31_11_00.00_11_-_Amendment_01.pdf
PDF 544 KB Posted
- Attached to
- West Basin Scour Repair Phase 2 Federal contract opportunity
- Solicitation number
- W912EQ18B0008
About this file
31 11 00.00 11
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912EQ18B0008-ABSTRACT_(Autosaved).pdf | ||
| 18B0008_Amendment_2.pdf | ||
| 18B0008_Amendment_1_.pdf | ||
| Amendment_1_Bid_Schedule.pdf | ||
| Plan_Sheet_C-300_-_Amendment_01.pdf | ||
| 01_22_00.00_11_-_Amendment_01.pdf | ||
| A07D_IFB_16Jul18.pdf | ||
| WB_Specifications_13Jul18.pdf | ||
| West_Basin_Scour_Repairs_Phase_2_Plans_-_For_Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
West Basin Scour Repairs Levee B/L Sta. 705+54 to B/L Sta. 570+81
SECTION TABLE OF CONTENTS
DIVISION 31 - EARTHWORK
SECTION 31 11 00.00 11
GRUBBING AND SNAGGING
10/10/15
PART 1 GENERAL
1.1 SCOPE
1.2 SUBMITTALS (NOT USED)
1.3 DELIVERY, STORAGE, AND HANDLING (NOT USED)
1.4 QUALITY CONTROL
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 PROTECTION
3.1.1 Roads and Walks
3.1.2 Utility and Telecommunication Lines
3.2 GRUBBING
3.3 SNAGGING
3.4 DISPOSAL OF MATERIALS
-- End of Section Table of Contents --
SECTION 31 11 00.00 11 Page 1
FOR SOLICITATION - AMENDMENT 01
SECTION 31 11 00.00 11
GRUBBING AND SNAGGING
10/10/15
PART 1 GENERAL
1.1 SCOPE
The work covered by this section consists of furnishing all plant, labor, materials, equipment, and performing all work in strict accordance with the specifications and drawings in connection with this construction contract.
1.2 SUBMITTALS (NOT USED)
1.3 DELIVERY, STORAGE, AND HANDLING (NOT USED)
1.4 QUALITY CONTROL
The Contractor shall establish and maintain quality control for all grubbing and snagging operations to assure compliance with contract requirements, and shall maintain records of his quality control for all construction operations, including but not limited to the following:
(1) Limits of grubbing and snagging.
(2) Proper disposition of grubbing and snagging material.
(3) Grubbing location, limits, depths, refill of holes and compaction.
A copy of the inspection and tests, as well as the records of corrective action taken, shall be furnished the Government.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 PROTECTION
3.1.1 Roads and Walks
Keep roads and walks free of debris at all times.
3.1.2 Utility and Telecommunication Lines
Protect existing utility and telecommunication lines. Notify the Contracting Officer immediately of damage to or an encounter with an unknown existing utility or telecommunication line.
3.2 GRUBBING
Grubbing shall consist of the removal and disposal of stumps, tap roots, buried logs, and other projections which have a diameter larger than 1-1/2 inches. Material to be grubbed, together with logs and other debris not suitable for foundation purposes, shall be cut-off and removed to a depth of not less than 2 feet below the finished grade, or otherwise completely
SECTION 31 11 00.00 11 Page 2 grubbed out. Depressions made by grubbing shall be filled with suitable material and compacted to make the surface conform with the finished adjacent surface of the ground. The use of explosives for removing stumps will not be permitted. The limits for grubbing and snagging are indicated on plan sheet C-300.
3.3 SNAGGING
Prior to the commencement of the riprap key excavation and placement of riprap, all snags, stumps, and other obstructions and debris shall be removed from the grubbing and snagging limits indicated on plan sheet C-300.
3.4 DISPOSAL OF MATERIALS
Contractor shall place all grubbing & snagging debris in the existing debris stockpiles located along the flood side levee slopes within the construction Right-of-Way limits. The debris shall then be disposed of by others at a later date.