W912EK18T0025.pdf
PDF 476 KB Posted
- Solicitation number
- W912EK18T0025
About this file
Solicitation W912EK18T0025
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912EK18T0025-0002.pdf | ||
| W912EK18T0025-0001.pdf | ||
| NEW_work_plan_drawing.pdf | ||
| DEMO_plan_drawing.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912EK18T0025 06-Feb-2018
b. TELEPHONE NUMBER
309-794-5661
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 27 Feb 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912EK9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
CARISSA J MCKINLEY
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
96514773069110
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
CONTRACTING DIVISION
US ARMY CORPS OF ENGINEERS
1500 ROCK ISLAND DRIVE
ROCK ISLAND IL 61201
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 966112 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
LOCK AND DAM 14
CEMVR-OD-MV-14
US ARMY CORPS OF ENGINEERS
25549 182ND STREET
PO BOX 15
PLEASANT VALLEY IA 52767-0534
TEL: 563-332-0907 FAX:
--- --- ---- REF BLOCK 18A)FAX:
TEL: 309-794-5613 (INVOICES SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$15,000,000
NAICS:
238990
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF60
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912EK18T0025
Section SF 1449 - CONTINUATION SHEET
SCHEDULE OF PRICES
CLIN DESCRIPTION QUANTITY UNIT OF
MEASURE
TOTAL PRICE
0001 Removal of existing Halon fire suppression system; Design, Install, and test a suitable replacement Compressed CO2 system
1 JOB $
1. Delivery Date: The contractor has 14 calendar days to furnish the required submittals for
Government approval after contract award. The Government reserves the right to review/approve these submittals for a period up to 7 calendar days from the date of submission. Once approved, the Government will issue a notice to proceed. The Contractor shall begin performance within 14 calendar days and complete within 30 calendar days after receiving the notice to proceed. ACTUAL DATES WILL BE SET AT AWARD.
Location: 25549 182nd St. Pleasant Valley, IA. 52767 Attn. Daniel Guise, 309-737-4661
2. Site Visit – If perspective offerors would like to view the 727 Power Barge, contact Daniel Guise at (309) 794-4540 to request a site visit. Appointments must be made three (3) business days in advance and not interfere with ongoing operational commitments.
Appointments will only be conducted at the U.S. Army Corps of Engineers Service Base facility location listed above during the solicitation period. Times for viewing must be completed between the hours of 9:00 a.m. to 3:00 p.m., with each appointment lasting no longer than 2-hour. Transportation and associated cost to and from the viewing site must be provided by the interested bidders.
PERFORMANCE WORK STATEMENT
USACE- 727 Power Barge Performance Work Statement for installed CO2 System
Generator Room – Control Room
ANY AND ALL QUESTIONS SHALL BE ADDRESSED TO THE CONTRACT
SPECIALIST. SEE CLAUSE MVR.03 FOR CONTACT INFORMATION.
3. GENERAL
A. INTENT OF SPECIFICATIONS
1) This specification details the requirements for an engineered high pressure carbon dioxide (CO2) fire suppression system. These requirements must be followed in order to produce a safe and effective fire protection and suppression system.
2) All materials and equipment shall be new and unused. Recycled products shall not be acceptable.
B. General Description
1) The high pressure CO2 suppression system shall be a Local Application System for surface fires inside the control room electrical cabinets and Local Application System for each of the onboard generators.
2) The system hardware shall consist of one or more cylinders filled with carbon dioxide at its own nominal vapor pressure of 850 psig at 70°F (58 bar gauge at 21°C) and other related equipment. The cylinders shall be connected either directly or via a common manifold to the discharge pipe network and discharged into the affected area using discharge nozzle(s).
3) The estimated measurement for each of the areas:
a. Forward Control Room: 29 feet wide x 15 feet deep x 11 feet tall with 2 – 31 inch wide exit man doors
b. Switch Gear for all Four of the Generators: This unit is located in the control room along the main generator room wall. Unit Size: 19 feet wide x 2 feet deep x 7 feet tall (The top is open).
c. Forward Control Console: 16 feet wide x 2 feet deep x 4 inch tall
d. Main Generator Room: 29 feet wide x 31 feet deep x 11 feet tall with 2 – 31 inch doors exiting to the control room and 1- 41 inch door exiting to the Machinery Room.
e. Generators 1-4 Overall Skid Unit: 2 feet wide x 10 feet deep x 4 feet tall
4) Removal of all old Halon systems for the Control Room & Main Generator Room:
The contractor shall provide all labor, equipment, and materials needed to remove the old Halon system from the barge. These items include tanks, mounting hardware, pressure switches, pull stations, wire, signage, NAC circuits and devices, detection circuits and devices, all discharge piping, nozzles and any other equipment or material associated with these 2 rooms etc. See Attachment 2 (Power Barge Electrical Room – Demolition Plan – Drawing 1 of 2).
5) Provide: Quantity – 2 each - 100# CO2 self-standing wheeled units with 25 foot hose 20 B:C: Including cylinder, wheeled cart with foam filled rubber tires, discharge hose and nozzle, must meet Underwriters Laboratory & United States Coast Guard standards.
C. Codes And Compliance
1) The design, installation, testing and maintenance of the clean agent fire suppression system shall be in accordance with the following applicable codes, standards and regulatory bodies:
a. ANSI B1.20.1: Standard for Pipe Threads, General Purpose
b. NFPA 12: Standard for Carbon Dioxide Fire Extinguishing Systems
c. NFPA 70: National Electrical Code (NEC)
d. NFPA 72: National Fire Alarm and Signaling Code
e. Manufacturer’s Design, Installation, Operation & Maintenance Manual
f. Requirements of the Local Authority Having Jurisdiction
g. EM 385-1-1: U. S. Army Corps of Engineers Safety and Health Requirements
Manual.
h. UFC 3-600-01 Fire Protection Engineering for Facilities
2) The complete system shall have the applicable following listings and approvals prior to installation of the system. Once approved, installation of the system can be done.
a. Underwriters Laboratories (UL)
b. USCG Approval
c. Factory Mutual Global (FM)
D. Attachments
1) Power Barge Electrical Room – Demolition Plan (Drawing 1 of 2)
2) Power Barge Electrical Room – New Work Plan (Drawing 2 of 2)
E. Qualifications
1) Manufacturer
a. The manufacturer/supplier of the systems components shall be certified to ISO
9001 for the design, production and distribution of fire detection, fire alarm and fire suppression systems.
b. The manufacturer/supplier name and part number shall appear on all major components.
2) Contractor
a. The system shall be supplied and installed by a factory authorized distributor of the same manufacturer type used to complete the project install. The Contractor shall be trained by the manufacturer to calculate/design, install, test and maintain the system and shall be able to produce a certificate stating such.
b. The Contractor shall utilize a technician for this project and provide documentation which shows proficiency at least equal to a NICET (National Institute for Certification in Engineering Technologies) level III or IV certification in special hazards design.
c. The Contractor shall confirm in writing that they stock a full complement of spare parts and offer 24-hour emergency service for all equipment being furnished.
d. The Contractor shall be capable of recharging the fire suppression system within 48 hours after discharge.
4. Product/System Requirements
A. System Exclusions
1) Room sealing requirements shall be communicated and coordinated between the contractor and the Government POC.
B. Agent Concentration Requirements
1) The system shall be a local application design to suppress any potential hazards for each generator located in the generator room, switch gears for all four (4) Generators located in the electrical control room, or the forward control consul located in the electrical control room. The system shall be designed as a single discharge for only one
(1) hazard with no reserve for any other hazards.
C. System Performance
1) The system shall be designed to provide and maintain a liquid discharge, as required for Local Application Systems, for at least 30 seconds.
D. Cylinder Locations:
1) The agent cylinders shall be located in an appropriate safe area not subject to damage.
(See Power Barge Electrical Room – New Work Plan (Drawing 2 of 2).
2) Where subject to moisture, cylinders shall be installed to provide a space of 2.0 in. (~51
mm) between the floor and the bottom of the container
3) Each cylinder shall have a restraint. A single cylinder or dual cylinders may be restrained by metal straps. Multiple cylinders shall by restrained by metal frame racking. All restraints shall be supplied by the system manufacturer.
4) To facilitate annual inspection requirements, each location shall be fitted with a weigh bar arrangement supplied by the system manufacturer.
E. Cylinder Assemblies
1) The CO2 agent shall be stored at its own nominal vapor pressure of 850 psig at 70°F (58 bar gauge at 21°C).
2) The CO2 agent shall be stored in cylinders manufactured and marked in accordance with their capacities as follows:
a. 50 lbm and less: US Department of Transportation (DOT) specification 3AA-2015 and Transport Canada (TC) specification 3AAM-154
b. 75 & 100 lbm: US Department of Transportation (DOT) specification 3AA-2300 and Transport Canada (TC) specification 3AAM-176
3) The system manufacturer shall provide US DOT documentation to show that the registration number marked on the agent cylinder corresponds to a manufacturing location at a US address.
4) No cylinder shall be installed that bears a hydrostatic test date of more than one year prior to contract award.
5) All cylinders shall be provided with a steel shipping cap over the valve.
6) Cylinders with capacities of 50-lbm or less shall be factory fitted with a bent metallic siphon tube to allow either vertical or horizontal installation.
7) Cylinders with capacities greater than 50-lbm shall be factory fitted with a straight metallic siphon tube.
8) All cylinders, of a given capacity, shall be factory fitted with the same valve allowing drop-in interchangeability at any cylinder location on a manifold.
9) To enhance cylinder handling safety, the cylinder valve, while fitted with an actuator, shall be incapable of discharge when disconnected from the manifold isolation check.
F. Fire Suppression Agent
1) The Fire Suppression Agent shall be carbon dioxide
2) The agent shall comply with the following:
a. The Agent Purity in vapor phase shall be greater or equal to 99.5%.
b. The maximum Water Content in liquid phase shall be less than or equal to 0.01% by weight
c. The maximum Oil Content shall be less than or equal to 10 ppm by weight
3) The cylinders shall be filled with agent at a UL-listed first fill facility
G. Pipe and Fittings
1) Distribution piping, and fittings, shall be installed in accordance with NFPA 12, approved piping standards and the engineered fire suppression system manufacturer’s requirements.
H. Actuation Hardware
1) The primary agent cylinders shall be electrically actuated and the secondary cylinders can be actuated via manifold back pressure.
2) While in the stand-by condition, actuators attached to the cylinder valve shall not be exposed to the cylinder’s internal pressure so as to avoid introducing additional leak paths or accidental discharges.
3) For evacuation and safety purposes when protecting an occupiable space, agent discharge shall be preceded by the sounding of a Pneumatic Siren and delayed by a Pneumatic Discharge Delay.
4) The pneumatic discharge delay shall automatically reset after system discharge completes.
5) An odorizer assembly constructed of stainless steel and factory filled with oil of wintergreen must be provided.
6) Solenoid actuators shall not require replacement after each actuation.
7) The suppression release Fire Alarm Control Unit (FACU) shall be UL Listed and FM
Approved compatible with the electric actuators.
8) The FACU shall be equipped with the required devices (Relays, Contactor, etc.) to provide remote operation of Government furnished shut downs.
9) Each hazard shall be equipped with a manual pull station to actuate the flow of CO2 to each hazard.
I. Nozzles
1) Nozzles shall be of corrosion resistant construction and shall be designed specifically for carbon dioxide application.
2) Nozzles shall be spaced in the protected area to achieve uniform distribution of the agent.
3) The manufacturers’ nozzles shall be designed for efficient agent dispersion.
4) Nozzles shall be UL Listed and FM Approved for use with the agent and the manufacturer’s hardware.
J. Multi Hazard System:
1) All protected areas shall be protected by a common bank of cylinders.
2) Protected areas shall be separated by directional valves specifically listed for the purpose.
3) Directional valves shall use pilot lines internal to the valve assembly.
K. Conductors And Conduits
1) All conductors shall be enclosed in rigid or thin-walled, steel conduit unless open wiring is permitted by the local electrical code and/or the U.S. Coast Guard.
2) Any conduit or raceway exposed to dampness or other similar conditions shall be properly sealed and installed to prevent moisture entrapment. Provisions for draining and drying shall be employed as required.
3) All wiring shall be of the proper size to conduct the circuit current, but shall not be smaller than #18 AWG unless permitted by the local electrical code. Wire that has scrapes, nicks, gouges, or crushed insulation shall not be used. The manufacturer’s minimum wire-bending radii shall be observed in all enclosures, raceways, and conduits. Aluminum wire shall not be used.
5. EXECUTION
A. HP CO2 Fire Extinguishing System Installation
1) The system shall be supplied and installed by a factory-authorized Distributor. The
Distributor shall be trained and certified by the manufacturer to install and maintain the fire suppression system. The distributor shall install the system in accordance with the manufacturer’s design, installation, operation and maintenance manual.
B. Electrical System Installation
1) All electrical enclosures, raceways, and conduits shall be provided and installed in accordance with applicable codes and intended use, and shall contain only those electrical circuits associated with the fire-detection and control system. No circuit or circuits that are unrelated to the fire alarm or suppression system shall be routed through the enclosures, raceways, and conduits dedicated to the fire alarm or suppression system.
2) Splicing of circuits shall be kept to a minimum, and is only permitted in an electrical box suitable for the purpose. Appropriate hardware shall be used to make the wire splices. Wires that are spliced together shall have the same color insulation.
3) White colored wire shall be used exclusively for the identification of the neutral conductor of an alternating-current circuit. Green colored wire shall be used exclusively for the identification of the earth-ground conductor of an AC or DC circuit.
Appropriate color-coding shall be utilized for all other field wiring.
4) All electrical circuits shall be numerically tagged with suitable markings at each terminal point. All circuits shall correspond with the installation draw.
C. System Checkout
1) Entire system shall be checked out, inspected, and functionally tested by factory authorized and trained personnel in accordance with NFPA 12.
2) Inspection shall be performed in the presence of the Governments representative, engineer or architects representative, insuring authority, and/or the local AHJ (Authority Having Jurisdiction)
3) Prior to final acceptance, the contractor shall provide operational and safety training in all concepts of the system to the owners key personnel. Release of CO2 agent shall not be part of the training requirements.
D. Warranty
1) The contractor shall warranty the system equipment for 36-months from the date of customer acceptance of a fully operation system.
2) The contractor shall warranty the installation for 12-months from time of customer acceptance of a fully operational system.
E. Submittals
1) The Government will review all submittals for conformance to the drawings and specifications. The Contractor shall be required to resubmit any materials, with appropriate modifications, that are found to be in non-conformance with the requirements of the drawings and these specifications after review by the Government.
Approval of the submittals by the Government shall not relieve the Contractor of their responsibility to meet the requirements of the drawings and specifications. All submittals will be provided to the Government for review within 14 calendar days after notice to proceed is received. The Government reserves the right to review submittals for a period up to 7 calendar days from the date of submission.
2) The contractor shall submit the manufacturers’ product technical data and catalog cut sheets for each component or device used in the system.
3) The Contractor shall provide documentation, or proof of qualifications in support of
Section 8-E- (2) of this PWS.
4) Engineered Design Drawings: The Contractor’s NICET III or IV certified designer shall design the system and provide documents that shall include but are not limited to the following details:
a. Plan, elevation and isometric drawings showing the location, installation and mounting details of the agent cylinders, valves, nozzles, sirens, strobes, actuators, and other accessories.
b. Design calculations for each point of discharge volume, fire suppressant agent quantity based on required design per manufacturer’s manual for each hazard area.
c. Dimensions, weights and loads of equipment assemblies, components, method of field assembly, clearance requirements, mounting and bracing practices, etc.
d. Flow Calculation Reports showing the following:
I. Customer information and project data
II. Hazard information shall include the minimum CO2 mass, the estimated flow rate and number of nozzles.
III. Cylinder information shall include cylinder capacity, cylinder part number, cylinder quantities (both main and reserve) and floor loading per cylinder.
IV. Pipe network information shall include pipe type, pipe diameter, pipe length, change in elevation, pipe equivalent length and the equivalent length of any added accessory or fitting.
V. Nozzle information shall include the number of nozzles, flow rate per nozzle, nozzle nominal pipe size, and nozzle type and orifice code.
VI. Pipe fittings information shall include a detailed list by nominal diameter and quantity.
VII. Due to multiple hazards being protected by a common bank of cylinders, calculations showing the above details shall be completed for every hazard connected to that common bank. The individual piping for each hazard shall be separated by directional valves and shall be modeled with the valve equivalent length corresponding to the pipe size for the given hazard.
e. Any other requirements of NFPA 12 latest edition.
f. Conduit routings shall be shown, with number of conductors, type of electrical wire, and electrical wire sizes indicated for each conduit segment.
g. Point-to-point electrical wiring diagram showing the termination points for all field-wiring circuits to the Fire Alarm Control Unit (FACU).
h. The FACU shall be equipped with the required devices (Relays, Contactors, etc.)
to provide remote operation of Government furnished shut downs.
5) Commissioning Equipment List: The contractor shall provide a commissioning equipment list for each installed system. The equipment list shall identify all installed equipment and configurations.
6) Test Plan: The Contractor shall submit a test plan that describes how the system equipment and room integrity shall be tested. This shall include a step-by-step description of all tests and shall indicate type and location of test apparatus to be used.
At a minimum, the tests to be conducted shall be per NFPA 12 and any additional supplemental tests required by the Government. Tests shall not be scheduled nor conducted until the engineer of record or Government representative approves the test plan.
7) The Contractor shall submit the following Installation drawings to the Government within 30 days of project completion.
a. Two (2) sets of installation drawings for each installed clean agent fire extinguishing system and Two (2) sets of the calculation report (if not included in the drawings themselves), owner’s manual and product data sheets shall be submitted to the end-user/owner.
b. Upon completion of the installation and commissioning acceptance, two (2) sets of “As-Built” installation drawings and Two (2) set of the calculation report for each installed system shall be submitted to the owner/end-user.
8) The Contractor shall submit the following manuals within 30 days of project completion.
a. Two (2) copies of the HPCO2 Design, Installation, Operation and Maintenance
Manual.
Government Point of Contact for submittal review: All contractor submittals to be provided to Dan Guise daniel.r.guise@usace.army.mil and/or Brad Houzenga brad.c.houzenga@usace.army.mil
6. Security **NOTE: To protect the privacy of the Contractor, all Contractor employees, and all sub-contractor employees, background checks, OPSEC SOPs, E-verify, and I-9 forms shall be submitted with a coversheet stating the contract number (e.g. W912EK18PXXX), title of project, and the company's point of contact information, in a sealed envelope/container and mail:
Security Office U.S. Army Corps of Engineers Rock Island District 1500 Rock Island Drive Rock Island, IL 61201
Security Clause 2(b).
For Access and General Protection Policy and Procedures. All Contractors and sub-contractor employees shall comply with installation and facility access guidelines and rules as stated herein. Contractor workforce must comply with all personal identity verification requirements as directed by Department of Defense, Department of the Army Headquarters, Rock Island District and/or local policy. In addition to the changes otherwise authorized by the Changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.
In support of Rock Island District evaluation of personnel authorized for access to federal facilities, the Contractor shall submit background checks that have been conducted by a bonded third party within the last 6 months of Notice to Proceed date and authorize reports to be provided to the Rock Island District Security and Law Enforcement Office by the third party.
The background check will cover, at a minimum, the ten years covering states the employee has lived in, national criminal records check which includes felony and misdemeanor offenses, Department of Motor Vehicles records, and a national sex offender registry check, submitted 14 days prior to accessing the project site.
Identification Badges: The Contractor shall be responsible for furnishing a photo identification badge/card to each employee prior to the employee's work on-site, and for requiring each employee engaged on the work to display identification. At a minimum, the badge shall have the following items shown, the employee’s picture, employee’s name, and company name working for. The badge will be prominently displayed unless restricted for safety concerns, in which case it will be available for immediate display upon request (carried on person).
As employees are added or deleted from the submitted and approved Access Control List (ACL), this information will be reported immediately to the Contracting Officer (KO). Added employees will not be permitted on-site until requirements of this paragraph are completed, submitted, and approved.
Disqualifying factors include, but are not limited to:
(1) Criminal conduct, in particular violent crime and sex offenders;
(2) Habitual use of intoxicating beverages to excess as evidenced by Driving under the influence or public intoxication records; or
(3) Any illegal activity or other disqualification which makes the individual unfit for service (e.g.
drug trafficking or procurement fraud).
In addition to the submitted background checks, supplemental agency checks may be performed at the discretion of the Rock Island District security personnel. The Contractor agrees to cooperate and ensure that Contractor personnel provide any documentation required to complete these checks. Any person lacking proper identification credentials or deemed a security threat may be denied access to the project. Such action in no way relieves the Contractor from performance of the Contract. The Rock Island District retains the right to deny any Contractor and sub-contractor employee from working on a contract awarded by the Rock Island District based on final background investigation results. All information received as a result of a background check will be handled according to Privacy Act regulation.
In the event that an unexpected change in personnel is required, due to sudden absence of a critical path employee, the Contractor shall immediately contact the Contracting Officer to coordinate obtaining written approval from the Security Office for new/additional personnel to be brought on site prior to background check acceptance. Contractor shall submit Personnel Change Request Form and will receive written authorization from the Security Office prior to bringing new personnel on site, and ensure a background check is sent to the Rock Island District Security Office no later than ten days from written notice of approval. The Rock Island District reserves the right to terminate access of the employee upon completion of the Government’s review of the background check and the Contractor shall be notified immediately of any such Government decision.
In the event of an unforeseen change in work site conditions which may require a contract modification, and the contractor is required to immediately add personnel, a Personnel Change Request Form will be submitted to and approved by the Security Office prior to bringing new personnel on site, and ensure a background check is sent to the Rock Island District Security Office no later than ten days from written notice of approval. The Rock Island District reserves the right to terminate access of the employee upon completion of the Government’s review of the background check and the Contractor shall be notified immediately of any such Government decision.
Subcontractor personnel not expected to be on the worksite for more than 15 days may be allowed on site with the following conditions:
1) Employee will be on site a total of 15 days or less, for the duration of the project.
2) Employee is added to the ACL as a short term employee.
3) Employee is escorted while on site. This is defined as being in the line of sight of an identified contractor employee who has a background check on file with the Rock Island District (as noted on the ACL).
4) Each contractor employee can sponsor only five short term employees at a time.
Foreign National employees: Due to a difference in background check procedures for long term foreign national employees, all such employees must provide a photocopy of their passport to the Rock Island District Security Office NLT 30 days prior to arrival on site. Short term foreign national employees (e.g. specialists with a two week period of performance) may work on site with the following conditions:
1) Foreign national employee will be on site a total of 15 days or less, for the duration of the project.
2) Foreign national employee will comply with E-verify requirements E-verify paragraph).
3) Approved and identified contractor employee shall escort the foreign national employee at ALL times while on site.
4) Each contractor employee can sponsor only one short term foreign national at a time.
Personnel Change Request Form Contract #_______________ Date___________ We, _____________________, respectfully request to add/replace (circle one) personnel to the jobsite due to the following situation:
Personnel to be conditionally added to the ACL (escorted by):
Background checks (if required for a long term employee) shall be submitted by close of business on (insert proposed date): ________________
(Insert signature block)
Security Clause 15.
Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program website (http://www.uscis.gov/e-verify) to meet the established employment eligibility requirements. The Contractor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. Documentation of company enrollment in E-verify, via a print screen of the company profile within the E-verify system, must be submitted to the Security Office no later than 3 business days after the initial Notice to Proceed.
*When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification must be given/coordinated with the designated Government representative. This Form will be provided to the Security Office after Notice to Proceed is given.
QUALITY ASSURANCE PLAN
QUALITY ASSURANCE SURVEILLANCE PLAN
Purpose: This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Supply standards included in this contract. The intent is to ensure that the contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract, and that the Government only pays for the acceptable level of services received.
1. Critical performance processes and requirements. Critical to the performance of the contract, the contractor shall provide all personnel equipment, tools, materials, supervision, transportation, other items and services necessary to perform as defined in this Performance Work Statement (PWS). The contractor shall provide accurate transaction processing to ensure that material accountability comply with safety and security requirements, in accordance with this PWS. Additionally, the contractor shall be accountable for all auditable documents, establish/maintain effective quality, and perform required within prescribed timeframes. The performance process is the timely, accurate, and thorough completion of all contract requirements.
2. Performance Standards
a. Schedule. The dates for services and the actual accomplishment of the services in accordance with the schedule will be assessed against original dates of services and milestones established for the contract.
b. Service. The services required to be performed will be assessed against the PWS detailed in the contract, for the required content, quality, timeliness, and accuracy.
c. Past Performance. In addition to schedule and services, and cost aspects of performance discussed above, pursuant to FAR 42.15, the Government will assess the contractor’s record of conforming to contract requirements and to standards of good workmanship, the contractor’s adherence to contract schedules including the administrative aspects of performance, the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction, and the contractor’s business-like concern for the interest of the customer.
3. Surveillance methods. The primary methods of surveillance used to monitor performance of this contract will include, but not be limited to: random or planned sampling, periodic inspection, Contractor Self Reporting, and validated customer complaints.
a. Random/Scheduled Monitoring. Random and/or scheduled monitoring will be conducted if and when deemed necessary by the COR to ensure compliance with the terms of the contract. Using the attached matrix the COR will determine whether the contractor is in compliance with the terms of the contract.
b. Contractor Self-Reporting. The contractor shall provide as needed status reports that document significant problems/issues and potential resolutions.
c. Customer Feedback. Customer feedback will be obtained from valid customer complaints. Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint; must be signed and must be forwarded to the COR by the contractor. The contractor shall maintain a log of all customer complaints as well as a copy of each complaint in a documentation file. The COR may request to review the log and/or documentation file at any time.
4. Performance Measurement. Performance will be measured in accordance with the following table:
Performance Element
Performance Requirement
Surveillance Method
Frequency Acceptable Quality Level
Contract Services Contract Supplies furnished as prescribed in the PWS as applicable.
Inspection by the
COR
Random inspection of all sampling of contract supplies
>95% of services inspected performed timely and without rework required.
Overall Contract Performance
Overall contract performance of sufficient quality to earn a Satisfactory (or higher) rating in the COR’s annual report on contractor performance
Assessment by the
COR
Annual All service elements rated Satisfactory (or higher) Satisfactory = 95% or above average contract acceptable random sampling
Contractor Self Reporting
Contract Services furnished as prescribed in the PWS as applicable.
Contractor Self Reports
Monthly >95% of services reported performed timely and without rework required.
Customer Feedback
Customer complaints reviewed by COR
Inspection by the
COR
Per Occurrence 100% of valid customer complaints resolved
Invoicing Monthly invoices per contract procedures are timely and accurate.
Review & acceptance of the invoice by COR
Monthly 100% accuracy
Disincentives:
For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report (CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.
In accordance with the inspection of services provisions of the contract (52.212-4 (a) Inspection/Acceptance), the contractor will provide quality products in a timely manner since the Government can require the contractor, at no additional cost, to replace or correct work that fails to meet contract requirements.
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2016 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2016 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-22 Alternative Line Item Proposal JAN 2017 52.225-25 Prohibition on Contracting with Entities Engaging in Certain
Activities or Transactions Relating to Iran-- Representation and Certifications.
OCT 2015
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.237-1 Site Visit APR 1984 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.246-1 Contractor Inspection Requirements APR 1984 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7003 Agency Office of the Inspector General DEC 2012 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
OCT 2016
252.243-7001 Pricing Of Contract Modifications DEC 1991
CLAUSES INCORPORATED BY FULL TEXT
52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (JAN 2017)
(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet (SF 1449). However, the small business size standard for a concern which submits an offer in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.
(b) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show--
(1) The solicitation number;
(2) The time specified in the solicitation for receipt of offers;
(3) The name, address, and telephone number of the offeror;
(4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;
(5) Terms of any express warranty;
(6) Price and any discount terms;
(7) "Remit to" address, if different than mailing address;
(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically);
(9) Acknowledgment of Solicitation Amendments;
(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and
(11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.
(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.
(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of offers. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender's request and expense, unless they are destroyed during preaward testing.
(e) Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions, including alternative line items (provided that the alternative line items are consistent with subpart 4.10 of the Federal Acquisition Regulation), or alternative commercial items for satisfying the requirements of this solicitation.
Each offer submitted will be evaluated separately.
(f) Late submissions, modifications, revisions, and withdrawals of offers:
(1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that offers or revisions are due.
(2)(i) Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--
(A) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of offers; or
(B) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or
(C) If this solicitation is a request for proposals, it was the only proposal received.
(ii) However, a late modification of an otherwise successful offer, that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(3) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the offer wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(4) If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government office designated for receipt of offers by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of offers will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(5) Offers may be withdrawn by written notice received at any time before the exact time set for receipt of offers.
Oral offers in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile offers, offers may be withdrawn via facsimile received at any time before the exact time set for receipt of offers, subject to the conditions specified in the solicitation concerning facsimile offers. An offer may be withdrawn in person by an offeror or its authorized representative if, before the exact time set for receipt of offers, the identity of the person requesting withdrawal is established and the person signs a receipt for the offer.
(g) Contract award (not applicable to Invitation for Bids). The Government intends to evaluate offers and award a contract without discussions with offerors. Therefore, the offeror's initial offer should contain the offeror's best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all offers if such action is in the public interest; accept other than the lowest offer; and waive informalities and minor irregularities in offers received.
(h) Multiple awards. The Government may accept any item or group of items of an offer, unless the offeror qualifies the offer by specific limitations. Unless otherwise provided in the Schedule, offers may not be submitted for quantities less than those specified. The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit prices offered, unless the offeror specifies otherwise in the offer.
(i) Availability of requirements documents cited in the solicitation. (1)(i) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to--GSA Federal Supply Service Specifications Section, Suite 8100, 470 East L'Enfant Plaza, SW, Washington, DC 20407, Telephone (202) 619-8925, Facsimile (202) 619-8978.
(ii) If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (i)(1)(i) of this provision.
Additional copies will be issued for a fee.
(2) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:
(i) ASSIST (https://assist.dla.mil/online/start/).
(ii) Quick Search (http://quicksearch.dla.mil/).
(iii) ASSISTdocs.com (http://assistdocs.com).
(3) Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point (DoDSSP) by--
(i) Using the ASSIST Shopping Wizard (https://assist.dla.mil/wizard/index.cfm);
(ii) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or
(iii) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone
(215) 697-2667/2179, Facsimile (215) 697-1462.
(4) Nongovernment (voluntary) standards must be obtained from the organization responsible for their preparation, publication, or maintenance.
(j) Unique entity identifier. (Applies to all offers exceeding $3,500, and offers of $3,500 or less if the solicitation requires the Contractor to be registered in the System for Award Management (SAM) database.) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address. The Offeror also shall enter its Electronic Funds Transfer (EFT) indicator, if applicable. The EFT indicator is a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the Offeror to establish additional SAM records for identifying alternative EFT accounts (see subpart 32.11) for the same entity. If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for unique entity identifier establishment directly to obtain one. The Offeror should indicate that it is an offeror for a Government contract when contacting the entity designated at www.sam.gov for establishing the unique entity identifier.
(k) System for Award Management. Unless exempted by an addendum to this solicitation, by submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance and through final payment of any contract resulting from this solicitation. If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror. Offerors may obtain information on registration and annual confirmation requirements via the SAM database accessed through https://www.acquisition.gov.
(l) Debriefing. If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:
(1) The agency's evaluation of the significant weak or deficient factors in…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.