West_Basin_Scour_Repairs_Phase_2_Plans_-_For_Solicitation.pdf
PDF 11 MB Posted
- Attached to
- West Basin Scour Repair Phase 2 Federal contract opportunity
- Solicitation number
- W912EQ18B0008
About this file
Plans
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912EQ18B0008-ABSTRACT_(Autosaved).pdf | ||
| 18B0008_Amendment_2.pdf | ||
| 31_11_00.00_11_-_Amendment_01.pdf | ||
| 18B0008_Amendment_1_.pdf | ||
| Amendment_1_Bid_Schedule.pdf | ||
| Plan_Sheet_C-300_-_Amendment_01.pdf | ||
| 01_22_00.00_11_-_Amendment_01.pdf | ||
| A07D_IFB_16Jul18.pdf | ||
| WB_Specifications_13Jul18.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR SOLICITATION
EXISTING GRADE
FROM KEY CONSTRUCTION
EXCAVATED MATERIAL
WIDTH VARIES
TIE R-400 RIPRAP INTO RTB
THAN 1.5H:1V
NOT STEEPER
SLOPE VARIES
OF 2.5'
MIN. THICKNESS
R-400 RIPRAP
R-400 RIPRAP
1H:1V 1H:1V
FLOOD SIDE LEVEE TOE
EXISTING GRADE
FROM KEY CONSTRUCTION
EXCAVATED MATERIAL
WIDTH VARIES
TIE R-400 RIPRAP INTO RTB
THAN 1.5H:1V
NOT STEEPER
SLOPE VARIES
OF 2.5'
MIN. THICKNESS
R-400 RIPRAP
R-400 RIPRAP
1H:1V 1H:1V
FLOOD SIDE LEVEE TOE
KEY CONSTRUCTION
EXCAVATED MATERIAL FROM
RTB
OF 2.5'
MIN. THICKNESS
R-400 RIPRAP
EXISTING GRADE
HORIZONTAL OFFSET OF KEY = 50'
KEY
KEY CONSTRUCTION
EXCAVATED MATERIAL FROM
RTB
OF 2.5'
MIN. THICKNESS
R-400 RIPRAP
EXISTING GRADE
KEY
HORIZONTAL OFFSET OF KEY = 50'
SEE KEY DETAIL A
SEE KEY DETAIL B
SEE NOTE 6 BELOW.
WATER SURFACE ELEVATION
SEE NOTE 6 BELOW.
WATER SURFACE ELEVATION
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
X X
X X
X X -X
X -X -X
X X
X
W X
X X
X X -X
X -X -X
X
M E
M P
H
IS
D
IS
T R
IC
T
N
M A
IN
S
T
M E
M P
H
IS
T
N
J T
G
J T
G
M B
C
S H
A N
E C
A L L
A H
A N P .E
A P
R
IL
C A
P E G
IR
A R
D E
A U C
O U
N T
Y
M
IS
S O
U R I
L
IT
T L E R
IV
E R D
R A
IN
A G
E D
IS
T R
IC
T L E
V E
E B /L S
T A T
O B /L S
T A
D
IV
E R
S
IO
N C
H A
N N
E L S
C O
U R R
E P
A
IR
S W
E S
T B
A S
IN
L
E V
E E H
E A
D W
A T
R
S T F
R A
N C
IS
B
A S
IN
M
A
IN
T E
N A
N C
E
E L E
V A
T
IO
N
E L E
V A
T
IO
N
380 380
-260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80
E L E
V A
T
IO
N
-260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80
E L E
V A
T
IO
N
KEY DETAIL A
KEY DETAIL B
0 020' 40' 20' 40'
TYPICAL CROSS SECTION
PROTECTED SIDE
B
/LC
/L
R T
B
FLOOD SIDE
TYPICAL CROSS SECTION
PROTECTED SIDEFLOOD SIDE
B
/LC
/L
R T
B
SCALE: NTS
B C
HORIZONTAL SCALE:1"=20' VERTICAL SCALE:1"=20'
0 020' 40' 20' 40'
HORIZONTAL SCALE:1"=20' VERTICAL SCALE:1"=20'
SCALE: NTS
B C
C-300
T Y
P
IC
A L C
R O
S S S
E C
T
IO
N S
1.5 H
1.5 H
1V
1V
C) THE KEY BOTTOM WIDTH SHALL BE 1.5', DIMENSION C.
FROM THE EXCAVATION POINT SHOWN IN THE KEY DETAIL, DIMENSION B.
B) THE DEPTH OF THE KEY SHALL BE 4 FEET BELOW EXISTING GRADE
POINT SHOWN IN THE KEY DETAIL.
THE RIGHT TOP BANK (RTB) TO THE BOTTOM OF KEY EXCAVATION
A) HORIZONTAL OFFSET OF KEY DISTANCE SHALL BE MEASURED FROM
NOTES:
C) THE KEY BOTTOM WIDTH SHALL BE 1.5', DIMENSION C.
FROM THE EXCAVATION POINT SHOWN IN THE KEY DETAIL, DIMENSION B.
B) THE DEPTH OF THE KEY SHALL BE 4 FEET BELOW EXISTING GRADE
POINT SHOWN IN THE KEY DETAIL.
THE RIGHT TOP BANK (RTB) TO THE BOTTOM OF KEY EXCAVATION
A) HORIZONTAL OFFSET OF KEY DISTANCE SHALL BE MEASURED FROM
NOTES:
MAX SLOPE 5H:1V
SLOPE TO DRAIN
MAX SLOPE 5H:1V
SLOPE TO DRAIN
SURFACE ELEVATION AT THE TIME OF CONSTRUCTION. STAGE HYDROGRAPHS ARE PROVIDED ON SHEET X-100.
SEA 1600801 SURVEY WAS COMPLETED AND IS SHOWN FOR REFERENCE ONLY AND SHOULD NOT BE USED TO DETERMINE OR ANTICIPATE THE WATER
6) THE WATER SURFACE ELEVATION SHOWN IN THE TYPICAL CROSS SECTIONS WAS THE WATER SURFACE ELEVATION AT THE TIME WHEN THE 2017
DURING THE PROJECT.
TYPICAL CROSS SECTIONS ARE BEING PROVIDED IN ORDER TO SHOW DIFFERENT EXISTING GRADE SCENARIOS THAT THE CONTRACTOR MAY SEE
5) THE TYPICAL CROSS SECTIONS PROVIDED SHOW THE SAME CONSTRUCTION REQUIREMENTS FOR REPAIRING ALL OF THE SCOUR SITES. TWO
EXCAVATED MATERIAL OBTAINED FROM THE KEY CONSTRUCTION IS SEEDED & MULCHED ACCORDING TO THE PROJECT SPECIFICATIONS.
4) CONTRACTOR SHALL ENSURE THE SPOIL AREAS LOCATED IN BETWEEN THE CHANNEL RIGHT TOP BANK AND FLOOD SIDE LEVEE TOE THAT RECEIVE
BE PLACED AS SEMI-COMPACTED BACKFILL AS SPECIFIED IN THE PROJECT SPECIFICATIONS.
RIGHT TOP BANK AND FLOOD SIDE LEVEE TOE SHALL NOT EXCEED A MAXIMUM FINAL THICKNESS OF 1'. THIS EXCAVATED MATERIAL SHALL ALSO
3) THE EXCAVATED MATERIAL OBTAINED FROM THE KEY CONSTRUCTION THAT IS PLACED IN THE SPOIL AREAS LOCATED IN BETWEEN THE CHANNEL
EXCAVATED MATERIAL OBTAINED FROM THE KEY CONSTRUCTION WHEN PLACED IN THE SPOIL AREAS SHALL BE NO STEEPER THAN 5H:1V.
IN THE SPOIL AREAS SHALL BE DETERMINED IN THE FIELD BY THE CONTRACTING OFFICER. HOWEVER THE MAX ALLOWABLE FINAL SLOPE OF THE
THE CHANNEL RIGHT TOP BANK FOR THE DURATION OF THE PROJECT. THE SPECIFIC GRADE OF THE EXCAVATED MATERIAL WHEN IT IS PLACED
LOCATED IN BETWEEN THE CHANNEL RIGHT TOP BANK AND FLOOD SIDE LEVEE TOE IS SLOPED TO DRAIN AWAY FROM THE LEVEE AND TOWARDS
2) CONTRACTOR SHALL ENSURE THAT THE EXCAVATED MATERIAL OBTAINED FROM THE KEY CONSTRUCTION THAT IS PLACED IN THE SPOIL AREAS
SCOUR REPAIR SITES. THE APPROXIMATE LEVEE BASELINE STATION LIMITS FOR EACH OF THE SCOUR REPAIR SITES CAN BE FOUND ON SHEET G-002.
BE TRANSITIONED DOWN TO ITS FULL DEPTH FROM EXISTING GRADE AT THE START AND END LEVEE BASELINE STATION LIMITS FOR EACH OF THE
1) THE RIPRAP KEY SHALL BE EXCAVATED TO ITS FULL DEPTH FOR THE ENTIRE LENGTH OF EACH OF THE SCOUR REPAIR SITES. THE KEY SHALL NOT
NOTES:
SURFACE ELEVATION AT THE TIME OF CONSTRUCTION. STAGE HYDROGRAPHS ARE PROVIDED ON SHEET X-100.
SEA 1600801 SURVEY WAS COMPLETED AND IS SHOWN FOR REFERENCE ONLY AND SHOULD NOT BE USED TO DETERMINE OR ANTICIPATE THE WATER
6) THE WATER SURFACE ELEVATION SHOWN IN THE TYPICAL CROSS SECTIONS WAS THE WATER SURFACE ELEVATION AT THE TIME WHEN THE 2017
DURING THE PROJECT.
TYPICAL CROSS SECTIONS ARE BEING PROVIDED IN ORDER TO SHOW DIFFERENT EXISTING GRADE SCENARIOS THAT THE CONTRACTOR MAY SEE
5) THE TYPICAL CROSS SECTIONS PROVIDED SHOW THE SAME CONSTRUCTION REQUIREMENTS FOR REPAIRING ALL OF THE SCOUR SITES. TWO
EXCAVATED MATERIAL OBTAINED FROM THE KEY CONSTRUCTION IS SEEDED & MULCHED ACCORDING TO THE PROJECT SPECIFICATIONS.
4) CONTRACTOR SHALL ENSURE THE SPOIL AREAS LOCATED IN BETWEEN THE CHANNEL RIGHT TOP BANK AND FLOOD SIDE LEVEE TOE THAT RECEIVE
BE PLACED AS SEMI-COMPACTED BACKFILL AS SPECIFIED IN THE PROJECT SPECIFICATIONS.
RIGHT TOP BANK AND FLOOD SIDE LEVEE TOE SHALL NOT EXCEED A MAXIMUM FINAL THICKNESS OF 1'. THIS EXCAVATED MATERIAL SHALL ALSO
3) THE EXCAVATED MATERIAL OBTAINED FROM THE KEY CONSTRUCTION THAT IS PLACED IN THE SPOIL AREAS LOCATED IN BETWEEN THE CHANNEL
EXCAVATED MATERIAL OBTAINED FROM THE KEY CONSTRUCTION WHEN PLACED IN THE SPOIL AREAS SHALL BE NO STEEPER THAN 5H:1V.
IN THE SPOIL AREAS SHALL BE DETERMINED IN THE FIELD BY THE CONTRACTING OFFICER. HOWEVER THE MAX ALLOWABLE FINAL SLOPE OF THE
THE CHANNEL RIGHT TOP BANK FOR THE DURATION OF THE PROJECT. THE SPECIFIC GRADE OF THE EXCAVATED MATERIAL WHEN IT IS PLACED
LOCATED IN BETWEEN THE CHANNEL RIGHT TOP BANK AND FLOOD SIDE LEVEE TOE IS SLOPED TO DRAIN AWAY FROM THE LEVEE AND TOWARDS
2) CONTRACTOR SHALL ENSURE THAT THE EXCAVATED MATERIAL OBTAINED FROM THE KEY CONSTRUCTION THAT IS PLACED IN THE SPOIL AREAS
SCOUR REPAIR SITES. THE APPROXIMATE LEVEE BASELINE STATION LIMITS FOR EACH OF THE SCOUR REPAIR SITES CAN BE FOUND ON SHEET G-002.
BE TRANSITIONED DOWN TO ITS FULL DEPTH FROM EXISTING GRADE AT THE START AND END LEVEE BASELINE STATION LIMITS FOR EACH OF THE
1) THE RIPRAP KEY SHALL BE EXCAVATED TO ITS FULL DEPTH FOR THE ENTIRE LENGTH OF EACH OF THE SCOUR REPAIR SITES. THE KEY SHALL NOT
NOTES:
B
A
N.T.S.
EROSION CONTROL BERM DETAIL
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
X X
X X
X X -X
X -X -X
X X
X
W X
X X
X X -X
X -X -X
M
M P
H
IS
D
IS
T R
IC
T
N
M A
IN
S
T
M E
M P
H
IS
T
N
J T
G
J T
G
M B
C
S H
A N
E C
A L L
A H
A N P .E
A P
R
IL
C A
P E G
IR
A R
D E
A U C
O U
N T
Y
M
IS
S O
U R I
L
IT
T L E R
IV
E R D
R A
IN
A G
E D
IS
T R
IC
T L E
V E
E B /L S
T A T
O B /L S
T A
D
IV
E R
S
IO
N C
H A
N N
E L S
C O
U R R
E P
A
IR
S W
E S
T B
A S
IN
L
E V
E E H
E A
D W
A T
R
S T F
R A
N C
IS
B
A S
IN
M
A
IN
T E
N A
N C
SILT FENCE DETAIL
N.T.S.
C-500
E R
O S
IO
N C
O N
T R
O L D
E T
A
IL
S
SECURED AT A SUPPORT POST.
6" MINIMUM OVERLAP AND BE
SPLICED JOINTS SHALL BE A
NOTE:
6' MAX.
RUNOFF
4"6"
EARTH BACKFILL
END OF FABRIC
OF FABRIC
10" BURIED END
APPROVED EQUAL
WOODEN POST OR
FABRIC
FILTER
FABRIC
OVERLAPPING
END OF
GROUND LINE
RUNOF
F
34" MAX.
16" MIN.
GROUND SURFACE
DRIVE POST 24" BELOW
EQUAL - 5' MIN. LENGTH.
WOODEN POST OR APPROVED
7) FIELD ADJUSTMENTS ALLOWED AS NECESSARY TO ENSURE PROPER PLACEMENT AND FUNCTION.
SILT FENCE AND STABILIZE WITH PERMANENT SEEDING AND MULCHING.
6) UPON CONSTRUCTION COMPLETION, PRIOR TO FINAL ACCEPTANCE, REMOVE ALL EROSION CONTROL BERM AND/OR
5) SILT FENCE SHALL BE PLACED ALONG SLOPE CONTOURS TO MAXIMIZE PONDING EFFICIENCY.
AND CAN BE PERMANENTLY STABILIZED.
4) REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE SEDIMENT OFF-SITE
REACH 1/3 THE HEIGHT OF THE SILT FENCE BARRIER.
3) INSPECT AND REPAIR SILT FENCE AFTER EACH STORM EVENT. SEDIMENT SHALL BE REMOVED WHEN DEPOSITS
2) SILT FENCE MAY BE USED IN LIEU OF EROSION CONTROL BERM.
BY THE SPECIFICATIONS.
BERMS TO COMPLY WITH THE DESIGN GRADE REQUIREMENTS AS SHOWN IN THE PLANS AND AS REQUIRED
1) UPON CONSTRUCTION COMPLETION AND PRIOR TO FINAL ACCEPTANCE, REGRADE ALL EROSION CONTROL
NOTES:
EXISTING GRADE
0.5' MIN
1' MIN
1' MIN
| West Basin |
| Untitled Sheet |
| G-002.pdf |
| West Basin |
| Plot |
| C-100.pdf |
| West Basin |
| Plot Model |
| C-101.pdf |
| West Basin |
| Plot Model |
| C-102.pdf |
| West Basin |
| Plot Model |
| C-103.pdf |
| West Basin |
| Plot Model |
| C-104.pdf |
| West Basin |
| Plot Model |
| C-300.pdf |
| West Basin |
| Plot Model |
| C-500.pdf |
| West Basin |
| PLOT |
| X-100.pdf |
| West Basin |
| Plot Model |
| G-002.pdf |
| West Basin |
| Plot |
| c-300.pdf |
| West Basin |
| Plot Model |
File details come from the government source that posted it.