Plan_Sheet_C-300_-_Amendment_01.pdf
PDF 796 KB Posted
- Attached to
- West Basin Scour Repair Phase 2 Federal contract opportunity
- Solicitation number
- W912EQ18B0008
About this file
Plan Sheet C-300
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912EQ18B0008-ABSTRACT_(Autosaved).pdf | ||
| 18B0008_Amendment_2.pdf | ||
| 31_11_00.00_11_-_Amendment_01.pdf | ||
| Amendment_1_Bid_Schedule.pdf | ||
| 01_22_00.00_11_-_Amendment_01.pdf | ||
| 18B0008_Amendment_1_.pdf | ||
| West_Basin_Scour_Repairs_Phase_2_Plans_-_For_Solicitation.pdf | ||
| A07D_IFB_16Jul18.pdf | ||
| WB_Specifications_13Jul18.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
X X
X X
X X -X
X -X -X
X X
X
W X
X X
X X -X
X -X -X
X X
M E
M P
H
IS
D
IS
T R
IC
T
N
M A
IN
S
T
M E
M P
H
IS
T
N
J T
G
J T
G
M B
C
S H
A N
E C
A L L
A H
A N P .E
C A
P E G
IR
A R
D E
A U C
O U
N T
Y
M
IS
S O
U R I
L
IT
T L E R
IV
E R D
R A
IN
A G
E D
IS
T R
IC
T L E
V E
E B /L S
T A T
O B /L S
T A
D
IV
E R
S
IO
N C
H A
N N
E L S
C O
U R R
E P
A
IR
S W
E S
T B
A S
IN
L
E V
E E H
E A
D W
A T
E R
S T F
R A
N C
IS
B
A S
IN
M
A
IN
T E
N A
N C
E A
U G
U S
T
E L E
V A
T
IO
N
E L E
V A
T
IO
N
380 380
-260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80
E L E
V A
T
IO
N
-260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80
E L E
V A
T
IO
N
KEY DETAIL A
KEY DETAIL B
0 020' 40' 20' 40'
TYPICAL CROSS SECTION
EXISTING GRADE
PROTECTED SIDE
B
/LC
/L
FROM KEY CONSTRUCTION
EXCAVATED MATERIAL
R T
B
WIDTH VARIES
TIE R-400 RIPRAP INTO RTB
THAN 1.5H:1V
NOT STEEPER
SLOPE VARIES
OF 2.5'
MIN. THICKNESS
R-400 RIPRAP
R-400 RIPRAP
1H:1V 1H:1V
FLOOD SIDE
TYPICAL CROSS SECTION
EXISTING GRADE
PROTECTED SIDEFLOOD SIDE
B
/LC
/L
FROM KEY CONSTRUCTION
EXCAVATED MATERIAL
R T
B
WIDTH VARIES
TIE R-400 RIPRAP INTO RTB
THAN 1.5H:1V
NOT STEEPER
SLOPE VARIES
OF 2.5'
MIN. THICKNESS
R-400 RIPRAP
R-400 RIPRAP
1H:1V 1H:1V
FLOOD SIDE LEVEE TOE
KEY CONSTRUCTION
EXCAVATED MATERIAL FROM
RTB
OF 2.5'
MIN. THICKNESS
R-400 RIPRAP
EXISTING GRADE
SCALE: NTS
B
HORIZONTAL OFFSET OF KEY = 50'C
KEY
HORIZONTAL SCALE:1"=20' VERTICAL SCALE:1"=20'
0 020' 40' 20' 40'
HORIZONTAL SCALE:1"=20' VERTICAL SCALE:1"=20'
SCALE: NTS
KEY CONSTRUCTION
EXCAVATED MATERIAL FROM
RTB
OF 2.5'
MIN. THICKNESS
R-400 RIPRAP
EXISTING GRADE
B C
KEY
HORIZONTAL OFFSET OF KEY = 50'
C-300
T Y
P
IC
A L C
R O
S S S
E C
T
IO
N S
1.5 H
1.5 H
1V
1V
C) THE KEY BOTTOM WIDTH SHALL BE 1.5', DIMENSION C.
FROM THE EXCAVATION POINT SHOWN IN THE KEY DETAIL, DIMENSION B.
B) THE DEPTH OF THE KEY SHALL BE 4 FEET BELOW EXISTING GRADE
POINT SHOWN IN THE KEY DETAIL.
THE RIGHT TOP BANK (RTB) TO THE BOTTOM OF KEY EXCAVATION
A) HORIZONTAL OFFSET OF KEY DISTANCE SHALL BE MEASURED FROM
NOTES:
C) THE KEY BOTTOM WIDTH SHALL BE 1.5', DIMENSION C.
FROM THE EXCAVATION POINT SHOWN IN THE KEY DETAIL, DIMENSION B.
B) THE DEPTH OF THE KEY SHALL BE 4 FEET BELOW EXISTING GRADE
POINT SHOWN IN THE KEY DETAIL.
THE RIGHT TOP BANK (RTB) TO THE BOTTOM OF KEY EXCAVATION
A) HORIZONTAL OFFSET OF KEY DISTANCE SHALL BE MEASURED FROM
NOTES:
SEE KEY DETAIL A
SEE KEY DETAIL B
SEE NOTE 6 BELOW.
WATER SURFACE ELEVATION
SEE NOTE 6 BELOW.
WATER SURFACE ELEVATION
MAX SLOPE 5H:1V
SLOPE TO DRAIN
MAX SLOPE 5H:1V
SLOPE TO DRAIN
GRUBBING & SNAGGING LIMITS
BASELINE STATION LIMITS FOR EACH OF THE SCOUR REPAIR SITES CAN BE FOUND ON SHEET G-002.
SNAGGING WITHIN THE START AND END LEVEE BASELINE STATION LIMITS FOR EACH OF THE SCOUR REPAIR SITES. THE APPROXIMATE LEVEE
SITE. UNLESS OTHERWISE DIRECTED BY THE CONTRACTING OFFICER THE CONTRACTOR SHALL ONLY BE REQUIRED TO PERFORM GRUBBING &
7) THE CONTRACTOR SHALL PERFORM GRUBBING & SNAGGING WITHIN THE LIMITS SHOWN IN THE TYPICAL CROSS SECTIONS AT EACH SCOUR REPAIR
SURFACE ELEVATION AT THE TIME OF CONSTRUCTION. STAGE HYDROGRAPHS ARE PROVIDED ON SHEET X-100.
SEA 1600801 SURVEY WAS COMPLETED AND IS SHOWN FOR REFERENCE ONLY AND SHOULD NOT BE USED TO DETERMINE OR ANTICIPATE THE WATER
6) THE WATER SURFACE ELEVATION SHOWN IN THE TYPICAL CROSS SECTIONS WAS THE WATER SURFACE ELEVATION AT THE TIME WHEN THE 2017
DURING THE PROJECT.
TYPICAL CROSS SECTIONS ARE BEING PROVIDED IN ORDER TO SHOW DIFFERENT EXISTING GRADE SCENARIOS THAT THE CONTRACTOR MAY SEE
5) THE TYPICAL CROSS SECTIONS PROVIDED SHOW THE SAME CONSTRUCTION REQUIREMENTS FOR REPAIRING ALL OF THE SCOUR SITES. TWO
EXCAVATED MATERIAL OBTAINED FROM THE KEY CONSTRUCTION IS SEEDED & MULCHED ACCORDING TO THE PROJECT SPECIFICATIONS.
4) CONTRACTOR SHALL ENSURE THE SPOIL AREAS LOCATED IN BETWEEN THE CHANNEL RIGHT TOP BANK AND FLOOD SIDE LEVEE TOE THAT RECEIVE
BE PLACED AS SEMI-COMPACTED BACKFILL AS SPECIFIED IN THE PROJECT SPECIFICATIONS.
RIGHT TOP BANK AND FLOOD SIDE LEVEE TOE SHALL NOT EXCEED A MAXIMUM FINAL THICKNESS OF 1'. THIS EXCAVATED MATERIAL SHALL ALSO
3) THE EXCAVATED MATERIAL OBTAINED FROM THE KEY CONSTRUCTION THAT IS PLACED IN THE SPOIL AREAS LOCATED IN BETWEEN THE CHANNEL
EXCAVATED MATERIAL OBTAINED FROM THE KEY CONSTRUCTION WHEN PLACED IN THE SPOIL AREAS SHALL BE NO STEEPER THAN 5H:1V.
IN THE SPOIL AREAS SHALL BE DETERMINED IN THE FIELD BY THE CONTRACTING OFFICER. HOWEVER THE MAX ALLOWABLE FINAL SLOPE OF THE
THE CHANNEL RIGHT TOP BANK FOR THE DURATION OF THE PROJECT. THE SPECIFIC GRADE OF THE EXCAVATED MATERIAL WHEN IT IS PLACED
LOCATED IN BETWEEN THE CHANNEL RIGHT TOP BANK AND FLOOD SIDE LEVEE TOE IS SLOPED TO DRAIN AWAY FROM THE LEVEE AND TOWARDS
2) CONTRACTOR SHALL ENSURE THAT THE EXCAVATED MATERIAL OBTAINED FROM THE KEY CONSTRUCTION THAT IS PLACED IN THE SPOIL AREAS
SCOUR REPAIR SITES. THE APPROXIMATE LEVEE BASELINE STATION LIMITS FOR EACH OF THE SCOUR REPAIR SITES CAN BE FOUND ON SHEET G-002.
BE TRANSITIONED DOWN TO ITS FULL DEPTH FROM EXISTING GRADE AT THE START AND END LEVEE BASELINE STATION LIMITS FOR EACH OF THE
1) THE RIPRAP KEY SHALL BE EXCAVATED TO ITS FULL DEPTH FOR THE ENTIRE LENGTH OF EACH OF THE SCOUR REPAIR SITES. THE KEY SHALL NOT
NOTES:
BASELINE STATION LIMITS FOR EACH OF THE SCOUR REPAIR SITES CAN BE FOUND ON SHEET G-002.
SNAGGING WITHIN THE START AND END LEVEE BASELINE STATION LIMITS FOR EACH OF THE SCOUR REPAIR SITES. THE APPROXIMATE LEVEE
SITE. UNLESS OTHERWISE DIRECTED BY THE CONTRACTING OFFICER THE CONTRACTOR SHALL ONLY BE REQUIRED TO PERFORM GRUBBING &
7) THE CONTRACTOR SHALL PERFORM GRUBBING & SNAGGING WITHIN THE LIMITS SHOWN IN THE TYPICAL CROSS SECTIONS AT EACH SCOUR REPAIR
SURFACE ELEVATION AT THE TIME OF CONSTRUCTION. STAGE HYDROGRAPHS ARE PROVIDED ON SHEET X-100.
SEA 1600801 SURVEY WAS COMPLETED AND IS SHOWN FOR REFERENCE ONLY AND SHOULD NOT BE USED TO DETERMINE OR ANTICIPATE THE WATER
6) THE WATER SURFACE ELEVATION SHOWN IN THE TYPICAL CROSS SECTIONS WAS THE WATER SURFACE ELEVATION AT THE TIME WHEN THE 2017
DURING THE PROJECT.
TYPICAL CROSS SECTIONS ARE BEING PROVIDED IN ORDER TO SHOW DIFFERENT EXISTING GRADE SCENARIOS THAT THE CONTRACTOR MAY SEE
5) THE TYPICAL CROSS SECTIONS PROVIDED SHOW THE SAME CONSTRUCTION REQUIREMENTS FOR REPAIRING ALL OF THE SCOUR SITES. TWO
EXCAVATED MATERIAL OBTAINED FROM THE KEY CONSTRUCTION IS SEEDED & MULCHED ACCORDING TO THE PROJECT SPECIFICATIONS.
4) CONTRACTOR SHALL ENSURE THE SPOIL AREAS LOCATED IN BETWEEN THE CHANNEL RIGHT TOP BANK AND FLOOD SIDE LEVEE TOE THAT RECEIVE
BE PLACED AS SEMI-COMPACTED BACKFILL AS SPECIFIED IN THE PROJECT SPECIFICATIONS.
RIGHT TOP BANK AND FLOOD SIDE LEVEE TOE SHALL NOT EXCEED A MAXIMUM FINAL THICKNESS OF 1'. THIS EXCAVATED MATERIAL SHALL ALSO
3) THE EXCAVATED MATERIAL OBTAINED FROM THE KEY CONSTRUCTION THAT IS PLACED IN THE SPOIL AREAS LOCATED IN BETWEEN THE CHANNEL
EXCAVATED MATERIAL OBTAINED FROM THE KEY CONSTRUCTION WHEN PLACED IN THE SPOIL AREAS SHALL BE NO STEEPER THAN 5H:1V.
IN THE SPOIL AREAS SHALL BE DETERMINED IN THE FIELD BY THE CONTRACTING OFFICER. HOWEVER THE MAX ALLOWABLE FINAL SLOPE OF THE
THE CHANNEL RIGHT TOP BANK FOR THE DURATION OF THE PROJECT. THE SPECIFIC GRADE OF THE EXCAVATED MATERIAL WHEN IT IS PLACED
LOCATED IN BETWEEN THE CHANNEL RIGHT TOP BANK AND FLOOD SIDE LEVEE TOE IS SLOPED TO DRAIN AWAY FROM THE LEVEE AND TOWARDS
2) CONTRACTOR SHALL ENSURE THAT THE EXCAVATED MATERIAL OBTAINED FROM THE KEY CONSTRUCTION THAT IS PLACED IN THE SPOIL AREAS
SCOUR REPAIR SITES. THE APPROXIMATE LEVEE BASELINE STATION LIMITS FOR EACH OF THE SCOUR REPAIR SITES CAN BE FOUND ON SHEET G-002.
BE TRANSITIONED DOWN TO ITS FULL DEPTH FROM EXISTING GRADE AT THE START AND END LEVEE BASELINE STATION LIMITS FOR EACH OF THE
1) THE RIPRAP KEY SHALL BE EXCAVATED TO ITS FULL DEPTH FOR THE ENTIRE LENGTH OF EACH OF THE SCOUR REPAIR SITES. THE KEY SHALL NOT
NOTES:
GRUBBING & SNAGGING LIMITS
GRUB & SNAG 15' PAST RTB
GRUB & SNAG 15' PAST RTB
OF BY OTHERS AT A LATER DATE.
LIMITS. THE DEBRIS SHALL THEN BE DISPOSED
LEVEE SLOPES WITHIN THE CONSTRUCTION ROW
STOCKPILES LOCATED ALONG THE FLOOD SIDE
SNAGGING DEBRIS IN THE EXISTING DEBRIS
CONTRACTOR SHALL PLACE ALL GRUBBING &
OF BY OTHERS AT A LATER DATE.
LIMITS. THE DEBRIS SHALL THEN BE DISPOSED
LEVEE SLOPES WITHIN THE CONSTRUCTION ROW
STOCKPILES LOCATED ALONG THE FLOOD SIDE
SNAGGING DEBRIS IN THE EXISTING DEBRIS
CONTRACTOR SHALL PLACE ALL GRUBBING & LEVEE TOE
FLOOD SIDE
B
A
FOR SOLICITATION - AMENDMENT 01
| West Basin Phase 2 C-300 |
| References |
| _AEC ANSI D Border, PW_WORKDIR:d0120411 |
| West Basin Phase 2 border.dgn |
| Ref-2, PW_WORKDIR:d0120411 |
| West Basin Phase 2 master.dgn, Plan |
File details come from the government source that posted it.