Section 01 22 00.00 13 Measurements and Payments - Amendment 0001.pdf

PDF 29 KB Posted

Attached to
Miter Gate Anchorage Replacement Lock and Dam 5A, 8, and 10 Federal contract opportunity
Solicitation number
W912ES21B0010
Issued by
Department of the Army Corps of Engineers Engineering District St Paul

About this file

This document is a Measurement and Payment specification for a federal construction contract to replace miter gate anchorages at three locks along the Upper Mississippi River. The specification outlines 17 lump sum payment items for work including removing and installing new anchorages, instrumentation and monitoring, electrical work, and anchorage bar fabrication. Payment will be made upon completion of the specified work for each lock, which is to be bid and awarded separately. The contractor will furnish all labor, materials and equipment. The total combined value of the three lock projects is estimated between $10-15 million. The North American Industry Classification code is 237990 and it has been set aside for small businesses. The U.S. Army Corps of Engineers, St. Paul District is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Miter Gate Anchorage Replacement Lock and Dam 5A, 8, and 10, newest first.
File Type Posted
LD5A Amendment 0004 - HALFSIZE.pdf PDF
W912ES21B0010 0004 - Solicitation Amendment 0004.pdf PDF
LD5A Amendment 0004 - FULLSIZE.pdf PDF
LD8 Amendment 0004 - FULLSIZE.pdf PDF
LD10 Amendment 0004 - HALFSIZE.pdf PDF
LD10 Amendment 0004 - FULLSIZE.pdf PDF
LD8 Amendment 0004 - HALFSIZE.pdf PDF
LD5A Amendment 0003 - FULLSIZE.pdf PDF
LD5A Amendment 0003 - HALFSIZE.pdf PDF
LD5A Submittal Register - Amendment 0003.pdf PDF
LD8 Submittal Register - Amendment 0003.pdf PDF
35 50 56 Amendment 0003.pdf PDF
LD10 Amendment 0003 - FULLSIZE.pdf PDF
LD10 Submittal Register - Amendment 0003.pdf PDF
LD8 Amendment 0003 - HALFSIZE.pdf PDF
W912ES21B0010 0003 - Solicitation Amendment 0003.pdf PDF
LD10 Amendment 0003 - HALFSIZE.pdf PDF
LD8 Amendment 0003 - FULLSIZE.pdf PDF
05 50 15 Amendment 0003.pdf PDF
LD5A Amendment 0002 - FULLSIZE.pdf PDF
35 50 56 Amendment 0002.pdf PDF
05 50 15 Amendment 0002.pdf PDF
LD10 Amendment 0002 - FULLSIZE.pdf PDF
LD8 Amendment 0002 - FULLSIZE.pdf PDF
W912ES21B0010 0002 - Solicitation Amendment 0002.pdf PDF
LD8 Amendment 0002 - HALFSIZE.pdf PDF
LD10 Amendment 0002 - HALFSIZE.pdf PDF
09 97 02 Amendment 0002.pdf PDF
LD5A Amendment 0002 - HALFSIZE.pdf PDF
A22 W912ES21B0010 0001 - Solicitation Amendment 0001.pdf PDF
W912ES21B0010_Specs.pdf PDF
W912ES21B0010_LD10_Plans.pdf PDF
W912ES21B0010_LD5A_Plans.pdf PDF
W912ES21B0010_LD8_Plans.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LD5A, LD8 and LD10 Anchorage Replacement W912ES21B0010

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.00 13

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 COMPENSATION

1.2 APPROVAL OF MATERIALS OR ALTERNATES

1.3 LUMP SUM PAYMENT ITEMS

1.3.1 Bonds (Performance And Payment)

1.3.1.1 Payment

1.3.1.2 Unit of Measurement

1.3.2 Upstream Miter Gate Anchorages - Recess And Secure Upstream

Miter Gate Leaves

1.3.2.1 Payment

1.3.2.2 Unit of Measurement

1.3.3 Upstream Miter Gate Anchorages - Remove Existing Upstream

Miter Gate Anchorages

1.3.3.1 Payment

1.3.3.2 Unit of Measurement

1.3.4 Upstream Miter Gate Anchorages - Install New Upstream Miter

Gate Anchorages

1.3.4.1 Payment

1.3.4.2 Unit of Measurement

1.3.5 Upstream Miter Gate Anchorages - Reassemble Upstream Miter

Gates, Anchorage Bars, Anchorage Bar Pins, Gudgeon Pins, And Temporary Support Removal

1.3.5.1 Payment

1.3.5.2 Unit of Measurement

1.3.6 Upstream Miter Gate Anchorages - Instrumentation And Monitoring

1.3.6.1 Payment

1.3.6.2 Unit of Measurement

1.3.7 Upstream Miter Gate Anchorages - Anchorage Bar Pin Fabrication

1.3.7.1 Payment

1.3.7.2 Unit of Measurement

1.3.8 Downstream Miter Gate Anchorages - Recess And Secure

Downstream Miter Gate Leaves

1.3.8.1 Payment

1.3.8.2 Unit of Measurement

1.3.9 Downstream Miter Gate Anchorages - Remove Existing Downstream

Miter Gate Anchorages

1.3.9.1 Payment

1.3.9.2 Unit of Measurement

1.3.10 Downstream Miter Gate Anchorages - Install New Downstream

Miter Gate Anchorages

1.3.10.1 Payment

1.3.10.2 Unit of Measurement

1.3.11 Downstream Miter Gate Anchorages - Reassemble Downstream

Miter Gates, Anchorage Bars, Anchorage Bar Pins, Gudgeon Pins, And Temporary Support Removal

SECTION 01 22 00.00 13 Page 1

1.3.11.1 Payment

1.3.11.2 Unit of Measurement

1.3.12 Downstream Miter Gate Anchorages - Instrumentation And

Monitoring

1.3.12.1 Payment

1.3.12.2 Unit of Measurement

1.3.13 Downstream Miter Gate Anchorages - Anchorage Bar Pin

Fabrication

1.3.13.1 Payment

1.3.13.2 Unit of Measurement

1.3.14 Electrical - Upper Intermediate Wall

1.3.14.1 Payment

1.3.14.2 Unit of Measurement

1.3.15 Electrical - Lower Intermediate Wall

1.3.15.1 Payment

1.3.15.2 Unit of Measurement

1.3.16 Electrical - Lower Land Wall

1.3.16.1 Payment

1.3.16.2 Unit of Measurement

1.3.17 Electrical - Upper Land Wall

1.3.17.1 Payment

1.3.17.2 Unit of Measurement

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section Table of Contents --

SECTION 01 22 00.00 13 Page 2

SECTION 01 22 00.00 13

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 COMPENSATION

The payment provided for in the contract shall constitute full compensation for furnishing all materials and for performing all work under the contract in a complete and acceptable manner. The contract work shall include providing plant, equipment, tools, supplies, labor, supervision, incidental materials, quality control, environmental protection, and meeting safety requirements, and for performing all work required for which separate payment is not otherwise provided.

Compensation for all work shown, specified, or essential to completion of the project (whether or not the specific material or operation is indicated) shall be included in the bid price. The payment provided for in the contract includes compensation for all risk, loss, damage, and expense arising out of the nature of the work or its prosecution, subject to conditions of the contract. Payment for each contract line item will constitute full compensation for furnishing the materials and constructing the work complete in place as specified.

1.2 APPROVAL OF MATERIALS OR ALTERNATES

Requests for approval of materials and products, or substitutes thereof, will not be considered prior to award of the contract.

1.3 LUMP SUM PAYMENT ITEMS

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the BID SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum payment item, shall be included in the listed lump sum item most closely associated with the work involved.

The lump sum price and payment made for each item listed shall constitute full compensation for performing all work required for which separate payment is not otherwise provided.

1.3.1 Bonds (Performance And Payment)

1.3.1.1 Payment

Payment will be made for costs associated with performance and payment bonds in accordance with contract requirements. Bonds will be paid for on a job basis in accordance with CONTRACT CLAUSE 52.232-5 PAYMENTS UNDER

FIXED-PRICE CONSTRUCTION CONTRACTS.

1.3.1.2 Unit of Measurement

Job

SECTION 01 22 00.00 13 Page 3

1.3.2 Upstream Miter Gate Anchorages - Recess And Secure Upstream Miter Gate Leaves

1.3.2.1 Payment

Payment will be made for furnishing all materials, equipment and labor and performing all operations necessary to Recess and Secure the Upstream Miter Gate Leaves as shown and specified for the identified lock. This work shall include, but is not limited to, installing any necessary straps or wire rope to hold the upstream miter gates securely in place once the anchor bars are removed. Installation of shoring, blocking, or bracing under the miter end of the bottom horizontal girder shall be considered incidental to this payment item.

1.3.2.2 Unit of Measurement

Job

1.3.3 Upstream Miter Gate Anchorages - Remove Existing Upstream Miter Gate Anchorages

1.3.3.1 Payment

Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary to Remove Existing Upstream Miter Gate Anchorages as shown and specified for the identified lock. Four existing miter gate anchorages will be removed, two miter anchorages and two recess anchorages. Work shall include, but is not limited to, removing all four upstream anchorage bars, anchorage bar pins, gudgeon pins, as well as the portions of the anchorages. Offsite disposal of all demolished materials shall be considered incidental to this payment item.

1.3.3.2 Unit of Measurement

Job

1.3.4 Upstream Miter Gate Anchorages - Install New Upstream Miter Gate Anchorages

1.3.4.1 Payment

Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary to fabricate and Install New Upstream Miter Gate Anchorages as shown and specified for the identified lock. Four miter gate anchorages will be fabricated and installed, two miter anchorages and two recess anchorages.

1.3.4.2 Unit of Measurement

Job

1.3.5 Upstream Miter Gate Anchorages - Reassemble Upstream Miter Gates, Anchorage Bars, Anchorage Bar Pins, Gudgeon Pins, And Temporary Support Removal

1.3.5.1 Payment

Payment will be made for furnishing all materials, equipment, and labor

SECTION 01 22 00.00 13 Page 4 and performing all operations necessary to Reassemble the Upstream Miter Gates, Anchorage Bars, Anchorage Bar Pins, Gudgeon Pins, and Temporary Support Removal, as shown and specified for the identified lock. Work shall include, but is not limited to, installing the anchorage bars, connecting the anchorage bars to the anchorage by installing the anchorage bar pins and their keepers, connecting the anchorage bars to the miter gates by installing the gudgeon pins and their keepers as well as removing any temporary supports that were used to secure the gate while it was disconnected from the anchorage. Adjustment of the anchorage bars to ensure proper contact and alignment with the contact blocks and test operation of the miter gates through their full range of travel is considered incidental to this payment item.

1.3.5.2 Unit of Measurement

Job

1.3.6 Upstream Miter Gate Anchorages - Instrumentation And Monitoring

1.3.6.1 Payment

Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary for Instrumentation and Monitoring for four miter gate anchorages (two miter anchorages and two recess anchorages) as shown and specified for the identified lock. Work shall include, but is not limited to furnishing and installing strain gages, monitoring and data logging equipment, and data transmission equipment.

All calculations, reports, report writing, and travel necessary to complete the monitoring and reporting required as part of this specification shall be considered incidental to this payment item.

1.3.6.2 Unit of Measurement

Job

1.3.7 Upstream Miter Gate Anchorages - Anchorage Bar Pin Fabrication

1.3.7.1 Payment

Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary to fabricate the anchorage bar pins and keepers as shown and specified for the upstream miter gate anchorages for the identified lock. Work shall include, but is not limited to, fabricating the four anchorage bar pins and associated keepers.

Delivery to the project site is incidental to this payment item.

1.3.7.2 Unit of Measurement

Job

1.3.8 Downstream Miter Gate Anchorages - Recess And Secure Downstream Miter Gate Leaves

1.3.8.1 Payment

Payment will be made for furnishing all materials, equipment and labor and performing all operations necessary to Recess and Secure the Downstream Miter Gate Leaves as shown and specified for the miter gate anchorages for the identified lock. This work shall include, but is not limited to, SECTION 01 22 00.00 13 Page 5 installing any necessary straps or wire rope to hold the upstream miter gates securely in place once the anchor bars are removed. Installation of shoring, blocking, or bracing under the miter end of the bottom horizontal girder shall be considered incidental to this payment item.

1.3.8.2 Unit of Measurement

Job

1.3.9 Downstream Miter Gate Anchorages - Remove Existing Downstream Miter Gate Anchorages

1.3.9.1 Payment

Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary to Remove Existing Downstream Miter Gate Anchorages as shown and specified for the identified lock. Only the two existing downstream miter anchorages will be removed. Work shall include, but is not limited to, removing two downstream anchorage bars, two anchorage bar pins, two gudgeon pins, as well as the portions of the anchorages. Offsite disposal of all demolished materials shall be considered incidental to this payment item.

1.3.9.2 Unit of Measurement

Job

1.3.10 Downstream Miter Gate Anchorages - Install New Downstream Miter Gate Anchorages

1.3.10.1 Payment

Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary to fabricate and Install New Downstream Miter Gate Anchorages as shown and specified for the identified lock. Only the two miter anchorages will be fabricated and installed.

1.3.10.2 Unit of Measurement

Job

1.3.11 Downstream Miter Gate Anchorages - Reassemble Downstream Miter Gates, Anchorage Bars, Anchorage Bar Pins, Gudgeon Pins, And Temporary Support Removal

1.3.11.1 Payment

Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary to Reassemble the Downstream Miter Gates, Gudgeon Pins, anchorage bars and anchorage pins for the two downstream miter anchorages, and Temporary Support Removal, as shown and specified for the identified lock. Work shall include, but is not limited to, installing the anchorage bars, connecting the anchorage bars to the anchorage by installing the anchorage bar pins and their keepers, connecting the anchorage bars to the miter gates by installing the gudgeon pins and their keepers as well as removing any temporary supports that were used to secure the gate while it was disconnected from the anchorage.

Adjustment of the anchorage bars to ensure proper contact and alignment with the contact blocks and test operation of the miter gates through

SECTION 01 22 00.00 13 Page 6 their full range of travel is considered incidental to this payment item.

1.3.11.2 Unit of Measurement

Job

1.3.12 Downstream Miter Gate Anchorages - Instrumentation And Monitoring

1.3.12.1 Payment

Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary for Instrumentation and Monitoring for two downstream miter gate anchorages (the two miter anchorages only) as shown and specified for the identified lock. Work shall include, but is not limited to furnishing and installing strain gages, monitoring and data logging equipment, and data transmission equipment. All calculations, reports, report writing, and travel necessary to complete the monitoring and reporting required as part of this specification shall be considered incidental to this payment item.

1.3.12.2 Unit of Measurement

Job

1.3.13 Downstream Miter Gate Anchorages - Anchorage Bar Pin Fabrication

1.3.13.1 Payment

Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary to fabricate the anchorage bar pins and keepers as shown and specified for two downstream miter gates anchorages (two miter anchorages only) for the identified lock. Work shall include, but is not limited to, fabricating the two anchorage bar pins and keepers. Delivery to the project site is incidental to this payment item.

1.3.13.2 Unit of Measurement

Job

1.3.14 Electrical - Upper Intermediate Wall

1.3.14.1 Payment

Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary to install electrical on the upper intermediate wall as shown and specified for the identified lock. This shall include removal and re-installation or replacement of cables, cable tray, conduit and all fittings, couplings, splices, and other item necessary for a complete installation.

1.3.14.2 Unit of Measurement

Job

1.3.15 Electrical - Lower Intermediate Wall

1.3.15.1 Payment

Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary to install electrical on the lower

SECTION 01 22 00.00 13 Page 7 intermediate wall as shown and specified for the identified lock. This shall include removal and re-installation or replacement of cables, cable tray, conduit and all fittings, couplings, splices, and other item necessary for a complete installation.

1.3.15.2 Unit of Measurement

Job

1.3.16 Electrical - Lower Land Wall

1.3.16.1 Payment

Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary to install electrical on the lower land wall as shown and specified for the identified lock. This shall include removal and re-installation or replacement of cables, cable tray, conduit and all fittings, couplings, splices, and other item necessary for a complete installation.

1.3.16.2 Unit of Measurement

Job

1.3.17 Electrical - Upper Land Wall

1.3.17.1 Payment

Payment will be made for furnishing all materials, equipment, and labor and performing all operations necessary to install electrical on the upper land wall as shown and specified for the identified lock. This shall include removal and re-installation or replacement of cables, cable tray, conduit and all fittings, couplings, splices, and other item necessary for a complete installation.

1.3.17.2 Unit of Measurement

Job

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section --

SECTION 01 22 00.00 13 Page 8

DIVISION 01 - GENERAL REQUIREMENTS
01 22 00.00 13 - MEASUREMENT AND PAYMENT
01 22 00.00 13 - MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 COMPENSATION
1.2 APPROVAL OF MATERIALS OR ALTERNATES
1.3 LUMP SUM PAYMENT ITEMS
1.3.1 Bonds Performance And Payment
1.3.1.1 Payment
1.3.1.2 Unit of Measurement
1.3.2 Upstream Miter Gate Anchorages - Recess And Secure Upstream Miter
1.3.2.1 Payment
1.3.2.2 Unit of Measurement
1.3.3 Upstream Miter Gate Anchorages - Remove Existing Upstream Miter Gate
1.3.3.1 Payment
1.3.3.2 Unit of Measurement
1.3.4 Upstream Miter Gate Anchorages - Install New Upstream Miter Gate
1.3.4.1 Payment
1.3.4.2 Unit of Measurement
1.3.5 Upstream Miter Gate Anchorages - Reassemble Upstream Miter Gates,
1.3.5.1 Payment
1.3.5.2 Unit of Measurement
1.3.6 Upstream Miter Gate Anchorages - Instrumentation And Monitoring
1.3.6.1 Payment
1.3.6.2 Unit of Measurement
1.3.7 Upstream Miter Gate Anchorages - Anchorage Bar Pin Fabrication
1.3.7.1 Payment
1.3.7.2 Unit of Measurement
1.3.8 Downstream Miter Gate Anchorages - Recess And Secure Downstream
1.3.8.1 Payment
1.3.8.2 Unit of Measurement
1.3.9 Downstream Miter Gate Anchorages - Remove Existing Downstream Miter
1.3.9.1 Payment
1.3.9.2 Unit of Measurement
1.3.10 Downstream Miter Gate Anchorages - Install New Downstream Miter
1.3.10.1 Payment
1.3.10.2 Unit of Measurement
1.3.11 Downstream Miter Gate Anchorages - Reassemble Downstream Miter
1.3.11.1 Payment
1.3.11.2 Unit of Measurement
1.3.12 Downstream Miter Gate Anchorages - Instrumentation And Monitoring
1.3.12.1 Payment
1.3.12.2 Unit of Measurement
1.3.13 Downstream Miter Gate Anchorages - Anchorage Bar Pin Fabrication
1.3.13.1 Payment
1.3.13.2 Unit of Measurement
1.3.14 Electrical - Upper Intermediate Wall
1.3.14.1 Payment
1.3.14.2 Unit of Measurement
1.3.15 Electrical - Lower Intermediate Wall
1.3.15.1 Payment
1.3.15.2 Unit of Measurement
1.3.16 Electrical - Lower Land Wall
1.3.16.1 Payment
1.3.16.2 Unit of Measurement
1.3.17 Electrical - Upper Land Wall
1.3.17.1 Payment
1.3.17.2 Unit of Measurement
PART 2 PRODUCTS Not Applicable
PART 3 EXECUTION Not Applicable