WB_Specifications_13Jul18.pdf
PDF 1021 KB Posted
- Attached to
- West Basin Scour Repair Phase 2 Federal contract opportunity
- Solicitation number
- W912EQ18B0008
About this file
Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912EQ18B0008-ABSTRACT_(Autosaved).pdf | ||
| 18B0008_Amendment_2.pdf | ||
| 31_11_00.00_11_-_Amendment_01.pdf | ||
| 18B0008_Amendment_1_.pdf | ||
| Amendment_1_Bid_Schedule.pdf | ||
| Plan_Sheet_C-300_-_Amendment_01.pdf | ||
| 01_22_00.00_11_-_Amendment_01.pdf | ||
| A07D_IFB_16Jul18.pdf | ||
| West_Basin_Scour_Repairs_Phase_2_Plans_-_For_Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
West Basin Scour Repairs Levee B/L Sta. 705+54 to B/L Sta. 570+81
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00.00 11 SUMMARY OF WORK
01 22 00.00 11 MEASUREMENT AND PAYMENT
01 33 00 SUBMITTAL PROCEDURES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 45 04.00 11 CONTRACTOR QUALITY CONTROL
01 57 20.00 11 ENVIRONMENTAL PROTECTION
01 57 25.00 11 STORM WATER POLLUTION PREVENTION PLAN
01 58 01.00 11 PROJECT SIGN, BARRICADES, AND TRAFFIC CONTROL SIGNS
01 78 00.00 11 CLOSEOUT SUBMITTALS
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 92 35.00 13 SEEDING AND MULCHING - SOUTHEAST MO (LRDD)
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 31 19.00 11 STONE PROTECTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
FOR SOLICITATION
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00.00 11
SUMMARY OF WORK
1/10/08
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
1.1.2 Location
1.2 EXISTING WORK
1.3 LOCATION OF UNDERGROUND FACILITIES
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section Table of Contents --
SECTION 01 11 00.00 11 Page 1
SECTION 01 11 00.00 11
SUMMARY OF WORK
1/10/08
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
The work consists of furnishing all plant, labor, and materials and any incidental related work according to the plans and specifications for repairing 4 scour site locations that have occurred along the right bank of the West Basin Levee - Headwater Diversion Channel between Levee B/L Sta.
705+54 and B/L Sta. 570+81. The project is located within the Little River Drainage District in Cape Girardeau County, Missouri. The estimated value of the work is between $5,000,000 and $10,000,000.
1.1.2 Location
The work shall be located at Cape Girardeau County, Missouri along the West Basin Levee. The exact location will be indicated on the contract drawings. The Contracting Officer's Representative will be available to show the exact location of the work at the two organized site visits.
1.2 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.3 LOCATION OF UNDERGROUND FACILITIES
Verify the elevations of existing piping, utilities, and any type of underground obstruction not indicated as to be installed or removed by the Contractor, including piping, utilities, or other underground obstruction discovered during the work. For further instructions and details, see the paragraph entitled, "OBSTRUCTIONS" in Section 00 72 00 GENERAL CONDITIONS.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section --
SECTION 01 11 00.00 11 Page 2
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 11
MEASUREMENT AND PAYMENT
1/10/08
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
1.1.1 Mobilization and Demobilization
1.1.2 Environmental Protection
1.1.3 Write/Amend and Maintain SWPPP
1.2 UNIT PRICE PAYMENT ITEMS
1.2.1 Storm Water Pollution Prevention
1.2.1.1 Silt Fence or Equivalent
1.2.1.2 Erosion Control Berm or Equivalent
1.2.2 Riprap, R-400
1.2.3 Semi-Compacted Backfill
1.2.4 Seeding & Mulching
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section Table of Contents --
SECTION 01 22 00.00 11 Page 1
SECTION 01 22 00.00 11
MEASUREMENT AND PAYMENT
1/10/08
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract job payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, shall be included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1.1 Mobilization and Demobilization
a. Payment
Payment will be made for costs associated with mobilization and demobilization, as defined in Contract Clauses PAYMENT FOR MOBILIZATION
AND DEMOBILIZATION.
b. Unit of measure, Job: JA
1.1.2 Environmental Protection
a. Measurement
No measurement will be made for Environmental Protection.
b. Payment
Payment will be made for costs associated with operations necessary for environmental protection as specified in Section 01 57 20.00 11 ENVIRONMENTAL PROTECTION. This price and payment shall be considered full compensation for furnishing all plant, labor, materials, and equipment and for performing all operations necessary for "Environmental Protection." This price and payment does not include those items covered under "Storm Water Pollution Prevention;" however, it does include items incidental thereto. The Contractor shall be responsible for payment of fees associated with environmental permits, application, and/or notices obtained by the Contractor. The Contractor shall be responsible for payment of all fines/fees arriving from violation or non-compliance with Federal, State, Regional, and local laws or regulations. The Government will not provide any compensation for payments of fines/fees, in the event that fines/fees are incurred by the Contractor.
SECTION 01 22 00.00 11 Page 2
c. Unit of measure, Job: JA
1.1.3 Write/Amend and Maintain SWPPP
a. Measurement
No measurement will be made for Write/Amend and Maintain SWPPP.
b. Payment
Payment for Write/Amend and Maintain SWPPP will be made at the contract job price for "Write/Amend and Maintain SWPPP". Price and payment shall constitute full compensation for Contractor creation, according to Section 01 57 25.00 11 STORM WATER POLLUTION PREVENTION PLAN, and submittal of the SWPPP to the US Army Corps of Engineers for approval, updating and maintaining of the project SWPPP throughout the duration of the project, conducting stormwater inspections, submitting appropriate reports to the Contracting Officer, and all other operations incidental thereto for the duration of the construction project.
c. Unit of measure, Job: JA
1.2 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this contract on which the contract progress payments will be based are listed in Section 00 41 00.00 11 - BIDDING SCHEDULE and are described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests, and reports, and for performing all work required for each of the unit price items.
1.2.1 Storm Water Pollution Prevention
No separate measurement or payment will be made for the work "Storm Water Pollution Prevention" required by Section 01 57 25.00 11 STORM WATER POLLUTION PREVENTION PLAN except as described in the paragraphs SILT FENCE OR EQUIVALENT and EROSION CONTROL BERM OR EQUIVALENT below. Any additional costs associated with Storm Water Pollution Prevention, other than these listed, shall be included in the contract price under Environmental Protection. The Government will pay all costs for the "Storm Water Pollution Prevention" at the contract unit price for each sub-item list below as follows:
(1) Sixty percent of the unit price upon completion of the installation.
(2) The remaining 40 percent throughout the contract life, with a maximum of 20 percent being retained until final removal and cleanup of the premises.
The Contracting Officer will require the Contractor to furnish cost data to calculate the exact percentage to be paid upon installation.
SECTION 01 22 00.00 11 Page 3
1.2.1.1 Silt Fence or Equivalent
a. Measurement
Measurement for Silt Fence or Equivalent satisfactorily placed will be made by the linear foot.
b. Payment
Payment for Silt Fence or Equivalent installed as specified in Section 01 57 25.00 11 STORM WATER POLLUTION PREVENTION PLAN will be made at the contract unit price per linear foot for "Silt Fence or Equivalent" as broken down by the percentages in the "sub-item list" above. Price and payment shall constitute full compensation for furnishing all plant, labor, materials and equipment, including geotextile fabric, and performing all operations necessary for the placement and maintenance of Silt Fence or Equivalent structure throughout the contract period, including final dressing and cleanup. If the Contractor elects to use erosion control berm in lieu of the silt fence that is indicated in the drawings then the erosion control berm shall be measured and payed for as specified in the measurement and payment section for "Erosion Control Berm or Equivalent". If the Contractor elects to use any other equivalent erosion control structure, other than erosion control berm, in lieu of the silt fence that is indicated in the drawings then it will be measured and payed for as silt fence.
c. Unit of measure, Linear Foot: LF.
1.2.1.2 Erosion Control Berm or Equivalent
a. Measurement
Measurement for Erosion Control Berm or Equivalent satisfactorily placed will be made by the linear foot.
b. Payment
Payment for Erosion Control Berm or Equivalent installed as specified in Section 01 57 25.00 11 STORM WATER POLLUTION PREVENTION PLAN will be made at the contract unit price per linear foot for "Erosion Control Berm or Equivalent" as broken down by the percentages in the "sub-item list" above. Price and payment shall constitute full compensation for furnishing all plant, labor, materials and equipment, and performing all operations necessary for the installation and maintenance of the Erosion Control Berm or Equivalent structure throughout the contract period, including final removal, dressing and cleanup. If the Contractor elects to use silt fence in lieu of the erosion control berm that is indicated in the drawings then the silt fence shall be measured and payed for as specified in the measurement and payment section for "Silt Fence or Equivalent". If the Contractor elects to use any other equivalent erosion control structure, other than silt fence, in lieu of the erosion control berm that is indicated in the drawings then it will be measured and payed for as erosion control berm.
c. Unit of measure, Linear Foot: LF.
1.2.2 Riprap, R-400
a. Measurement
SECTION 01 22 00.00 11 Page 4
Measurement for Riprap, R-400 shall be by the ton (2,000 pounds), measured by weighing each truckload to the nearest 1/10 ton, and the final quantity of the whole sum for Riprap, R-400 rounded to the nearest whole ton. When Riprap is delivered by truck, the material shall be measured for payment, in the presence of a Government Inspector, unless the Contracting Officer waives such right, by weighing on approved, accurately calibrated scales furnished by and at the expense of the Contractor. Scales shall be of sufficient length to permit simultaneous weighing of all axle loads and shall be inspected, tested and sealed as directed to assure accuracy within 0.5 percent throughout the range of the scales. Scales shall be checked and certified before any material hauling; also, rechecked and re-certified whenever a variance is suspected. Individual weight tickets for each truckload of Riprap, R-400 shall be furnished to the Government Inspector at the time of delivery. At a minimum, all weight tickets shall have the contract number or project name, the gross weight, the vehicle identity and empty weight, and the net load weight. Scales that produce this information printed on the weight tickets are preferred. Weight certificates furnished by a Public Weighmaster, where available, will be acceptable, when authorized by the Contracting Officer. The Contractor has the option to use certified, and otherwise acceptable, scales that are Contractor furnished, quarry/supplier furnished, or commercial/public facilities.
b. Payment
Payment for Riprap, R-400 will be made at the contract unit price per ton for "Riprap, R-400," which price and payment shall include all costs of furnishing, hauling, handling, placing and maintaining the Riprap, R-400, as specified in SECTION 35 31 19.00 11 STONE PROTECTION. Excavation for the placement of riprap shall be considered incidental to this item of work.
c. Unit of measure, Ton: TN.
1.2.3 Semi-Compacted Backfill
a. Measurement
Measurement for Semi-Compacted Backfill shall be as specified in Section 00 80 00.00 11 SPECIAL CONTRACT REQUIREMENTS, in the paragraph entitled QUANTITY SURVEYS. The basis for the measurement will be cross sections of the existing areas to be filled, overlaid by the theoretical sections of the completed backfill constructed within the specified tolerance. The cubic yardage to be paid for will be determined by the average end area method between the cross sections of the existing areas to be filled and the theoretical cross sections of the completed backfill constructed. Backfill not constructed to specified grade and section including allowable tolerance as indicated on the Contractor's compliance survey will not be accepted. No allowance or payment will be made for backfill material placed outside the required theoretical grade and section. Unless otherwise approved by the Contracting Officer, the Contractor is to use on-site material obtained from the required excavations as backfill material. Placement of semi-compacted backfill shall be in accordance with paragraph "SEMI-COMPACTED BACKFILL" in SECTION 31 00 00 EARTHWORK.
b. Payment
SECTION 01 22 00.00 11 Page 5
Payment for Semi-Compacted Backfill will be made at the contract unit price per cubic yard for "Semi-Compacted Backfill," which price and payment shall constitute full compensation for furnishing all equipment and performing all labor for processing, placement and compaction of fill material as specified in SECTION 31 00 00 EARTHWORK and all other operations incidental thereto including, but not limited to disposal of excavated material not used as backfill.
c. Unit of measure, Cubic Yard: CY.
1.2.4 Seeding & Mulching
a. Measurement
Measurement for Seeding & Mulching shall be by the acre, measured along the slopes of the areas seeded within the right-of-way limits and computed to the nearest 1/10 of an acre for the satisfactorily completed and accepted work. Measurement for Seeding & Mulching shall be limited to those areas specified in the drawings or indicated in the field by the Contracting Officer.
b. Payment
Payment for Seeding & Mulching will be made at the contract unit price per acre for "Seeding & Mulching," which price and payment shall constitute full compensation for furnishing all plant, labor, equipment, materials, and performing all operations necessary for Seeding & Mulching as specified in SECTION 32 92 35.00 13 SEEDING AND MULCHING - SOUTHEAST MO (LRDD). No payment for seeding & mulching will be made until acceptance by the Contracting Officer or his/her representative.
c. Unit of measure, Acre: AC.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section --
SECTION 01 22 00.00 11 Page 6
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 33 00
SUBMITTAL PROCEDURES
11/25/08
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal
1.1.2 Submittal Descriptions (SD)
1.1.3 Approving Authority
1.1.4 Work
1.2 SUBMITTALS
1.3 SUBMITTAL REGISTER
1.4 CONTRACTOR USE OF SUBMITTAL REGISTER
1.5 APPROVING AUTHORITY USE OF SUBMITTAL REGISTER
1.6 COPIES DELIVERED TO THE GOVERNMENT
1.7 PROCEDURES FOR SUBMITTALS
1.7.1 Reviewing, Certifying, Approving Authority
1.7.2 Constraints
1.7.3 Scheduling
1.7.4 Variations
1.8 CONTRACTOR'S RESPONSIBILITIES
1.9 FORMAT OF SUBMITTALS
1.9.1 Transmittal Sheet
1.9.2 Identifying Submittals
1.10 SUBMISSION AND CONTROL OF SUBMITTALS
1.10.1 Submittals Required from the Contractor
1.10.1.1 Submittal Procedures and Deviations
1.10.1.2 Control of Submittals
1.10.1.3 O&M Data
1.11 SUBMITTAL CLASSIFICATION
1.11.1 Government Approved
1.11.2 Information Only
1.12 APPROVED SUBMITTALS
1.13 DISAPPROVED SUBMITTALS
1.14 GENERAL
1.15 SUBMITTAL REGISTER
1.16 SCHEDULING
1.17 TRANSMITTAL SHEET (ENG FORM 4025)
1.18 GOVERNMENT APPROVED SUBMITTALS
1.19 INFORMATION ONLY SUBMITTALS
1.20 STAMPS
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section Table of Contents --
SECTION 01 33 00 Page 1
SECTION 01 33 00 Page 2
SECTION 01 33 00
SUBMITTAL PROCEDURES
11/25/08
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal
Contract Clauses "FAR 52.236-5, Material and Workmanship," paragraph (b) and "FAR 52.236-21, Specifications and Drawings for Construction," paragraphs (d), (e), and (f) apply to all "submittals."
1.1.2 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections.
Submittals are identified by SD numbers and titles as follows.
SD-01 Preconstruction Submittals
Certificates of Insurance.
Surety Bonds.
Construction Progress Schedule.
Work Plan.
Submittal Register.
Schedule of Prices.
Accident Prevention Program.
Quality Control Plan.
Environmental Protection Plan.
List of Proposed Subcontractors.
List of Proposed Products.
List of Barges.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-04 Samples
Physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.
Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
SECTION 01 33 00 Page 3
Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.
SD-05 Design Data
Calculations, mix designs, analyses or other data pertaining to a part of work.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accordance with specified requirements. (Testing must have been within three years of date of contract award for the project.)
Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports.
Daily checklists.
Final acceptance test and operational test procedure.
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a supplier, installer or subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.
Confined space entry permits.
Text of posted operating instructions.
SD-08 Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and Material Safety Data sheets concerning impedances, hazards and safety precautions.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative
SECTION 01 33 00 Page 4 requirements or to establish an administrative mechanism.
1.1.3 Approving Authority
Approving authority rests with the Contracting Officer and his/her Authorized Representative(s). Approval actions and correspondence with the Contractor shall be made through the Caruthersville Area Office.
1.1.4 Work
As used in this section, on-site and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Submittal register.; G
1.3 SUBMITTAL REGISTER
Submit the submittal register at least seven days prior to the prework conference. Verify that all submittals required for the project are listed and add any missing submittals. Complete the following on the register:
Column (g) Contractor Submit Date: Scheduled date for approving authority to receive submittals.
Column (h) Contractor Approval Date: Date Contractor needs approval of submittal.
1.4 CONTRACTOR USE OF SUBMITTAL REGISTER
Update the following fields.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (j) Action Code (k): Date of action used to record Contractor's review when forwarding submittals to Area Engineer.
Column (l) List date of submittal transmission.
Column (q) List date approval received.
1.5 APPROVING AUTHORITY USE OF SUBMITTAL REGISTER
Update the following fields.
Column (b).
SECTION 01 33 00 Page 5
Column (l) List date of submittal receipt.
Column (m) through (p).
Column (q) List date returned to Contractor.
1.6 COPIES DELIVERED TO THE GOVERNMENT
Deliver one copy of submittal register updated by Contractor to Government with each invoice request.
1.7 PROCEDURES FOR SUBMITTALS
1.7.1 Reviewing, Certifying, Approving Authority
The Contractor Quality Control (CQC) organization shall be responsible for reviewing and certifying that submittals are in compliance with contract requirements. Approving authority on submittals ultimately rests with the Contracting Officer, and his/her Authorized Representative(s). Approval of all submittals will be made through the Caruthersville Area Office.
1.7.2 Constraints
a. Submittals listed or specified in this contract shall conform to provisions of this section, unless explicitly stated otherwise.
b. Submittals shall be complete for each definable feature of work;
components of definable feature interrelated as a system shall be submitted at same time.
c. When acceptability of a submittal is dependent on conditions, items, or materials included in separate subsequent submittals, submittal will be returned without review.
d. Approval of a separate material, product, or component does not imply approval of assembly in which item functions.
1.7.3 Scheduling
a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential requirements to resubmit.
b. Except as specified otherwise, allow review period, beginning with receipt by approving authority, that includes at least 15 working days for submittals for Contracting Officer's Authorized Representative approval and 20 working days for submittals for Contracting Officer approval. Period of review for submittals with Contracting Officer approval begins when Government receives submittal from CQC organization. Period of review for each resubmittal is the same as for initial submittal.
1.7.4 Variations
Variations from contract requirements require Government approval pursuant to contract Clause entitled "FAR 52.236-21, Specifications and Drawings for Construction" and will be considered where advantageous to the Government.
SECTION 01 33 00 Page 6
Discussion with the Caruthersville Area Office prior to submission, will help ensure functional and quality requirements are met and minimize rejections and resumbittals.
1.8 CONTRACTOR'S RESPONSIBILITIES
a. Determine and verify field measurements, materials, field construction criteria; review each submittal; and check and coordinate each submittal with requirements of the work and contract documents.
b. Transmit submittals to the Government in accordance with the approved Submittal Register. To prevent delays in the work, delays to Government, or delays to separate Contractors transmit submittals using ENG FORM 4025 (Transmittal Sheet).
c. Stamp submittal data to certify that the submittal meets contract requirements.
d. Advise Contracting Officer of variation, as required by paragraph entitled "Variations."
e. Correct and resubmit submittal as directed by approving authority. When resubmitting disapproved transmittals or transmittals noted for resubmittal, the Contractor shall provide copy of that previously submitted transmittal including all reviewer comments for use by approving authority. Direct specific attention in writing or on resubmitted submittal, to revisions not requested by approving authority on previous submissions.
f. Furnish additional copies of submittal when requested by Contracting Officer, to a limit of 20 copies per submittal.
g. Ensure no work has begun until submittals for that work have been returned as "Approved as submitted" or "Approved, except as noted...", except that the Contractor can complete the those portions of said work that remain unchanged and will not require a submittal approval.
1.9 FORMAT OF SUBMITTALS
1.9.1 Transmittal Sheet
Transmit each submittal, except sample installations and sample panels, to office of approving authority. Transmit submittals on ENG FORM 4025 (Transmittal Sheet) located at the following website:
http://www.mvm.usace.army.mil/BusinessWithUs/Contracting/Forms.aspx. The transmittal sheet shall identify Contractor, indicate date of submittal, and include information prescribed by transmittal sheet and required in paragraph entitled "Identifying Submittals." Process transmittal sheets to record actions regarding sample panels and sample installations.
1.9.2 Identifying Submittals
Identify submittals, except sample panel and sample installation, with the following information permanently adhered to or noted on each separate component of each submittal and noted on transmittal sheet. Mark each copy of each submittal identically, with the following:
SECTION 01 33 00 Page 7
a. Project title and location.
b. Construction contract number.
c. Section number of the specification section by which submittal is required.
d. Submittal description (SD) number of each component of submittal.
e. When a resubmission, add alphabetic suffix on submittal description, for example, SD-10A, to indicate resubmission.
f. Name, address, and telephone number of subcontractor, supplier, manufacturer and any other second tier Contractor associated with submittal.
g. Product identification and location in project.
1.10 SUBMISSION AND CONTROL OF SUBMITTALS
1.10.1 Submittals Required from the Contractor
Within 15 calendar days after receipt of notice to proceed, the Contractor shall complete and submit to Mr. Jack Ratliff, Caruthersville Area Office, 706 Harry S. Truman Blvd., Caruthersville, Missouri 63830-1268, submittals required in the technical sections of this specification, including shop drawings, product data and samples.
1.10.1.1 Submittal Procedures and Deviations
The Government will further discuss detailed submittal procedures with the Contractor at the Preconstruction Conference. For submittals which include proposed deviations requested by the Contractor, the column "variation" of ENG Form 4025 shall be checked. The Contractor shall set forth in writing the reason for any deviations and annotate such deviations on the submittal. The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.
1.10.1.2 Control of Submittals
The Contractor shall carefully control his procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."
1.10.1.3 O&M Data
Contracting Officer will review and approve the O&M Data to verify the submittals comply with the contract requirements; submit data specified for a given item within 30 calendar days after the item is delivered to the contract site. In the event the Contractor fails to deliver O&M Data within the time limits specified, the Contracting Officer may withhold from progress payments up to 10 percent of the price of the item with which such O&M Data are applicable.
1.11 SUBMITTAL CLASSIFICATION
Submittals are classified as follows:
SECTION 01 33 00 Page 8
1.11.1 Government Approved
Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer.
Within the terms of the Contract Clause entitled "Specifications and Drawings for Construction," they are considered to be "shop drawings."
1.11.2 Information Only
All submittals not requiring Government approval will be for information only. They are not considered to be "shop drawings" within the terms of the Contract Clause referred to above.
1.12 APPROVED SUBMITTALS
The Contracting Officer's approval of submittals shall not be construed as a complete check, but will indicate only that the general method of construction, materials, detailing and other information are satisfactory.
Approval will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the CQC requirements of this contract is responsible for design, dimensions, all design extensions, such as the design of adequate connections and details, etc., and the satisfactory construction of all work. After submittals have been approved by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.
1.13 DISAPPROVED SUBMITTALS
The Contractor shall make all corrections required by the Contracting Officer and promptly furnish a corrected submittal in the form and number of copies specified for the initial submittal.
1.14 GENERAL
The Contractor shall make submittals as required by the specifications.
The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Units of weights and measures used on all submittals shall be the same as those used in the contract drawings. Each submittal shall be complete and in sufficient detail to allow ready determination of compliance with contract requirements. Prior to submittal, all items shall be checked and approved by the CQC System Manager and each item shall be stamped, signed, and dated by the CQC System Manager indicating action taken. Proposed deviations from the contract requirements shall be clearly identified. Submittals shall include items such as: Contractor's, manufacturer's, or fabricator's drawings;
descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders;
samples; O&M manuals (including parts list); certifications; warranties;
and other such required submittals. Submittals requiring Government approval shall be scheduled and made prior to the acquisition of the material or equipment covered thereby. Samples remaining upon completion of the work shall be picked up and disposed of in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.
SECTION 01 33 00 Page 9
1.15 SUBMITTAL REGISTER
At the end of this section is a submittal register showing items of equipment and materials for which submittals are required by the specifications; this list may not be all inclusive and additional submittals may be required. The Government will provide the initial submittal register in electronic format. Thereafter, the Contractor shall maintain a complete list of all submittals, including completion of all data columns. Dates on which submittals are received and returned by the Government will be tracked. The Contractor shall monitor the progress of all submittals.
1.16 SCHEDULING
Submittals covering component items forming a system or items that are interrelated shall be scheduled to be coordinated and submitted concurrently. Certifications to be submitted with the pertinent drawings shall be so scheduled. Adequate time (a minimum of 21 calendar days exclusive of mailing time) shall be allowed and shown on the register for review and approval. No delay damages or time extensions will be allowed for time lost in late submittals.
1.17 TRANSMITTAL SHEET (ENG FORM 4025)
A sample transmittal sheet (ENG Form 4025), which can be found at http://www.mvm.usace.army.mil/BusinessWithUs/Contracting/Forms.aspx shall be used for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. Additionally, these forms are included in the QCS software that is available for Contractor use. The transmittal sheet shall be properly completed by filling out all the heading blank spaces and identifying each item submitted. Special care shall be exercised to ensure proper listing of the specification paragraph and/or sheet number of the contract drawings pertinent to the data submitted for each item.
1.18 GOVERNMENT APPROVED SUBMITTALS
Upon completion of review of submittals requiring Government approval, the submittals will be identified as having received approval by being so stamped and dated. Three copies of the submittal will be retained by the Contracting Officer and three copies of the submittal will be returned to the Contractor.
1.19 INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Contracting Officer is not required on information only submittals.
The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work;
and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.
SECTION 01 33 00 Page 10
1.20 STAMPS
Stamps used by the Contractor on the submittal data to certify that the submittal meets contract requirements shall be similar to the following:
SECTION 01 33 00 Page 11
| CONTRACTOR |
| (Firm Name) | | _____ Approved | | _____ Approved with corrections as noted on submittal data and/or | | attached sheets(s). |
| SIGNATURE: __________________________________________________________ |
| TITLE: ______________________________________________________________ |
| DATE: _______________________________________________________________ |
Stamps used by the Contracting Officer's Authorized Representative on the submittal data to certify that the submittal meets contract requirements shall be similar to the following:
| I hereby certify that the (equipment)(material)(article)shown | | and marked in this submittal is that proposed to be incorporated | | with contract No. W912EQ-__-C-____, is in compliance with the | | contract drawings and specification, can be installed in the | | allocated spaces, and is submitted for Contracting Officer approval. | | Certified by Submittal Reviewer ____________________, Date _______ | | (Signature when applicable) | | Certified by Area Engineer _________________________, Date ______ | | (Signature) |
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section --
SECTION 01 33 00 Page 12
TR
A
N
SM
IT
TA
L O
F
SH
O P
D R
A W
IN
G
S, E
Q U
IP
M
EN
T
D A
TA
, M
A
TE
R
IA
L
SA
M
PL
ES
, O
R M
A N
U
FA
C
TU
R
ER
'S C
ER
TI
FI
C
A
TE
S O
F C
O M
PL
IA
N C
E (R ea d in st ru ct io ns o n th e re ve rs e si de p rio r t o in itia tin g th is fo rm
D A
TE
TR
A N
S M
IT
TA
L N
O
SE
C
TI
O
N I
- R
EQ
U
ES
T
FO
R A
PP
R
O
VA
L O
F
TH
E
FO
LL
O
W
IN
G
IT
EM
S
(T hi s se ct io n w ill be in iti at ed b y th e co nt ra ct or
TO
FR
O
M
C O
N
TR
A C
T N
O
C H
E C
K O
N E
TH
IS
IS
A N
E W
T R
A N
S M
IT
TA
L
TH
IS
IS
A R
E S
U B
M
IT
TA
L
O F
TR
A
N S
M
IT
TA
L
S P
E C
IF
IC
A
TI
O N
S E
C
N O
(C ov er o nl y on e se ct io n w ith ea ch tr an sm itt al
P
R O
JE
C
T
TI
TL
E
A N
D L
O C
A
TI
O N
C H
E C
K O
N E
TH
IS
T
R A
N S
M
IT
TA
L
IS
FO
R
F
IO
G O
V 'T
. A
PP
R O
VA
L
IT
EM N
O a.
D
ES
C R
IP
TI
O N
O F
IT
EM
S U
BM
IT
TE
D
(T yp e si ze , m od el n um be r/e tc b.
M
FG
O R
C O
N
TR
C
AT
C U
R V
E D
R A
W
IN
G O
R B
R O
C H
U R
E N
O
(S ee in st ru ct io n no . 8 c.
N O
O
F C
O
PI
ES
d.
C O
N
TR
AC
T
R E
FE
R
E N
C E
D O
C U
M
EN
T
S P
E C
P
A R
A . N
O e.
D R
A W
IN
G
SH
EE
T N
O f.
FO
R
C O
N
TR
AC
TO
R U
S E
C O
D E g.
VA
R
IA
TI
O N
(S ee in st ru ct io n
N o.
h.
FO
R
C E
U S
E C
O D
E i.
R E
M A
R K
S I c er tif y th at t he a bo ve s ub m itt ed i te m s h av e b ee n re vi ew ed in d et ai l an d a re c or re ct a nd i n s tri ct c on fo rm an ce w ith th e c on tra ct d ra w in gs a nd s pe ci fic at io ns e xc ep t as o th er w is e s ta te d.
N
AM
E A
N D
S
IG
N A
TU
R
E O
F C
O N
TR
A
C
TO
R
SE
C
TI
O
N
II
A
PP
R
O
VA
L A
C
TI
O N
E N
C
LO
S U
R E
S R
E
TU
R N
E D
(L is t b y
Ite m
N o.
N
A M
E , T
IT
LE
A N
D S
IG
N
A
TU
R E
O F
A P
P R
O V
IN
G
A U
TH
O
R
IT
Y D
A
TE
EN
G
F O
R M
5- R
, M A
R
ED
IT
IO
N O
F S
E P
IS
O
BS
O
LE
TE
S
H E
E T
O
F (P ro po ne nt
C
EM
P-
C E
(E R
5-
1-
IN
ST
R U
C
TI
O N
S
Se ct io n
I w ill b e in iti at ed b y th e C on tra ct or i n th e re qu ire d n um be r of c op ie s.
Ea ch t ra ns m itt al s ha ll b e n um be re d c on se cu tiv el y in t he s pa ce p ro vi de d fo r
"T ra ns m itt al
N o.
Th is n um be r, in a dd iti on t o th e c on tra ct n um be r, w ill fo rm a s er ia l nu m be r fo r id en tif yi ng e ac h s ub m itt al
F or n ew s ub m itt al s o r re su bm itt al s m ar k th e a pp ro pr ia te b ox on r es ub m itt al s, i ns er t tra ns m itt al n um be r of l as t su bm is si on a s w el l as t he n ew s ub m itt al n um be r.
Th e
"I te m N o.
w ill b e th e s am e "I te m
N o.
as i nd ica te d o n E
N G
F O
R M
8- R f or e ac h e nt ry o n th is f or m
Su bm itt al s re qu iri ng e xp ed iti ou s h an dl in g w ill b e s ub m itt ed o n a s ep ar at e fo rm
Se pa ra te t ra ns m itt al f or m w ill b e u se d fo r su bm itt al s u nd er s ep ar at e s ec tio ns o f th e s pe ci fic at io ns
A c he ck s ha ll b e p la ce d in t he
Va ria tio n" c ol um n w he n a s ub m itt al i s n ot i n a cc or da nc e w ith t he p la ns a nd s pe ci fic at io ns
--a ls o, a w rit te n s ta te m en t to t ha t ef fe ct s ha ll b e in cl ud ed i n th e s pa ce p ro vi de d fo r
"R em ar ks
Fo rm i s s el f-t ra ns m itt al le tte r of t ra ns m itt al i s n ot r eq ui re d.
W he n a s am pl e o f m at er ia l or
M an uf ac tu re r's C er tif ic at e o f C om pl ia nc e is t ra ns m itt ed in di ca te
Sa m pl e" o r "
C er tif ic at e" in c ol um n c, S ec tio n
I.
U .S
Ar m y
C or ps o f En gi ne er s a pp ro vi ng a ut ho rit y w ill a ss ig n a ct io n c od es a s in di ca te d b el ow i n s pa ce p ro vi de d in
S ec tio n
I, c ol um n i to e ac h it em s ub m itt ed
I n ad di tio n th ey w ill e ns ur e e nc lo su re s a re i nd ic at ed a nd a tta ch ed t o th e fo rm p rio r to r et ur n to t he c on tra ct or
T he
C on tra ct or w ill a ss ig n a ct io n c od es a s in di ca te d b el ow in S ec tio n I, c ol um n g to e ac h it em s ub m itt ed
Ap pr ov al o f ite m s d oe s n ot r el ie ve t he c on tra ct or f ro m c om pl yi ng w ith a ll th e re qu ire m en ts o f th e c on ta ct p la ns a nd s pe ci fic at io ns
1. 2. 3. 4. 5. 6. 7. 8. 9. 10
TH
E
F
OL
LO
W
IN
G
A
CT
IO
N
C
OD
ES
A
RE
G
IV
EN
T O
IT
EM
S S
UB
MI
TT
ED
A B C D
Ap pr ov ed a s s ub m itt ed
Ap pr ov ed ex ce pt a s n ot ed o n d ra w in gs
Ap pr ov ed ex ce pt a s n ot ed o n d ra w in gs
R ef er t o a tta ch ed s he et r es ub m is si on r eq ui re d.
W ill b e re tu rn ed b y s ep ar at e c or re sp on de nc e.
E F FX G
D is ap pr ov ed
(S ee a tta ch ed
R ec ei pt a ck no w le dg ed
R ec ei pt a ck no w le dg ed , d oe s no t c om pl y as n ot ed w ith c on tra ct re qu ire m en ts
O th er (S pe ci fy
(R ev er se o f E
N G
F or m
5-
R
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 4 PAGES
West Basin Phase 2 ($5.5M)
00 70 00.00 11 SD-07 Certificates
1.8 GCertificate or Written Evidence of
Insurance
1.13 GField Notes and All Other
Records Relating to the Survey 00 80 00.00 11 SD-01 Preconstruction Submittals
1.8 GActivity Hazard Analysis
1.8 GAccident Prevention Program
1.8 GHazard Communication Program
1.29 GList of all Personnel, Vehicles
and Equipment SD-02 Shop Drawings
1.11Shop Drawings SD-03 Product Data
1.8Material Safety Data Sheets of Each Substance
SD-05 Design Data G CAOPre-Construction Surveys;
1.6 G CAOPost-Construction Surveys;
SD-11 Closeout Submittals
G EC-DFinal As-Built Drawings 1.8Findings of the Accident
Investigation 01 45 04.00 11 SD-01 Preconstruction Submittals
3.2 G EC-CContractor Quality Control (CQC)
Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 4 PAGES
01 57 20.00 11 SD-01 Preconstruction Submittals
1.6 G CAOEnvironmental Protection Plan
01 57 25.00 11 SD-01 Preconstruction Submittals GStorm Water Pollution Prevention
Plan (SWPPP) SD-05 Design Data
2.8 GConstruction Vehicle Wash-Down
Rack
SD-07 Certificates
3.2.2.1 GMill Certificate or Affidavit
2.14 GStormwater Certificate of
Qualifications 01 78 00.00 11 SD-03 Product Data
Warranty Management Plan Warranty Tags
SD-08 Manufacturer’s Instructions Instructions
SD-11 Closeout Submittals G EC-D35 Percent As-Built Drawings G EC-D100 Percent As-Built Drawings
3.3 G EC-DRecord As-Built Drawings
3.6As-Built Record of Equipment and Materials 3.4Final Approved Shop Drawings 3.5Construction Contract
Specifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 4 PAGES
01 78 00.00 11 3.9 G CAOInterim DD FORM 1354
3.9 G CAOChecklist for DD FORM 1354
31 00 00 SD-06 Test Reports GA Record Of All Classification
Testing Gradation
GStandard Laboratory Density Tests
GResults Of Field Density And Water Content Testing
Laboratory Density Tests 32 92 35.00 13 SD-03 Product Data
2.2.1Seed Invoices G CAONative Grass Seeding Equipment
SD-04 Samples Mulch Material
3.4.1 G CAOAlternate Seeding Mixture
SD-07 Certificates
2.2.1AMS Seed Act Certification 2.1.2Mulch Supplier Certification
35 31 19.00 11 SD-03 Product Data GRiprap GBedding Material
Conveying and Placing Gaging Table Data
GDerrick Stone
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 4 PAGES
35 31 19.00 11 GBulk Specific Gravity of Stone and Redesign
SD-04 Samples
2.1.2 GRepresentative Sample of the
Bedding Material SD-06 Test Reports
2.2.5 GResults of the Gradation Test(s)
SD-07 Certificates
2.1.2 GCertified Test Report
2.2.2 GLaboratory
GWeigh Scale Certification GCertified Weight Scale Tickets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 42 00
SOURCES FOR REFERENCE PUBLICATIONS
07/06
PART 1 GENERAL
1.1 REFERENCES
1.2 ORDERING INFORMATION
-- End of Section Table of Contents --
SECTION 01 42 00 Page 1
SECTION 01 42 00
SOURCES FOR REFERENCE PUBLICATIONS
07/06
PART 1 GENERAL
1.1 REFERENCES
Various publications are referenced in other sections of the specifications to establish requirements for the work. These references are identified in each section by document number, date and title. The document number used in the citation is the number assigned by the standards producing organization, (e.g. ASTM B 564 Nickel Alloy Forgings). However, when the standards producing organization has not assigned a number to a document, an identifying number has been assigned for reference purposes.
1.2 ORDERING INFORMATION
The addresses of the standards publishing organizations whose documents are referenced in other sections of these specifications are listed below, and if the source of the publications is different from the address of the sponsoring organization, that information is also provided. Documents listed in the specifications with numbers which were not assigned by the standards producing organization should be ordered from the source by title rather than by number.
ASTM INTERNATIONAL (ASTM)
100 Barr Harbor Drive, P.O. Box C700 West Conshohocken, PA 19428-2959 Ph: 610-832-9500 Fax: 610-832-9555 E-mail: service@astm.org Internet: http://www.astm.org
U.S. ARMY CORPS OF ENGINEERS (USACE)
Order CRD-C DOCUMENTS from:
U.S. Army Engineer Waterways Experiment Station ATTN: Technical Report Distribution Section, Services Branch, TIC 3909 Halls Ferry Road Vicksburg, MS 39180-6199 Ph: 601-634-2664 Fax: 601-634-2388 E-mail: mtc-info@erdc.usace.army.mil Internet: http://www.wes.army.mil/SL/MTC/handbook.htm
Order Other Documents from:
USACE Publications Depot Attn: CEHEC-IM-PD 2803 52nd Avenue Hyattsville, MD 20781-1102 Ph: 301-394-0081 Fax: 301-394-0084 E-mail: pubs-army@usace.army.mil Internet:http://www.publications.usace.army.mil/Home.aspx
SECTION 01 42 00 Page 2 or http://www.hnc.usace.army.mil/Missions/Engineering/TECHINFO.aspx
U.S. DEPARTMENT OF AGRICULTURE (USDA)
Order AMS Publications from:
AGRICULTURAL MARKETING SERVICE (AMS)
Seed Regulatory and Testing Branch 801 Summit Crossing Place, Suite C Gastonia, NC 28054-2193 Ph: 704-810-8870 Fax: 704-852-4189 Internet: http://www.ams.usda.gov/lsg/seed.htm E-mail: seed.ams@usda.gov
Order Other Publications from:
U.S. Department of Agriculture, Rural Utilities Service 14th and Independence Avenue, SW, Room 4028-S Washington, DC 20250 Ph: 202-720-2791 Fax: 202-720-2166 Internet: http://www.usda.gov/rus
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
8601 Adelphi Road College Park, MD 20740-6001 Ph: 866-272-6272 Fax: 301-837-0483 Internet: http://www.archives.gov
Order documents from:
Superintendent of Documents U.S.Government Printing Office (GPO) 732 North Capitol Street, NW Washington, DC 20401 Ph: 202-512-1800 Fax: 202-512-2104 E-mail: contactcenter@gpo.gov Internet: http://www.gpoaccess.gov
-- End of Section --
SECTION 01 42 00 Page 3
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 45 00.15 10
RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
11/16
PART 1 GENERAL
1.1 REFERENCES
1.2 Contract Administration
1.2.1 Correspondence and Electronic Communications
1.2.2 Other Factors
1.3 RMS SOFTWARE
1.3.1 RMS CONTRACTOR'S MODE (CM)
1.4 SYSTEM REQUIREMENTS
1.5 RELATED INFORMATION
1.5.1 RMS User Guide
1.6 CONTRACT DATABASE
1.7 DATABASE MAINTENANCE
1.7.1 Administration
1.7.1.1 Contractor Information
1.7.1.2 Subcontractor Information
1.7.1.3 Correspondence
1.7.1.4 Equipment
1.7.1.5 Management Reporting
1.7.1.6 Request For Information (RFI)
1.7.2 Finances
1.7.2.1 Pay Activity Data
1.7.2.2 Payment Requests
1.7.3 Quality Control (QC)
1.7.3.1 Daily Contractor Quality Control (CQC) Reports.
1.7.3.2 Deficiency Tracking.
1.7.3.3 QC Requirements
1.7.3.4 Three-Phase Control Meetings
1.7.3.5 Labor and Equipment Hours
1.7.3.6 Accident/Safety Reporting
1.7.3.7 Features of Work
1.7.3.8 Hazard Analysis
1.7.4 Submittal Management
1.7.5 Schedule
1.7.6 Import/Export of Data
1.8 IMPLEMENTATION
1.9 MONTHLY COORDINATION MEETING
1.10 NOTIFICATION OF NONCOMPLIANCE
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 45 00.15 10 Page 1
SECTION 01 45 00.15 10 Page 2
SECTION 01 45 00.15 10
RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
11/16
PART 1 GENERAL
1.1 REFERENCES
The…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.