Data
Part 2 GManufacturer's MSDS Product
Data Sheet
SD-04 Samples
Part 2 GProduct Samples
2.1 GSpecial Paint Formulas
2.3.3 GSolvent and Thinners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 13 PAGES
09 97 02 SD-06 Test Reports
1.2.3.4PM-10 Test Report
3.4Inspection Reports
1.2.2.2Medical Status Report
1.2.2.3Change in Medical Status Report
1.2.2.1 GAir Monitoring Test Plan
1.2.2.1Air Monitoring Test Report
SD-07 Certificates
1.4.1Certified EHS Professional
1.4.4Coating Thickness Gage
Qualification
1.4.3 GQualified Coating Applicator
3.6.1Contractors Qc Painting And
Coating Inspector
09 97 13.00 40 SD-01 Preconstruction Submittals
1.3 GSafety Plan
Part 2 GMaterial, Equipment, And Fixture
Lists
SD-03 Product Data
2.1.1 GAbrasive Blasting Material
2.1.2 GSealant Compound
2.1.3.1 GInorganic Zinc
2.1.3.1 GInhibitive Polyamide Epoxy
2.1.3.1 GInhibitive Polyamide Epoxy
2.1.3.1 GAliphatic Polyurethane
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 13 PAGES
09 97 13.00 40 1.3Manufacturer's Standard Color
Charts
3.3.1.1Inspection Forms
SD-05 Design Data
2.1.3.1 GInorganic Zinc
2.1.3.1 GInhibitive Polyamide Epoxy
2.1.3.1 GInhibitive Polyamide Epoxy
2.1.3.1 GAliphatic Polyurethane
2.1.3 GMix Design
SD-06 Test Reports
3.3.1 GInspection Reports
2.1.3 GTest Reports
SD-07 Certificates
2.1.1 GAbrasive Blasting Material
2.1.2 GSealant Compound
2.1.3.1Inhibitive Polyamide Epoxy
2.1.3.1Inhibitive Polyamide Epoxy
2.1.3.1Aliphatic Polyurethane
3.2.1 GInorganic Zinc Coating
SD-08 Manufacturer’s Instructions
2.1.3 GProtective Coatings
SD-11 Closeout Submittals
1.5 GWarranty
25 05 11 SD-01 Preconstruction Submittals
3.1.4.3 GWireless Communication
Request
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 13 PAGES
25 05 11 1.4.1 GDevice Account Lock Exception
Request
3.7 GMultiple IP Connection Device
Request
1.8.1.4 GContractor Computer
Cybersecurity Compliance
Statements
1.8.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
SD-02 Shop Drawings
1.7.1 GNetwork Communication Report
1.7.3 GCybersecurity Riser Diagram
SD-06 Test Reports
3.1.4.4 GWireless Communication Test
Report
SD-11 Closeout Submittals
3.2.2.1 GDevice Audit Record Upload
Software
26 05 00.00 40 SD-03 Product Data
2.2.1 GWire and Cable
2.1.2 GCable Trays
3.2.5 GSplices and Connectors
3.3.1 GCommissioning Plan
SD-06 Test Reports
3.3.2 GContinuity Test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 13 PAGES
26 05 00.00 40 3.3.2 GPhase-Rotation Tests
3.3.2 GInsulation Resistance Test
3.3.2 G600-Volt Wiring Test
SD-08 Manufacturer’s Instructions
3.1Manufacturer's Instructions
35 50 34 SD-01 Preconstruction Submittals
2.1.1 G STRWork Plan
2.1.1 G STRStrain Gage Catalog Cut
SD-06 Test Reports
3.4.1Monthly Data Reports
SD-11 Closeout Submittals
3.4.2Draft Instrumentation Report
3.4.3 G STRFinal Instrumentation Report
35 50 56 SD-01 Preconstruction Submittals
1.3.1 G STRWork Plan
3.12.1 G SODive Operation Plan
3.12.2 G SODiving Safe Practices Manual
3.12.4 G SODive Activity Hazard Analysis
3.12.3 G SODive Personnel List with
Qualifications
3.2.1 G STRSurvey Control Work Plan
3.2.2 G STRSurvey Control Records
3.6 G STRMiter Gate Recess Inspection
Report
1.3.1Visual Verification Of Shoring
System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 13 PAGES
35 50 56 1.3.2 GErecting Engineer
3.10.2Line Boring Plan
3.8Anchorage Bar Inspection Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it. Updated .