A.07.24_Amendment_0004.pdf
PDF 1 MB Posted
- Attached to
- Ice Harbor Navigation Lock Downstream Gate Hoist Machinery Upgrades Federal contract opportunity
- Solicitation number
- W912EF-15-R-0040
About this file
Amendment 0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A.07.24_Amendment_0003.pdf | ||
| A.07.24_Amendment_0002.pdf | ||
| Site_Visit_Attendees _15-R-0040_HLD_DS_Gate_Operating_Machinery.pdf | ||
| Amendment_0001.pdf | ||
| Plans-FIOs-1.pdf | ||
| Plans-FIOs-2.pdf | ||
| A.04.12_BrandNameJustificationHLDGeokonLC.pdf | ||
| Plans-1.pdf | ||
| W912EF-15-R-0040_with_specs.pdf | ||
| Plans-2.pdf | ||
| A.04.12_BrandNameJustificationHLDEatonBreakers.1.pdf | ||
| A_04_12_Brand_Name_Justification_Allen_Bradley_Conrol_Logix_PLC.pdf | ||
| Site_Visit_Information.pdf | ||
| Plans-FIOs-3.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Construction Project: Ice Harbor Navigation Lock Dow nstream Gate Hoist Machinery Upgrades
The purpose of this amendment is to incorporate the changes detailed in the Summary of Changes.
The proposal due date remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 18
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Nov-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-15-R-0040
X 9B. DATED (SEE ITEM 11)
01-Oct-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Nov-2015
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
HILLARY A. MORGAN
201 N. THIRD AVENUE
WALLA WALLA WA 99362
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF-15-R-0040
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0004
Ice Harbor Navigation Lock Downstream Gate Hoist Machinery Upgrades Summary of Changes - Amendment 0004
Changes to the Solicitation:
Wage determination
Updated to reflect work done in Franklin County
Changes to the Specification:
01 33 00
A new submittal register is provided since 3 submittals were removed from section 03 30 10.00 28
03 30 10.00 28
Subpart 1.2 (References): Reference ICC-ES AC308 has been removed Subpart 1.3 (Submittals): The following submittals have been removed:
o SD-03 – Epoxy or vinylester adhesive o SD-05 – Epoxy or Vinylester Resin Bonding System o SD-06 Test Reports – Anchor Pull Tests
Subpart 1.3.1 (Epoxy or Vinylester Resin Bonding System for Bridge Crane Corbel): Subpart has been removed. Previous Subparts 1.3.2 and 1.3.3 have been renumbered.
Subpart 2.1.2 (Adhesive Anchor System for Bridge Crane Corbels): Subpart has been removed. Previous Subparts 2.1.3 and 2.1.4 have been renumbered.
Subpart 3.5.2 (Anchor Pull Test): Subpart has been removed Subpart 3.8.2 (Compressive Strength Testing): New section referenced for compressive strength testing to confirm grout strength.
41 22 13.17 28
Subpart 2.2.1 (General): Revised first sentence for the electric hoist requirements.
Changes to Drawings:
E-641
Revised fiber optic strand counts
SECTION 00700 - CONTRACT CLAUSES
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Drawing Number
Sheet Number
Title
Revision Number
Date
ICE HARBOR LOCK AND DAM
DOWNSTREAM GATE OPERATION MACHINERY REPAIR
GENERAL
IHG‐1‐0‐1/500 G‐001 COVER SHEET AND LOCATION MAPS
IHG‐1‐0‐1/501 G‐002 INDEX TO DRAWINGS ‐ 1
IHG‐1‐0‐1/502 G‐003 INDEX TO DRAWINGS ‐ 2
IHG‐1‐0‐1/503 G‐004 STANDARD SYMBOLS
IHG‐1‐0‐1/504 G‐005 STANDARD ABBREVIATIONS
IHG‐1‐0‐1/505 G‐006 ELECTRICAL LEGEND ‐ 1
IHG‐1‐0‐1/506 G‐007 ELECTRICAL LEGEND ‐ 2
IHG‐1‐0‐1/507 G‐101 NAVIGATION LOCK PLAN
ARCHITECTURAL
IHN‐1‐2‐6/1 AD101
ARCHITECTURE ‐ ROOF PLAN ‐ DEMOLITION ‐
NORTH AND SOUTH TOWERS
IHN‐1‐2‐6/2 A‐101
ARCHITECTURE ‐ ROOF PLAN ‐ REPLACEMENT ‐
NORTH AND SOUTH TOWERS
IHN‐1‐2‐6/3 A‐301 ARCHITECTURE ‐ EXISTING TOWER SECTIONS
IHN‐1‐2‐6/4 A‐501 ARCHITECTURE ‐ DETAILS
IHN‐1‐2‐6/5 A‐502
ARCHITECTURE ‐ NORTH AND SOUTH TOWERS ‐
RAILING DETAILS
IHN‐1‐2‐6/6 A‐901 ARCHITECTURE ‐ PHOTOS
STRUCTURAL
IHN‐1‐5‐6/1 S‐501 CORBEL STRENGTHENING SECTIONS AND DETAILS
MECHANICAL
IHN‐1‐3‐6/7 MD101 GATE HOIST EQUIPMENT DEMOLITION PLAN
IHN‐1‐3‐6/8 MD301
GATE HOIST EQUIPMENT DEMOLITION
ELEVATION
IHN‐1‐3‐6/9 M‐101 GATE HOIST EQUIPMENT ARRANGEMENT PLAN
IHN‐1‐3‐6/10 M‐102 OVERHEAD CRANE PLAN AND ELEVATIONS
IHN‐1‐3‐6/11 M‐111 FRICTION SHEAVE SHAFT
IHN‐1‐3‐6/12 M‐301
GATE HOIST EQUIPMENT ARRANGEMENT
ELEVATION
IHN‐1‐3‐6/13 M‐501
HOIST MECHANICAL EQUIPMENT SECTIONS AND
DETAILS
IHN‐1‐3‐6/14 M‐502 HOIST MECHANICAL DETAILS
IHN‐1‐3‐6/15 M‐510 RING GEAR DETAILS
IHN‐1‐3‐6/16 M‐520 PINION GEAR AND SHAFT DETAILS
IHN‐1‐3‐6/17 M‐601
MECHANICAL EQUIPMENT SCHEDULES AND
NOTES
ELECTRICAL
IHN‐1‐6‐6/3 ED101 ELECTRICAL ‐ SOUTH TOWER ‐ DEMOLITION PLAN
INH‐1‐6‐6/4 ED102 ELECTRICAL ‐ NORTH TOWER ‐ DEMOLITION PLAN
IHN‐1‐6‐6/5 ED103
ELECTRICAL ‐ LOCK CONTROL STAND 1 ‐
DEMOLITION PLAN
IHN‐1‐6‐6/6 ED110
ELECTRICAL ‐ GALLERY EL. 413‐EL. 438 ‐ CABLE
IHN‐1‐6‐6/7 ED111
IHN‐1‐6‐6/8 ED112
ELECTRICAL ‐ GALLERY EL. 438 ‐ CABLE
IHN‐1‐6‐6/9 ED113
IHN‐1‐6‐6/10 ED114
ELECTRICAL ‐ GALLERY EL. 407.79‐EL. 438 ‐ CABLE
IHN‐1‐6‐6/11 EE101 ELECTRICAL ‐ SOUTH TOWER ‐ PLAN A 11/2/15
IHN‐1‐6‐6/12 EE102 ELECTRICAL ‐ NORTH TOWER ‐ PLAN A 11/2/15
IHN‐1‐6‐6/13 EE103 ELECTRICAL ‐ LOCK CONTROL STAND 1 ‐ PLAN
IHN‐1‐6‐6/14 EE110
INSTALLATION PLAN
IHN‐1‐6‐6/15 EE111
ELECTRICAL ‐ GALLERY EL413‐EL. 438 ‐ CABLE
IHN‐1‐6‐6/16 EE112
IHN‐1‐6‐6/17 EE113
IHN‐1‐6‐6/18 EE114
ELECTRICAL ‐ GALLERY EL. 407.79‐EL. 438 ‐ CABLE
IHN‐1‐6‐6/19 E‐401 ELECTRICAL ‐ LG1S ELEVATIONS
IHN‐1‐6‐6/20 E‐402 ELECTRICAL ‐ LG1S PANEL FRONT LAYOUT
IHN‐1‐6‐6/21 E‐403 ELECTRICAL ‐ LG1N ELEVATIONS
IHN‐1‐6‐6/22 E‐404 ELECTRICAL ‐ LG1N PANEL FRONT LAYOUT
IHN‐1‐6‐6/23 E‐405 ELECTRICAL ‐ LCS1 AND S2 ELEVATIONS
IHN‐1‐6‐6/24 E‐406 ELECTRICAL ‐ CC1 ELEVATION
IHN‐1‐6‐6/25 E‐407 ELECTRICAL ‐ CC2 ELEVATION
IHN‐1‐6‐6/26 E‐410 ELECTRICAL ‐ MCC ELEVATIONS
IHN‐1‐6‐6/27 E‐501 ELECTRICAL ‐ DETAILS 1
IHN‐1‐6‐6/28 E‐502 ELECTRICAL ‐ DETAILS 2
IHN‐1‐6‐6/29 E‐600 ELECTRICAL ‐ LG1S LADDER DIAGRAM 1
IHN‐1‐6‐6/30 E‐601 ELECTRICAL ‐ LG1S LADDER DIAGRAM 2
IHN‐1‐6‐6/31 E‐602 ELECTRICAL ‐ LG1N LADDER DIAGRAM 1
IHN‐1‐6‐6/32 E‐603 ELECTRICAL ‐ LG1N LADDER DIAGRAM 2
IHN‐1‐6‐6/33 E‐604 ELECTRICAL ‐ CC1 LADDER DIAGRAM 1
IHN‐1‐6‐6/34 E‐605 ELECTRICAL ‐ CC1 LADDER DIAGRAM 2
IHN‐1‐6‐6/35 E‐606 ELECTRICAL ‐ CC1 LADDER DIAGRAM 3
IHN‐1‐6‐6/36 E‐607 ELECTRICAL ‐ CC1 LADDER DIAGRAM 4
IHN‐1‐6‐6/37 E‐608 ELECTRICAL ‐ CC1 LADDER DIAGRAM 5
IHN‐1‐6‐6/38 E‐609 ELECTRICAL ‐ CC2 LADDER DIAGRAM 1
IHN‐1‐6‐6/39 E‐610
ELECTRICAL ‐ LG1S TERMINAL BLOCK ‐ WIRING
DIAGRAM
IHN‐1‐6‐6/40 E‐611 ELECTRICAL ‐ VFD‐1S ENCLOSURE
IHN‐1‐6‐6/41 E‐612 ELECTRICAL ‐ LG1S PLC DIAGRAM
IHN‐1‐6‐6/42 E‐613
ELECTRICAL ‐ LG1N TERMINAL BLOCK ‐ WIRING
IHN‐1‐6‐6/43 E‐614 ELECTRICAL ‐ VFD‐1N ENCLOSURE
IHN‐1‐6‐6/44 E‐615 ELECTRICAL ‐ LG1N PLC DIAGRAM
IHN‐1‐6‐6/45 E‐616
ELECTRICAL ‐ LCS1 TERMINAL BLOCK ‐ WIRING
IHN‐1‐6‐6/46 E‐617
ELECTRICAL ‐ CC1 TERMINAL BLOCK ‐ WIRING
DIAGRAM 1
IHN‐1‐6‐6/47 E‐618
ELECTRICAL ‐ CC1 TERMINAL BLOCK ‐ WIRING
DIAGRAM 2
IHN‐1‐6‐6/48 E‐619 ELECTRICAL ‐ CC1 PLC DIAGRAM
IHN‐1‐6‐6/49 E‐620
ELECTRICAL ‐ CC2 TERMINAL BLOCK ‐ WIRING
IHN‐1‐6‐6/50 E‐621 ELECTRICAL ‐ CC2 PLC DIAGRAM
IHN‐1‐6‐6/51 E‐622 ELECTRICAL ‐ E‐STOP DIAGRAM
IHN‐1‐6‐6/52 E‐630 ELECTRICAL ‐ NETWORK BLOCK DIAGRAM
IHN‐1‐6‐6/53 E‐631 ELECTRICAL ‐ NETWORK PATCH DIAGRAM
IHN‐1‐6‐6/54 E‐640 ELECTRICAL ‐ SINGLE‐LINE DIAGRAM
IHN‐1‐6‐6/55 E‐641
ELECTRICAL ‐ CABLE SCHEDULE AND ‐ LR‐7, LR‐8
SCHEDULES
A 11/4/15
IHN‐1‐6‐6/56 E‐650
ELECTRICAL ‐ EXISTING VALVE 1 ‐ EXISTING
CONTROL DIAGRAM
IHN‐1‐6‐6/57 E‐651
ELECTRICAL ‐ EXISTING VALVE 1 ‐ NEW CONTROL
IHN‐1‐6‐6/58 E‐652
ELECTRICAL ‐ EXISTING VALVE 2 ‐ EXISTING
IHN‐1‐6‐6/59 E‐653
ELECTRICAL ‐ EXISTING VALVE 2 ‐ NEW CONTROL
IHN‐1‐6‐6/60 E‐654
ELECTRICAL ‐ EXISTING VALVE 3 ‐ EXISTING
IHN‐1‐6‐6/61 E‐655
ELECTRICAL ‐ EXISTING VALVE 3 ‐ NEW CONTROL
IHN‐1‐6‐6/62 E‐656
ELECTRICAL ‐ EXISTING VALVE 4 ‐ EXISTING
IHN‐1‐6‐6/63 E‐657
ELECTRICAL ‐ EXISTING VALVE 4 ‐ NEW CONTROL
IHN‐1‐6‐6/64 E‐658
ELECTRICAL ‐ EXISTING INTERLOCK ‐ EXISTING
IHN‐1‐6‐6/65 E‐659
ELECTRICAL ‐ EXISTING INTERLOCK ‐ NEW
IHN‐1‐6‐6/66 E‐660
ELECTRICAL ‐ EXISTING FLOODLIGHTS ‐
EXISTING/NEW CONTROL DIAGRAMS
IHN‐1‐6‐6/67 E‐661
ELECTRICAL ‐ GATE AIR SEAL & NO SMOKING
SIGNS ‐ EXISTING/NEW CONTROL DIAGRAMS
IHN‐1‐6‐6/68 E‐662
ELECTRICAL ‐ EXISTING SMALL CRAFT ANN ‐
EXISTING CONTROL DIAGRAM
IHN‐1‐6‐6/69 E‐663
ELECTRICAL ‐ EXISTING SMALL CRAFT ANN. ‐ NEW
IHN‐1‐6‐6/70 E‐664
ELECTRICAL ‐ EXISTING MISCELLANEOUS SYSTEMS
‐ INTERFACE DIAGRAMS
IHN‐1‐6‐6/71 E‐670 ELECTRICAL ‐ CONTROL NARRITIVE
FOR INFORMATION ONLY (FIO)
The Government does not warrant the accuracy of the FIO drawings. The Government recommends that the Contractor verify the accuracy of FIO drawings.
IHN‐1‐6‐14/35.1 FI0‐001
NORTH SHORE CONTRACT ‐ CONTROL STAND S‐1
‐ WIRING DIAGRAM
IHN‐1‐6‐14/35.2 FI0‐002
NORTH SHORE CONTRACT ‐ CONTROL STAND S2 ‐
WIRING DIAGRAM
34‐00‐4E FI0‐003
SEAL HEATERS ‐ GATES 1 & 2 ‐ ELEMENTARY &
CONNECTION DIAGRAM
34‐02‐1E FI0‐004 LIFT GATE BLOCK DIAGRAM
34‐02‐2E FI0‐005
POWER AND CONTROL SYSTEM ‐ SCHEMATIC
34‐02‐7E FI0‐006 LIFT GATE INTERCONNECT WIRING
34‐04‐1E FI0‐007
TAINTER VALVE 1 ‐ ELEMENTARY & CONNECTION
34‐04‐2E FI0‐008
TAINTER VALVE 2 ‐ ELEMENTARY & CONNECTION
34‐04‐3E FI0‐009
TAINTER VALVE 3 ‐ ELEMENTARY & CONNECTION
34‐04‐4E FI0‐010
TAINTER VALVE 4 ‐ ELEMENTARY & CONNECTION
34‐04‐5E FI0‐011 TAINTER VALVE 4 ‐ VARD CONTROL SCHEMATIC
INH‐1‐6‐14/4 FI0‐012
NAVIGATION LOCK ‐ POWER AND LIGHTING
SYSTEM ‐ ONE LINE DIAGRAM
IHN‐1‐6‐14/10 FI0‐013
NAVIGATION LOCK ‐ LIGHTING SYSTEM 448.0
DECK & LOCK = CHAMBER LIGHTING ‐ WIRING
IHN‐1‐6‐14/6 FI0‐014
NAVIGATION LOCK ‐ LIGHTING SYSTEM ‐
CONTROL STAND SHELTERS WIRING DIAGRAM
IHN‐1‐6‐14/20 FI0‐015
NAVIGATION LOCK ‐ POWER AND LIGHTING ‐
UPSTREAM SERVICE GALLERIES WIRING
IHN‐1‐6‐14/23 FI0‐016
NAVIGATION LOCK ‐ POWER LIGHTING AND
CONTROL ‐ GATE NO. 1 MACHINERY ROOMS
WIRING DIAGRAM ‐ SHEET 2
IHN‐1‐6‐14/24 FI0‐017
CONTROL ‐ CABLE ROUTING SCHEDULE SHEET I
IHN‐1‐6‐14/25 FI0‐018
CONTROL ‐ CABLE ROUTING SCHEDULE SHEET II
IHN‐1‐6‐14/26 FI0‐019
CONTROL ‐ CABLE ROUTING SCHEDULE SHEET III
IHN‐1‐6‐14/28 FI0‐020
NAVIGATION LOCK ‐ COMPRESSOR ROOM ‐
POWER LIGHTING AND CONTROL WIRING
IHN‐1‐6‐14/30 FI0‐021
NAVIGATION LOCK ‐ POWER AND CONTROL ‐
GATE NO. 2 ‐ ELEMENTARY AND CONNECTION
IHN‐1‐6‐14/31 FI0‐022
GATE NO. 2 ‐ MACHINERY ROOMS WIRING
IHN‐1‐6‐14/32 FI0‐023
NAVIGATION LOCK ‐ POWER AND CONTROL
TAINTER VALVES 1 AND 2 ‐ SCHEMATIC AND
IHN‐1‐6‐14/33 FI0‐024
NAVIGATION LOCK ‐ POWER AND CONTROL
TAINTER VALVES 3 AND 4 ‐ SCHEMATIC AND
IHN‐1‐6‐14/34 FI0‐025
TAINTER VALVES MACHINERY ROOMS WIRING
DIAGRAMS
IHN‐1‐6‐14/35 FI0‐026
CONTROL STAND S1 AND S2 GENERAL
ARRANGEMENT
IHN‐1‐6‐14/35.1 FI0‐027
NORTH SHORE CONTRACT ‐ CONTROL STAND S‐1
‐ WIRING DIAGRAM
IHN‐1‐6‐14/35.2 FI0‐028
NORTH SHORE CONTRACT ‐ CONTROL STAND S2 ‐
IHN‐1‐6‐14/48 FI0‐029
NAVIGATION LOCK ‐ POWER ‐ LIGTING &
CONTROL CABLE SYSTEMS CABLE POSITIONS
IHN‐1‐6‐14/50 FI0‐030
NAVIGATION LOCK ‐ CABLE TRAY SYSTEM ‐
UPSTREAM SERVICE GALLERY MONOLITHS 3, 5, 7
& 9
IHN‐1‐6‐14/52 FI0‐031
BRIDGE AND SILL BLOCK
IHN‐1‐6‐14/53 FI0‐032
OPERATIONS BUILDING
IHN‐9‐6‐32/2 FI0‐033
DOWNSTREAM LIFT GATE ‐ ELECTRICAL
SCHEMATIC
IHN‐1‐6‐14/51 FI0‐034
NAVIGATION LOCK ‐ CABLE TRAY SYSTEM
DOWNSTREAM SERVICE GALLERY ‐ MONOLITHS
13 THROUGH 34
IHN‐1‐6‐14/22 FI0‐035
CONTROL ‐ GATE NO. 1 MACHINERY ROOMS
WIRING DIAGRAM ‐ SHEET 1
IHN‐1‐6‐14/42 FI0‐036
CABLE ROUTING DIAGRAM
IHN‐1‐6‐14/58 FI0‐037
NAVIGATION LOCK ‐ 4160 VOLT POWER CENTER
LSP1 & 480 VOLT CONTROL CENTER LSQ1 ‐
ELECTRICAL ARRNAGEMENT
IHN‐1‐6‐14/151 FI0‐038
NAVIGATION LOCK ‐ OPERATIONS BUILDING
SWITCHGEAR ROOM ‐ CONDUIT AND
SWITCHGEAR INSTALLATION
IHN‐1‐6‐14/59 FI0‐039
NAVIGATION LOCK ‐ ELECTRICAL ELEMENTARY
CONTROL DIAGRAMS ‐ 480 VOLT CONTROL
CENTER LSQ1
34‐09‐6E FI0‐040 LSQ1 ‐ FRONT CONNECTION DIAGRAM
IHN‐1‐6‐14/57 FI0‐041
NAVIGATION LOCK ‐ 4160 VOLT POWER CENTER
LSP1 & 480 VOLT CONTROL CENTER LSQ1 ‐
ELECTRICAL DIAGRAMS
IHN‐1‐6‐14/8 FI0‐042
NAVIGATION LOCK ‐ LIGHTING SYSTEM PANEL
LR6 ‐ ELEMENTARY WIRING DIAGRAM
IHN‐1‐6‐14/5 FI0‐043
NAVIGATION LOCK ‐ POWER AND LIGHTING
SYSTEM ‐ DETAILS
IHN‐1‐4‐2/27 FI0‐044 NAVIGATION LOCK ‐ MONOLITH 30
IHN‐1‐4‐2/30 FI0‐045 NAVIGATION LOCK ‐ MONOLITH 32
IHN‐1‐4‐2/35 FI0‐046
NAVIGATION LOCK ‐ MONOLITH 34 ‐ PLANS &
SECTIONS I
IHN‐1‐4‐2/37 FI0‐047 NAVIGATION LOCK ‐ MONOLITH 34 ‐ ELEVATIONS
34‐09‐5E FI0‐048 LSQ1 ‐ REAR CONNECTION DIAGRAM
IHN‐1‐6‐14/42.1 FI0‐049
NORTH SHORE CONTRACT ‐ LSQ1 SWITCHGEAR
(REAR) ‐ WIRING DIAGRAM
IHN‐1‐6‐14/42.2 FI0‐050
NORTH SHORE CONTRACT ‐ LSQ1 SWITCHGEAR
(FRONT) ‐ WIRING DIAGRAM
IHN‐1‐3‐6/1 FI0‐051
NAVIGATION LOCK ‐ LIFT GATE OPERATING
MACHINERY ‐ ASSEMBLY
H‐4741 FI0‐052
NAVIGATION LOCK ‐ LIFT GATE MACHINERY ‐ LIFT
GATE HOIST ASSEMBLY
H‐4742 FI0‐053
NAVIGATION LOCK ‐ LIFT GATE MACHINERY ‐ LIFT
GATE HOIST ASSEMBLY
IHN‐1‐3‐32/7 FI0‐054
NAVIGATION LOCK UPGRADE ‐ LOWER LIFT
GATES ‐ HYDRAULIC EQUIPMENT
D‐20155 FI0‐055 ASSEMBLY
89‐9255 FI0‐056 SHAFT
G‐4168 FI0‐057
NAVIGATION LOCK ‐ LIFT GATE MACHINERY ‐
PINION ASSEMBLY
H‐4746 FI0‐058
PINION DETAILS
18 399‐1 FI0‐059
RADIAL ROLLER BEARING ‐ PILLOW BLKS FOR ‐
19.00 DIA. SHAFT (TAPERED)
18 400 FI0‐060 PILLOW BLOCK
5800‐8002 FI0‐061
DRUM GEAR
H‐4744 FI0‐062
DRUM‐PEDESTAL ASSEMBLY
H‐4743 FI0‐063
HOIST DRUM DETAILS
H‐6345 FI0‐064
HOIST DRUM ALTERATION & DETAILS
C3331‐100 FI0‐065
NAVIGATION LOCK ‐ LOWER HOIST REDUCERS ‐
OUTLINE DIMENSION DRAWING
88171949 FI0‐066 ASSEMBLY ‐ SHAFT POS: 1234
88173127 FI0‐067 ASSEMBLY ‐ SHAFT POS: 1234
88159922C FI0‐068 DIMENSION DRAWING
88159930C FI0‐069 DIMENSON DRAWING
G‐4167 FI0‐070
REDUCER‐BRAKE SUPPORT
H‐4831 FI0‐071
ANCHOR BOLT PLAN
G‐4520 FI0‐072
PINION PEDESTAL WELD'T.
H‐4665 FI0‐073
GATE & COUNTERW'T CABLE
IHN‐1‐5‐32/2 FI0‐074
DOWNSTREAM GATE REPLACEMENT ‐ NEW LIFT
GATE ‐ ELEVATION, SECTIONS & DETAILS
G1121‐002 B FI0‐075 GATE REPLACEMENT ‐ ASSEMBLY
G1121‐413 A FI0‐076 GATE REPLACEMENT ‐ GATE CABLE CONNECTION
G1121‐403 A FI0‐077
GATE REPLACEMENT ‐ COUNTERWEIGHT
MODIFICATION
IHN‐1‐3‐32/8 FI0‐078
DOWNSTREAM GATE REPLACEMENT ‐ GATE
WHEELS ‐ SECTIONS AND DETAILS
G1121‐407 B FI0‐079 GATE REPLACEMENT ‐ END JACKING LUG
G1121‐501 B FI0‐080 GATE REPLACEMENT ‐ GATE WHEEL ASSEMBLY
G1121‐408 A FI0‐081 GATE REPLACEMENT ‐ END SHOE
IHN‐1‐5‐32/6 FI0‐082
DOWNSTREAM GATE REPLACEMENT ‐ SEAL
DETAILS
IHN‐1‐4‐1/1 FI0‐083 NAVIGATION LOCK ‐ GENERAL MASONRY PLAN
IHN‐1‐4‐2/1 FI0‐084 NAVIGATION LOCK ‐ MONOLITHS 1 & 2
IHN‐1‐4‐2/44 FI0‐085
NAVIGATION LOCK ‐ MONOLITH 33 AND 34 ‐
TOWER ‐ CONCRETE
IHN‐1‐4‐2/45 FI0‐086
TOWERS ‐ REINFORCEMENT I
IHN‐1‐4‐2/46 FI0‐087
TOWERS ‐ REINFORCEMENT II
IHN‐1‐4‐2/47 FI0‐088
TOWERS ‐ DETAILS
IHN‐1‐4‐2/48 FI0‐089
NAVIGATION LOCK ‐ LIFT GATE ‐ BLOCKOUT &
GUIDE DETAILS I
IHN‐1‐4‐2/51 FI0‐090
NAVIGATION LOCK ‐ LIFT GATE ‐ BLOCKOUT &
GUIDE DETAILS IV
IHN‐1‐5‐5/10 FI0‐091
NAVIGATION LOCK ‐ LIFT GATE ‐
COUNTERWEIGHT SUPPORT BEAMS
IHN‐1‐5‐32/44 FI0‐092
NAVLOCK DOWNSTREAM GATE ‐ CABLE
INSTLLATION II ‐ COUNTERWEIGHT SHAFT
OPENINGS
IHN‐1‐5‐32/37 FI0‐093
CONNECTIONS ‐ MISCELLANEOUS DETAILS
IHN‐1‐2‐32/2 FI0‐094
INSTALLATION II ‐ ROOFING ‐ REPAIRS ‐ PLAN
AND DETAILS
(End of drawing list) (End of Clause)
Contract drawings created on CAD will be available in electronic form for use by the Contractor. No For Information Only drawings are available on CAD. The Contractor assumes all risks associated in using electronic CAD drawings. The contract drawings shall govern if there are any discrepancies between the electronic copy and the contract drawing. The Contractor shall promptly notify the Contracting Officer of any discrepancies. The Government will not be responsible to correct the electronic CAD drawing. If contract modifications are issued, the associated electronic CAD drawings will not be available to the Contractor. Electronic copies of CAD drawings are only available in Bentley MicroStation format. The Government will provide the files on CD ROM. If the Contractor requires different media, such as floppy disks, the Contractor shall be responsible for all conversions required for their use and associated conversion inaccuracies.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
WAGE DETERMINATION
General Decision Number: WA150094 08/21/2015 WA94
Superseded General Decision Number: WA20140094
State: Washington
Construction Type: Heavy including water and sewer line construction
County: Franklin County in Washington.
HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).
Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/02/2015 1 02/27/2015 2 06/12/2015 3 07/03/2015 4 07/10/2015 5 07/24/2015 6 08/21/2015
CARP9003-001 06/01/2015
Rates Fringes
CARPENTER (Including Form Work)............................$ 31.94 14.00
MILLWRIGHT.......................$ 41.86 14.49
PILEDRIVERMAN....................$ 32.97 14.00
ZONE PAY:
ZONE 1 0-45 MILES FREE
ZONE 2 46-65 MILES $2.00/PER HOUR
ZONE 3 66-100 MILES $3.00/PER HOUR
ZONE 4 OVER 100 MILES $4.50/PER HOUR
DISPATCH POINTS:
PASCO (515 N. Neel Street) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
SPOKANE (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
WENATCHEE (27 N. CHELAN) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
MOSCOW (302 N. JACKSON) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
ELEC0112-014 06/01/2015
Rates Fringes
ELECTRICIAN......................$ 38.80 18.59
ENGI0370-022 06/01/2015
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 26.16 13.55
GROUP 2.....................$ 26.48 13.55
GROUP 3.....................$ 27.09 13.55
GROUP 4.....................$ 27.25 13.55
GROUP 5.....................$ 27.41 13.55
GROUP 6.....................$ 27.69 13.55
GROUP 7.....................$ 27.96 13.55
GROUP 8.....................$ 29.06 13.55
ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00
Zone 1: Within 45 mile radius of Spokane, Pasco, Washington;
Lewiston, Idaho
Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Rollers, all types on subgrade, including seal and chip coatings; Drill Assistant; Crane Oiler
GROUP 2: Fork Lift; Broom/Sweeper
GROUP 3: Bulldozer (up to D-6 or equivalent); Boring Machine
GROUP 4: Oiler; Drill (churn, core, calyx or diamond);
Loaders (overhead & front-end, under 4 yds. R/T)
GROUP 5: Backhoe (Under 45,000 gw); Trackhoe/Excavator (under 3/4 yd.); Drilling equipment (8 unch bit and over) (robbins, reverse circulation and similar); Piledriver;
Grade Checker; Boom Truck (Under 25 tons)
GROUP 6: Asphalt Roller; Backhoe (45,000 gw and over to 110,000 gw); Trackhoe/Excavator (3/4 yd. to 3 yd.), Bulldozer, 834 R/T & similar; Mechanic; Paver; Scraper;
Screed; Loader Operator (front-end & overhead, 4 yds. incl.
8 yds.)
GROUP 7: Backhoe (Over 110,000); Trackhoe/Excavator (3 yds & over); Grader/Blade; Loaders (overhead & front-end, over 8 yds. to 10 yds.)
GROUP 8: Loaders (overhead and front-end, 10 yards and over)
BOOM PAY: (All Cranes, Including Tower) 180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale
NOTE:
In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.
HAZMAT:
Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.
IRON0014-012 07/01/2015
Rates Fringes
IRONWORKER (Ornamental, Reinforcing and Structural)......$ 32.76 23.19
LABO0238-014 06/01/2013
Rates Fringes
LABORER: Mason Tender - Brick...$ 24.10 10.65
LABO0238-015 06/01/2013
Rates Fringes
LABORER (Pasco)
GROUP 1.....................$ 21.70 10.65
GROUP 2.....................$ 23.80 10.65
GROUP 3.....................$ 24.07 10.65
GROUP 4.....................$ 24.34 10.65
Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00
BASE POINTS: Spokane, Pasco, Lewiston
Zone 1: 0-45 radius miles from the main post office.
Zone 2: 45 radius miles and over from the main post office
LABORERS CLASSIFICATIONS
GROUP 1: Flagger
GROUP 2: Common or General Laborer; Form-Stripping
GROUP 3: Mason Tender-Cement/Concrete
GROUP 4: Grade Checker; High Scaler; Handheld Drill
PAIN0005-003 07/01/2015
Rates Fringes
PAINTER (Brush, Roller, and Spray.)..........................$ 23.05 10.85
* PLAS0072-008 06/01/2015
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 27.01 12.59
Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00
BASE POINTS: Spokane, Pasco, Lewiston, Wenatchee
Zone 1: 0 - 45 radius miles from the main post office
Zone 2: 45 radius miles from the main post office
TEAM0690-005 01/01/2014
Rates Fringes
Truck drivers: (ANYONE
WORKING ON HAZMAT JOBS SEE
FOOTNOTE A BELOW)
ZONE 1:PASCO ZONE CENTER
GROUP 4....................$ 25.39 15.19
GROUP 5....................$ 25.50 15.19
GROUP 6....................$ 25.50 15.19
Zone Differential (Add to Zone 1 rate: Zone 1 + $2.00)
BASE POINTS: Spokane, Moses Lake, Pasco, Lewiston
Zone 1: 0-45 radius miles from the main post office Zone 2: Outside a 45 mile radius from the main post office
TRUCK DRIVERS CLASSIFICATIONS
GROUP 4: Water Truck (0-8,000 gallons)
GROUP 5: Semi-Trailer Truck
GROUP 6: Water Truck (8,001-14,000 Gallons)
FOOTNOTE A - Anyone working on a HAZMAT job, where HAZMAT cerfification is required, shall be compensated as a premium, in addition to the classification working in as follows:
LEVEL C-D: - $.50 PER HOUR - This level may use an air purifying respirator or additional protective clothing.
LEVEL A-B: - $1.00 PER HOUR - Uses supplied air in conjunction with a chemical splash suit or fully encapsulated suit with a self-contained breathing apparatus.
Employees shall be paid Hazmat pay in increments of four(4) and eight(8) hours.
SUWA2009-060 08/07/2009
Rates Fringes
CARPENTER, Excludes Form Work....$ 23.54 4.99
LABORER: Landscape & Irrigation.......................$ 12.27 2.73
LABORER: Pipelayer..............$ 19.28 0.00
OPERATOR: Asphalt Plant.........$ 34.14 0.68
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 10.63 0.00
OPERATOR: Crane.................$ 23.42 5.54
OPERATOR: Power Shovel..........$ 25.12 7.83
TRUCK DRIVER, Includes Dump Truck............................$ 27.67 0.00
TRUCK DRIVER: Flatbed Truck.....$ 22.74 6.29
TRUCK DRIVER: Lowboy Truck......$ 22.89 5.72
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 18 PAGES
Ice Harbor D/S Gate Operating Machinery Replacement
01 11 01.00 28 SD-01 Preconstruction Submittals
1.7 I CProperty Management Plan
1.8 I CEquipment List
1.12 I CPre-Work Survey
1.16 I CProject Superintendent
SD-07 Certificates
1.17 G CKey Personnel Substitution
SD-11 Closeout Submittals
1.12 I CPost-Work Survey
1.14 G CTraining Manuals
01 14 00.10 28 SD-01 Preconstruction Submittals
1.5 G SLEAccess To Automated
Information Systems
1.2 G MEGate Stabilization and Protection
Plan 01 14 00.90 28 SD-01 Preconstruction Submittals
1.2 I SLEAnti Terrorism (AT) Level 1
1.4 I SLEiWATCH And/Or CORPS
WATCH Training
1.5 I SLELevel 1 OPSEC training
1.6 I SLEPre-Screening Of Contractor
Employees 01 32 01.00 28 SD-01 Preconstruction Submittals
1.3 G CQualifications
3.4.1 G CInitial Project Schedule
3.4.2 G CPeriodic Schedule Updates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 18 PAGES
Ice Harbor D/S Gate Operating Machinery Replacement
01 32 01.00 28 3.4.3 I CWeekly Schedule Updates 01 35 29.10 28 SD-01 Preconstruction Submittals
1.6 G CAccident Prevention Plan (APP)
1.6.1 G CFall Protection and Prevention
(FP&P) Plan
3.3.7 G CRescue and Evacuation Plan
1.7 G CActivity Hazard Analysis (AHA)
1.8 G CSafe Clearance
1.8 G CAuthorized Individuals
1.6.1 G CCrane Critical Lift Plan
1.5.1.3 I CCrane Operators
1.5.1.4 I CRiggers
1.5.1.5 G STCrane Wheel And Outrigger
Loading Diagram And Deck Protection For Outriggers
1.6.1 G CConfined Space Entry Plan
1.12.4 I CCertificate of Compliance
1.6.1 G ECCLead Compliance Plan
1.6.1 G SOAsbestos Hazard Abatement
Plan SD-06 Test Reports
1.12.1 I CAccident Reports
1.12.2 I CMonthly Exposure Reports
1.12.3 I CCrane Reports
SD-07 Certificates
1.9 I CConfined Space Entry Permit
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 18 PAGES
Ice Harbor D/S Gate Operating Machinery Replacement
01 35 29.10 28 1.9 I CHot work permit 01 45 04.00 28 SD-01 Preconstruction Submittals
3.2 G CContractor Quality Control (CQC)
Plan
01 55 10.00 28 SD-01 Preconstruction Submittals
1.5 G STTransport Loading Diagrams
1.6 I CDust Control Plan
1.7 I Cdocumentation and permits
01 57 20.00 28 SD-01 Preconstruction Submittals
1.7 G ECCEnvironmental Protection Plan
1.7.2 G ECCPlan For Concrete On-Site Wash
Area 01 74 19 SD-01 Preconstruction Submittals
1.5 I ECCWaste Management Plan
SD-11 Closeout Submittals
1.6 I ECCRecords
01 78 00.00 28 SD-03 Product Data
3.1.1 G CWarranty Management Plan
SD-04 Samples
3.1.4 G CMock Up Sample
SD-11 Closeout Submittals
3.2 G CPreliminary Versions of
Contractor Prepared Drawings
3.3 G CFinal Approved Versions of
Contractor Prepared Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 18 PAGES
Ice Harbor D/S Gate Operating Machinery Replacement
01 78 00.00 28 3.4 G CPreliminary As-Built Contract Drawings
3.5 G CAs-Built Contract Drawings and
FIO Drawings
3.6 G CFinal As-Built Contract Drawings
01 78 23.00 28 SD-10 Operation and Maintenance
Data
1.2.2 G CPreliminary O&M Manuals and
Parts Catalogs
1.2.2 G CDraft O&M Manuals and Parts
Catalogs SD-11 Closeout Submittals
1.2.2 G CFinal O&M Manuals and Parts
Catalogs
02 41 00.00 28 SD-07 Certificates
1.2.1 G CDemolition Plan
1.6 G CNotification
02 82 13.01 28 SD-01 Preconstruction Submittals
1.9.1 G SOAsbestos Hazard Abatement
Plan SD-06 Test Reports
1.9.3 G SOAir Sampling Results
SD-07 Certificates
1.9.2 G SOQualification
1.9.4 G ECCMandatory Waste Shipment
Record
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 18 PAGES
Ice Harbor D/S Gate Operating Machinery Replacement
02 83 33.13 28 SD-01 Preconstruction Submittals
1.5 G SOQualified Personnel
SD-03 Product Data
3.1.1 G ECCMetal Binding Product
SD-06 Test Reports
1.3.2 G SOTest Results
SD-07 Certificates
1.3.2 G SOTesting Laboratory
3.2.2.1 I ECCSalvaged Material Containing
Contaminated Waste
3.2.2.1 I ECCCopies of Notifications
03 30 10.00 28 SD-03 Product Data
2.1.1 G STNonshrink Grout
SD-05 Design Data
1.3.1 G STUndercut Concrete Anchors
SD-06 Test Reports
3.8.1 G ECTests Results
SD-07 Certificates
1.4.1 G ECExisting Steel Location Method
3.5.1 G ECQuality Control Individual For
Epoxy Or Vinylester Anchor Installation
03 60 00 SD-03 Product Data
1.1 G AEGrout
SD-06 Test Reports
2.2.2 G AECompressive Strength
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G4EDDMTJ
Line
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 18 PAGES
Ice Harbor D/S Gate Operating Machinery Replacement
03 60 00 SD-07 Certificates
1.1 G AEGrout
03 65 00 SD-03 Product Data
3.2 G AEEpoxy Grout
SD-07 Certificates
1.1 G AEGrout
05 05 23 SD-03 Product Data
1.5 G CWelding Procedure Qualifications
1.5.5 G CWelder, Welding Operator, and
Tacker Qualification
1.5.6 G CInspector Qualification
1.5.2 G CPrevious Qualifications
1.5.3 G CPre-qualified Procedures
SD-06 Test Reports
3.2 G CQuality Control
3.3.1 G CNondestructive Examination
SD-07 Certificates
1.5.1 G CCertified Welding Procedure
Specifications (WPS)
1.5.1 G CCertified Procedure Qualification
Records (PQR)
1.5.1 G CCertified Welder Performance
Qualifications (WPQ) 05 50 01.00 28 SD-01 Preconstruction Submittals
1.3.1 G STFabrication Shop Drawings
05 50 13 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 18 PAGES
Ice Harbor D/S Gate Operating Machinery Replacement
05 50 13 1.2.1 G AEequipment supports and miscellaneous metals
2.3 G AEAngles And Plates
07 56 00.00 28 SD-02 Shop Drawings
1.8 G EAMembrane Shop Drawings
SD-03 Product Data
2.1 G EAFluid-applied Membrane and
Flashing
2.3 G EAMembrane primer
2.7 I EAElastomeric Sealant
2.2 I EAMembrane Reinforcing Fleece
3.3 I EASolvent
SD-04 Samples
1.7.1 G EASample Warranty
SD-06 Test Reports
3.1.1 G CAdhesion Testing for Substrates
to Receive Resin Materials SD-07 Certificates
1.4.1 G EAQualification of Manufacturer
1.4.2 G EAQualification of Applicator
SD-08 Manufacturer’s Instructions
1.9 I EASurface preparation, Primer, and
Fluid-applied membrane SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 18 PAGES
Ice Harbor D/S Gate Operating Machinery Replacement
07 56 00.00 28 2.1 G EAFluid-Applied Membrane And Flashing
SD-11 Closeout Submittals
1.7 G CWarranty
3.6 G CInformation Card
3.5 G CInstructions To Government
Personnel 09 90 00 SD-03 Product Data
1.3.2 G AECertification
2.1 G AECoating
2.1 G AEManufacturer's Technical Data
Sheets
2.1 G AEMaterials
SD-04 Samples
1.9 G AEColor
SD-06 Test Reports
1.4.1.2 G AEQualification Testing
SD-07 Certificates
1.3 G AEApplicator's qualifications
SD-08 Manufacturer’s Instructions
3.2.1 G AEApplication instructions
3.4.2 G AEMixing
1.7.2 G AEManufacturer's Material Safety
Data Sheets SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 18 PAGES
Ice Harbor D/S Gate Operating Machinery Replacement
09 90 00 2.1 G AECoatings 26 05 26.00 28 SD-03 Product Data
2.1 I ELGround Conductors
26 08 00 SD-06 Test Reports
3.1 G ELAcceptance tests and inspections
SD-07 Certificates
1.4.1 G ELQualifications
1.4.3 G ELAcceptance test and inspections
procedure 26 20 00 SD-03 Product Data
2.10 G AEReceptacles
2.9 G AECircuit breakers
2.8 G AESwitches
2.11 G AEMini-Power Center
2.15 G ELField Fabricated Nameplates
2.2 G AEConduit and Fittings
3.1.5.1 G AEWires and Cables
2.13 G AEGrounding and Bonding
Equipment
2.6 G AESplices and Termination
Components
2.4 G AECabinets, Junction Boxes, and
Pull Boxes SD-06 Test Reports
3.5.2 G EL600-volt wiring test
3.5.5 G AEGrounding System Test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 18 PAGES
Ice Harbor D/S Gate Operating Machinery Replacement
26 20 00 3.5.4 G AEGround-Fault Receptacle Test
3.5.3 G AETransformer Tests
SD-09 Manufacturer’s Field Reports
2.18.1 G AETransformer factory tests
SD-10 Operation and Maintenance Data
1.5.1 G ELElectrical Systems
26 24 19.00 40 SD-02 Shop Drawings
2.4.1 G AEShop Drawings
2.4 G AEMotor Control Center
1.2 G AESwitchboards
2.3.4.2 G AEDrawings
SD-03 Product Data
1.4 G AEEquipment
SD-06 Test Reports
2.5 I ELFactory Test Procedures
2.5.1.4 I ELFactory Test Results
SD-08 Manufacturer’s Instructions
1.2 G AEMotor Control Units
1.2 G AEProtective Devices
SD-11 Closeout Submittals
3.3 I ELWarranty
26 29 23 SD-02 Shop Drawings
1.5.1 G AESchematic diagrams
1.5.2 G AEInterconnecting diagrams
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 18 PAGES
Ice Harbor D/S Gate Operating Machinery Replacement
26 29 23 1.5.3 G AEInstallation drawings SD-03 Product Data
2.1 G AEVariable frequency drives
2.2 G AEHarmonic Filter
1.5.2 G AEEnclosures
2.5 G AEDynamic Braking Resistor
1.5.4 G AEEquipment schedule
2.4 G AEWires And Cables
SD-06 Test Reports
3.2.1 G ELVFD Test
3.2.2 G ELPerformance Verification Tests
SD-08 Manufacturer’s Instructions
1.5.5 I ELInstallation instructions
SD-09 Manufacturer’s Field Reports
2.7.1 G ELVFD Factory Test Plan
1.5.6 G ELFactory test results
SD-10 Operation and Maintenance Data
2.1 G ELVariable frequency drives
26 60 13.00 40 SD-01 Preconstruction Submittals
1.2.1 I ELSample Warranty
1.2.1 G AEEquipment and Performance
Data
1.2.1 I ELManufacturer's Instructions
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 18 PAGES
Ice Harbor D/S Gate Operating Machinery Replacement
26 60 13.00 40 1.2.1 G AEInformational Drawings SD-03 Product Data
2.4 G AEMotor Enclosures
1.2.1 G AERotor Bars
1.2.1 G AEStator Slots
1.2.1 G AERotational Speed
1.2.1 G AECooling Fan Blades
1.2.1 G AEBearing Manufacturer
1.2.1 G AEBearing Style
1.2.1 G AEBearing Type
1.2.1 G AESCR Firing Frequencies
SD-07 Certificates
2.6 G AEFactory Test Results
2.1.2.2 G AEEfficiency
2.6 G AEPower-Factor
2.5 G AEService Factor
2.3 G AETemperature Rating
2.6 G AENoise
2.1.2.1 G AEFull-Load
2.6 G AELocked-Rotor
2.6 G AEInsulation Resistance
2.6 G AEWinding Resistance
2.6 G AEHigh-Potential Tests
SD-08 Manufacturer’s Instructions
2.1.2 I ELMotors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 18 PAGES
Ice Harbor D/S Gate Operating Machinery Replacement
26 60 13.00 40 SD-10 Operation and Maintenance Data
3.5 G ELOperating and Maintenance
Manual
SD-11 Closeout Submittals
3.6 I ELWarranty
35 01 43.00 28 SD-01 Preconstruction Submittals
1.4.1 I AEMaterial Orders
1.4.2 G AEWire Rope Untensioning and
Retensioning Procedure
3.14.4 G AEWire Rope Untensioning and
Retensioning Procedure
1.4.3 G AEWire Rope Load Balancing
Procedure
1.4.4 G AECounterweight Load Balancing
Procedure
1.4.6 G AERing Gear Installation Procedure
1.4.6 G AEPinion and Pinion Shaft
Installation Procedure
1.4.6 G AEPinion Shaft, Gearbox, and VFD
Motor Alignment Procedure
1.4.6 G AERing and Pinion Gear Alignment
Procedure
1.4.5 G MEDrum/Gear/Shaft Aligning
Procedure
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 18 PAGES
Ice Harbor D/S Gate Operating Machinery Replacement
35 01 43.00 28 1.4.6 G MEDrum/Gear/Shaft Aligning Procedure
1.4.7 G AERing Gear Weld Procedures
Specification (WPS)
1.4.7 G AERing Gear WPS Qualification
Report
1.4.7 G AERing Gear Welder Qualifications
3.14.2 G AETesting Personnel
SD-02 Shop Drawings
2.2.3 G AERing Gear
1.4.8 G AEPinion and Pinion Shaft
1.4.8 G AEFriction Sheave Shaft
1.4.8 G AEAll Misc Equipment Supports or
Base Plates
1.4.1 G AEPinion Bearings
SD-03 Product Data
1.4.1 G AEBrake
1.4.1 G MEBrake Enclosure
1.4.1 G AEShaft Couplings
1.4.1 G AESheave Bearings
1.4.1 G AESheave Bearing Seals
1.4.8 G AEPinion Bearings and Housings
SD-06 Test Reports
1.4.9 I MERing and Pinion Gear Initial
Condition Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 18 PAGES
Ice Harbor D/S Gate Operating Machinery Replacement
35 01 43.00 28 1.4.9 I MEInitial Position and Overtravel Limit report
3.8.2.2 G AESheave Bearing Installation
Measurements Report
3.8.2.3 G AESheave Bearing Installation
Measurements Report
3.14.7 G AELoad Balancing Report
3.10 G AEShaft Alignment Report
1.4.9 G AEDynamic Balancing Report
1.4.9 G AEDrum/Ring/Pinion Gear
Alignment Report
3.14.5 G AEDrum/Ring/Pinion Gear
Alignment Report
3.15 G AEDrum/Ring/Pinion Gear
Alignment Report
1.4.9 I MEWire Rope Inspection Report
40 95 00 SD-02 Shop Drawings
2.2.3 G AEBill of materials
2.1.1 G AEControl Panels
2.7.9.1 G AEHMI display layouts
2.6 G AEPLC Software
SD-03 Product Data
3.5 G AEControl…
This is the start of the file's text. The full file is on GovTribe.