W912ES21B0010 0003 - Solicitation Amendment 0003.pdf

PDF 284 KB Posted

Attached to
Miter Gate Anchorage Replacement Lock and Dam 5A, 8, and 10 Federal contract opportunity
Solicitation number
W912ES21B0010
Issued by
Department of the Army Corps of Engineers Engineering District St Paul

About this file

This solicitation amendment modifies an invitation for bid for miter gate anchorage replacement projects at three locks and dams. The projects involve removing, fabricating, and replacing six of the eight miter gate anchorages in the main lock chambers at Lock and Dam 5A near Fountain City, Wisconsin, Lock and Dam 8 near Genoa, Wisconsin, and Lock and Dam 10 near Guttenburg, Iowa. The amendment makes changes to specifications, replaces plan sheets, and answers vendor questions. It adjusts dimension controls and clarifies inspection requirements for existing anchorage bars to be reused. Bidders may bid on one, two or all three locations, with individual awards. The combined value is estimated over $10 million. The North American Industry Classification System code is 237990 and the size standard is $39.5 million. Resulting contracts will be firm fixed-price. The solicitation is a total small business set-aside for the U.S. Army Corps of Engineers, St. Paul District.

View the file

Other files for this federal contract opportunity

Other files attached to Miter Gate Anchorage Replacement Lock and Dam 5A, 8, and 10, newest first.
File Type Posted
LD5A Amendment 0004 - HALFSIZE.pdf PDF
W912ES21B0010 0004 - Solicitation Amendment 0004.pdf PDF
LD10 Amendment 0004 - HALFSIZE.pdf PDF
LD10 Amendment 0004 - FULLSIZE.pdf PDF
LD8 Amendment 0004 - HALFSIZE.pdf PDF
LD5A Amendment 0004 - FULLSIZE.pdf PDF
LD8 Amendment 0004 - FULLSIZE.pdf PDF
LD5A Amendment 0003 - FULLSIZE.pdf PDF
LD5A Amendment 0003 - HALFSIZE.pdf PDF
LD5A Submittal Register - Amendment 0003.pdf PDF
LD10 Amendment 0003 - FULLSIZE.pdf PDF
LD10 Submittal Register - Amendment 0003.pdf PDF
LD8 Amendment 0003 - HALFSIZE.pdf PDF
LD10 Amendment 0003 - HALFSIZE.pdf PDF
LD8 Amendment 0003 - FULLSIZE.pdf PDF
05 50 15 Amendment 0003.pdf PDF
LD8 Submittal Register - Amendment 0003.pdf PDF
35 50 56 Amendment 0003.pdf PDF
LD5A Amendment 0002 - FULLSIZE.pdf PDF
35 50 56 Amendment 0002.pdf PDF
05 50 15 Amendment 0002.pdf PDF
LD8 Amendment 0002 - HALFSIZE.pdf PDF
LD10 Amendment 0002 - HALFSIZE.pdf PDF
09 97 02 Amendment 0002.pdf PDF
LD5A Amendment 0002 - HALFSIZE.pdf PDF
LD10 Amendment 0002 - FULLSIZE.pdf PDF
LD8 Amendment 0002 - FULLSIZE.pdf PDF
W912ES21B0010 0002 - Solicitation Amendment 0002.pdf PDF
A22 W912ES21B0010 0001 - Solicitation Amendment 0001.pdf PDF
Section 01 22 00.00 13 Measurements and Payments - Amendment 0001.pdf PDF
W912ES21B0010_Specs.pdf PDF
W912ES21B0010_LD10_Plans.pdf PDF
W912ES21B0010_LD5A_Plans.pdf PDF
W912ES21B0010_LD8_Plans.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this solicitation amendment is to make changes to sections of the specif ications, remove and replace plan sheets, and answ er Vendor submitted questions.

All other solicitation terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Apr-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES21B0010

X 9B. DATED (SEE ITEM 11)

16-Mar-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Apr-2021

CODE

CONTRACTING DIVISION

USACE - ST PAUL

180 FIFTH STREET EAST

SUITE 700

SAINT PAUL MN 55101-1678

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES21B0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The following have been added by full text:

AMENDMENT 0003

The following Specification Sections are removed and replaced:

Specification Section “05 50 15 Amendment 0002” is removed and replace with the file “05 50 15 Amendment 0003”.

Specification Section “35 50 56 Amendment 0002” is removed and replace with the file “35 50 56 Amendment 0003”.

The attachment Submittal Registers in Section 01 33 00 are removed and replaced with the following files:

LD5A Submittal Register – Amendment 0003 LD8 Submittal Register – Amendment 0003 LD10 Submittal Register – Amendment 0003

Plan Sheets SD101, SD102, SD501, SD503, SG502, SG503, SG506 and SG509 are removed and replaced for LD 5A.

Replacement Plan Sheets can be found in the following files:

LD5A Amendment 0003 – FULLSIZE.pdf LD5A Amendment 0003 – HALFSIZE.pdf

Plan Sheets SD101, SD102, SD501, SG502, SG503, SG506 and SG509 are removed and replaced for LD 8.

Replacement Plan Sheets can be found in the following files:

LD8 Amendment 0003 – FULLSIZE.pdf LD8 Amendment 0003 – HALFSIZE.pdf

Plan Sheets SD101, SD102, SD501, SD503, SG502, SG503, SG504, SG506 and SG509 are removed and replaced for LD 5A. Replacement Plan Sheets can be found in the following files:

LD10 Amendment 0003 – FULLSIZE.pdf LD10 Amendment 0003 – HALFSIZE.pdf

Section 00 73 00

Government-Furnished Property Identification and Location paragraph b) which currently reads:

b) The following is a list of Government-Furnished Property:

Gudgeon Pin (six per Lock and Dam) Anchor Bar Assemblies (six per Lock and Dam)

Spacer plates (several assorted sizes) for alignment of anchor bar assemblies into miter gate and anchorage connections

Is hereby changed to read:

b) The following is a list of Government-Furnished Property:

Gudgeon Pin (six per Lock and Dam) Anchor Bar Assemblies (six per Lock and Dam) Gudgeon rings (several assorted sizes) for alignment of anchor bar assemblies into miter gate at gudgeon hood connection.

Vendor Questions and Answers:

Q - During the Lock 8 Pre-construction site visit, the contractor noticed steel plates embedded in the concrete lock wall face in the anchorage recess area of Miter Gates 2 and Miter Gates 4. These steel plates start at the top of wall and appear to extend down below water line and start at the upstream corner of the anchorage recess extending approximately 64" downstream. These plates are in the area called out for concrete removal. Do new steel plates need to be embedded in the concrete or is it to be left as bare concrete?

A – The installation of new (replacement) steel plates at all three sites have now been included in the associated plans and specifications. See specification section 05 50 15 and plan sheets SD101, SD102, SD502, SD503, SG502 and SG503 in this solicitation amendment for revised information.

Q – The contract specification section 35 50 56 paragraph 3.8 states that once the anchorage bars have been removed the contractor is to clean and degrease the anchorage bars for inspection. In previous contracts the government has specified the anchorage bars were to be cleaned, disassembled, and dye penetrant tested for cracks. This work was previously performed at a machine shop due to the significant effort required to disassemble the anchorage bars. Is the government wanting the anchorage bars to be disassembled so they can be properly inspected? Also is the government or contractor to perform the inspection and what are the inspection requirements?

A – Specification section 35 50 56 has been revised to reflect the need for the gudgeon pin plate area to be cleaned and degreased, not the anchorage bars. Also, the section has been revised to reflect the need for the existing anchorage bars, which will be reused, to be fully inspected with dy penetrant. It will also require a submittal to the Government of the inspection results. See specification section 35 50 56 and revised submittal registers (for all three sites) for associated information.

Q – The contract specifications section 35 50 56 para 3.11 calls for the anchorage bars to be adjusted until the quoin blocks and miter blocks are in firm contact when the miter gate is in the mitered position. If there is a gap at the quoin block does the contractor need to install shims behind the quoin block to adjust the quoin block gap? If shims are required, can the government provide a desired material, drawing detail, and quantity of the required shims the contractor should account for in the bid?

A – Adjustments should be made at the sleeve nuts. No adjustments should be made at the quoin blocks." See Specification Section 35 50 56, Para. 3.11 for details.

Q – The "Bill of Materials – Mechanical" on sheet M-501 shows Item 5 – Adjusting Rings in quantities and sizes per "Set Info" shown in detail A6 – Anchor Bar Adjusting Rings.

The following specification SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS, GOVERNMENT-FURNISHED PROPERTY IDENTIFICATION AND LOCATION (Sheet 220 of 258) subsection b) states:

The following is a list of Government-Furnished Property:

Spacer plates (several assorted sizes) for alignment of anchor bar assemblies into miter gate and anchorage connections.

Are the Anchor Bar Adjusting Rings referred to on Sheet M-501 the same item as the Government-Furnished Spacer plates referred to in the specifications and are they to be supplied by the government?

A - No, Spacer plates are to be supplied by the Government and they are called gudgeon rings on S-152 of Miter Gate 5A, 8, and 10 set. Spacer plates at anchor pin connection are not Government-Furnished and are called anchorage bar adjusting rings on M-501 of this contract.

Q - Reference Gov't response to question I.D. 9125589. There are 6 pieces of plate forming the pin plate connection of which the outer 2 pieces (top & bottom flange) are "fixed" by welding. The dimension between the outer 2 pieces vary somewhat due to welding. It is understood that the thickness of the middle 4 pieces have to be machined to custom fit in between the outer 2 pieces. This is so Note 13 on SG506 can be adhered to in that prior to tensioning the bolts, no gap greater than 0.010" exists within the boundary of the faying surface. Based on statements above, the open portion between the pin plates cannot be not be held to same 0.010" tolerance as there is variability in outer 2 plates. This is why the #3, & #4 tolerance was changed to +/- 1/16" on previous anchorage project. Also, the 9" dimension was not a control dimension on previous anchorage project for the same reason. We ask that the #3 & #4 tolerance be changed to +/- 1/16" and the #2 tolerance requirement be deleted. Please confirm.

A - The dimension control on sheets SG506 and SG509 at all three sites have been adjusted. See plan sheets SG506 and SG509 in this solicitation amendment.

(End of Summary of Changes)