Amendment_0008.pdf
PDF 2 MB Posted
- Solicitation number
- W912EF-15-R-0034
About this file
Amendment 0008
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0009.pdf | ||
| Amendment_0007.pdf | ||
| Amendment_0006.pdf | ||
| Amendment_0005.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| Amendment_0002.pdf | ||
| SITE_VISIT_ATTENDEES_15-R-0034.pdf | ||
| Amendment_0001.pdf | ||
| Site_Visit_Information.pdf | ||
| W912EF-15-R-0034.pdf | ||
| FIO.pdf | ||
| Plans-Signed.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV50490372
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
TITLE: Walla Walla District Headquarters HVAC and Server Room Upgrades
The purpose of this amendment is to make the changes indicated in the Summary of Changes.
The proposal due date of August 14, 2015 at 1:00 p.m. remains unchanged.
(Be advised, you should anticipate significant vehicle and pedestrian traffic in and around Walla Walla on Friday afternoon as a result of a large concert in the area. You should plan extra time to bring your proposal to the district headquarters if you intend to submit your proposal via personal delivery.)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 10
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Aug-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-15-R-0034
X 9B. DATED (SEE ITEM 11)
19-Jun-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Aug-2015
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
JANI C. LONG
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF-15-R-0034
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1. Revised the following Drawings:
See [ Bracketed Areas ] on drawings Sheet MH606 Sheet MH607 Sheet MI601 Sheet E-611 Sheet E-620
SECTION 00700 - CONTRACT CLAUSES
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Drawing Number
Sheet Number
Title
Revision Number
Date
Walla Walla District Head Quarters HVAC and Server Room Upgrades
GENERAL
WWD-1-67/1 G-001 COVER SHEET AND LOCATION MAPS
WWD-1-67/2 G-002 SHEET INDEX I
WWD-1-67/3 G-003 SHEET INDEX II
WWD-1-67/4 G-004 ABBREVIATIONS
WWD-1-67/5 G-005 PROJECT LEGEND
ARCHITECTURAL
WWD-1-67/10 AD111
WALL OPENING LOCATIONS - PARTIAL FIRST
FLOOR - DEMOLITION
WWD-1-67/11 AD121
WALL OPENING LOCATION - PARTIAL
SECOND FLOOR - DEMOLITION
WWD-1-67/12 AD131
WALL OPENING LOCATIONS - PARTIAL THIRD
FLOOR - DEMOLITION
WWD-1-67/13 AD132
EXISTING CONDITION PHOTOS - COMPUTER
ROOM - DEMOLITION
WWD-1-67/14 AD141
REFLECTED CEILING PLAN - FIRST FLOOR -
DEMOLITION
WWD-1-67/15 AD142
REFLECTED CEILING PLAN - SECOND FLOOR
- DEMOLITION
WWD-1-67/16 AD143
REFLECTED CEILING PLAN - THIRD FLOOR -
WWD-1-67/17 AE131 FLOOR PLAN - THIRD FLOOR - NEW WORK
WWD-1-67/18 AE431
ENLARGED FLOOR PLAN - SERVER ROOM &
OPEN OFFICE - NEW WORK
WWD-1-67/19 AE432
ENLARGED REFLECTED CEILING PLAN -
SERVER ROOM & OFFICE - NEW WORK
WWD-1-67/20 AE433
INTERIOR ELEVATIONS - SERVER ROOM -
NEW WORK
WWD-1-67/21 AE501
PARTITION DETAILS - SERVER ROOM - NEW
WORK
WWD-1-67/22 AE601
DOOR SCHEDULE, ELEVATION, DETAILS -
SERVER ROOM - NEW WORK
FIRE PROTECTION
WWD-1-67/23 F-430
FIRE PROTECTION - PARTIAL THIRD FLOOR
PLAN - COMPUTER AREA
WWD-1-67/24 FA430
FIRE ALARM - PARTIAL THIRD FLOOR PLAN -
COMPUTER AREA
WWD-1-67/25 FX110 FIRE PROTECTION PLAN - EXISTING FIRST
FLOOR
WWD-1-67/26 FX120
FIRE PROTECTION PLAN - EXISTING SECOND
WWD-1-67/27 FX130
FIRE PROTECTION PLAN - EXISTING THIRD
WWD-1-67/28 FX430
FIRE SPRINKLER - PARTIAL THIRD FLOOR
PLAN - COMPUTER AREA
ELECTRICAL
WWD-1-67/29 M-001 LEGEND
WWD-1-67/30 MD111
PARTIAL MECHANICAL PLAN - FIRST FLOOR
DEMOLITION - AREA A
WWD-1-67/31 MD112
DEMOLITION - AREA B
WWD-1-67/32 MD121
PARTIAL MECHANICAL PLAN - SECOND
FLOOR DEMOLITION - AREA A
WWD-1-67/33 MD122
FLOOR DEMOLITION - AREA B
WWD-1-67/34 MD131
PARTIAL MECHANICAL PLAN - THIRD FLOOR
WWD-1-67/35 MD132
WWD-1-67/36 MD141
PARTIAL MECHANICAL PLAN - ROOF LEVEL
WWD-1-67/37 MD142
WWD-1-67/38 MD401
ENLARGED MECHANICAL DEMOLITION PLAN
- FIRST FLOOR MECHANICAL ROOM
WWD-1-67/39 MF110 HVAC PHASING PLAN - FIRST FLOOR
WWD-1-67/40 MF120 HVAC PHASING PLAN - SECOND FLOOR
WWD-1-67/41 MF130 HVAC PHASING PLAN - THIRD FLOOR
WWD-1-67/42 MH111
NEW WORK - AREA A
WWD-1-67/43 MH112
NEW WORK - AREA B
WWD-1-67/44 MH121
FLOOR NEW WORK - AREA A
WWD-1-67/45 MH122
FLOOR NEW WORK - AREA B
WWD-1-67/46 MH131
WWD-1-67/47 MH132
WWD-1-67/48 MH141
WWD-1-67/49 MH142
WWD-1-67/50 MH401
ENLARGED MECHANICAL NEW WORK PLAN -
FIRST FLOOR MECHANICAL ROOM
WWD-1-67/78 MP111
PARTIAL MECHANICAL PIPING PLAN - FIRST
WWD-1-67/79 MP112
PARTIAL MECHANICAL PIPING PLAN - FIRST
WWD-1-67/80 MP121
PARTIAL MECHANICAL PIPING PLAN -
SECOND FLOOR NEW WORK - AREA A
WWD-1-67/81 MP122
PARTIAL MECHANICAL PIPING PLAN -
SECOND FLOOR NEW WORK - AREA B
WWD-1-67/82 MP131
PARTIAL MECHANICAL PIPING PLAN - THIRD
WWD-1-67/83 MP132
PARTIAL MECHANICAL PIPING PLAN - THIRD
WWD-1-67/51 MH500 MECHANICAL DETAILS I
WWD-1-67/52 MH501 MECHANICAL DETAILS II A 8-6-15
WWD-1-67/53 MH510 MECHANICAL DETAILS III
WWD-1-67/54 MH511 MECHANICAL DETAILS IV
WWD-1-67/55 MH520 MECHANICAL DETAILS V
WWD-1-67/56 MH521 MECHANICAL DETAILS VI
WWD-1-67/57 MH600 MECHANICAL SCHEDULES I
WWD-1-67/58 MH601 MECHANICAL SCHEDULES II
WWD-1-67/59 MH602 MECHANICAL SCHEDULES III
WWD-1-67/60 MH603 MECHANICAL SCHEDULES IV
WWD-1-67/61 MH604 MECHANICAL SCHEDULES V A 7-21-15
WWD-1-67/62 MH605 MECHANICAL SCHEDULES VI
WWD-1-67/63 MH606 MECHANICAL SCHEDULES VII A 8-11-15
WWD-1-67/64 MH607 MECHANICAL SCHEDULES VIII A 8-11-15
WWD-1-67/65 MI600 MECHANICAL CONTROLS LEGEND
WWD-1-67/66 MI601 MECHANICAL CONTROLS I A 8-11-15
WWD-1-67/67 MI602 MECHANICAL CONTROLS II
WWD-1-67/68 MI603 MECHANICAL CONTROLS III
WWD-1-67/69 MI604 MECHANICAL CONTROLS IV
WWD-1-67/70 MI605 MECHANICAL CONTROLS V
WWD-1-67/71 MI606 MECHANICAL CONTROLS VI
WWD-1-67/72 MI607 MECHANICAL CONTROLS VII
WWD-1-67/73 MI608 MECHANICAL CONTROLS VIII
WWD-1-67/74 MI609 MECHANICAL CONTROLS IX
WWD-1-67/75 MI610 MECHANICAL CONTROLS X
WWD-1-67/76 MI611 MECHANICAL CONTROLS XI
WWD-1-67/77 MI612 MECHANICAL CONTROLS XII
ELECTRICAL
WWD-1-67/84 E-001 ELECTRICAL LEGEND
WWD-1-67/90 ED111
PARTIAL ELECTRICAL PLAN - FIRST FLOOR -
DEMOLITION AREA A
WWD-1-67/91 ED112
PARTIAL ELECTRICAL PLAN - FIRST FLOOR
WWD-1-67/92 ED121
PARTIAL ELECTRICAL PLAN - SECOND
FLOOR DEMOLITION - AREA A
WWD-1-67/93 ED122
PARTIAL ELECTRICAL PLAN - SECOND
FLOOR DEMOLITION - AREA B
WWD-1-67/94 ED131
PARTIAL ELECTRICAL PLAN - THIRD FLOOR
WWD-1-67/95 ED132
PARTIAL ELECTRICAL PLAN - THIRD FLOOR
WWD-1-67/96 ED141
PARTIAL ELECTRICAL PLAN - ROOF LEVEL
WWD-1-67/97 ED142
WWD-1-67/98 ED430
ENLARGED SERVER ROOM - DEMOLITION
PLAN
WWD-1-67/99 ED601
ELECTRICAL ONE-LINE DIAGRAM -
WWD-1-67/100 ED602
ELECTRICAL ONE-LINE DIAGRAM -
WWD-1-67/101 EP111
PARTIAL POWER PLAN - FIRST FLOOR NEW
WORK - AREA A
WWD-1-67/102 EP112
PARTIAL POWER PLAN - FIRST FLOOR NEW
WORK - AREA B
A 7/28/15
WWD-1-67/103 EP121
PARTIAL POWER PLAN - SECOND FLOOR
WWD-1-67/104 EP122
PARTIAL POWER PLAN - SECOND FLOOR
WWD-1-67/105 EP131
PARTIAL POWER PLAN - THIRD FLOOR NEW
WORK - AREA A
WWD-1-67/106 EP132
PARTIAL POWER PLAN - THIRD FLOOR NEW
WORK - AREA B
WWD-1-67/107 EP141
WWD-1-67/108 EP142
PARTIAL POWER PLAN - ROOF LEVEL NEW
WORK - AREA B
WWD-1-67/109 EP601 ELECTRICAL ONE-LINE DIAGRAM
WWD-1-67/110 EP602 ELECTRICAL ONE-LINE DIAGRAM A 7/28/15
WWD-1-67/85 E-430
ENLARGED SERVER ROOM - NEW LIGHTING
AND POWER PLANS
WWD-1-67/86 E-610 ELECTRICAL PANEL SCHEDULES
WWD-1-67/87 E-611 ELECTRICAL PANEL SCHEDULES A 8-11-15
WWD-1-67/88 E-612 ELECTRICAL PANEL SCHEDULES
WWD-1-67/89 E-620 MECHANICAL CONNECTION SCHEDULE A 8-11-15
FOR INFORMATION ONLY (FIO)
The Government does not warrant the accuracy of the FIO drawings. The Government recommends that the Contractor verify the accuracy of FIO drawings.
WWD-1-21/79 FIO001 GENERAL STRUCTURAL NOTES
WWD-1-21/80 FIO002 FOUNDATION PLAN
WWD-1-21/81 FIO003 RECESSED SLAB & JT LOCATION PLAN
WWD-1-21/82 FIO004 SHEAR WALL FOUNDATION PLANS
WWD-1-21/83 FIO005 FOUNDATION SECTION AND DETAILS
WWD-1-21/84 FIO006 FOUNDATION SECTION AND DETAILS
WWD-1-21/85 FIO007 SECOND FLOOR FRAMING PLAN
WWD-1-21/87 FIO008 ROOF FRAMING PLAN
WWD-1-21/88 FIO009 SHEAR WALL ELEVATIONS
WWD-1-21/89 FIO010 SHEAR WALL ELEVATIONS
WWD-1-21/90 FIO011 WALL SECTIONS
WWD-1-21/91 FIO012 WALL SECTIONS AND DETAILS
WWD-1-21/92 FIO013 MISCELLANEOUS SECTIONS AND DETAILS
WWD-1-21/93 FIO014 FRAMING DETAILS
WWD-1-21/94 FIO015 FRAMING AND BRICK SUPPORT DETAILS
FIO016 FRAMING DETAILS II
WWD-1-21/95 FIO017 BRICK VENEER SUPPORT DETAILS
WWD-1-21/96 FIO018 BRICK VENEER SUPPORT DETAILS
WWD-1-21/97 FIO019 PRECAST PANEL PLAN AND SECTIONS
WWD-1-21/98 FIO020 PRECAST PANEL ELEVATIONS
WWD-1-21/99 FIO021 PRECAST PANEL CONNECTION DETAILS
WWD-1-21/100 FIO022 STAIR PLAN, SECTIONS AND DETAILS
WWD-1-21/101 FIO023 COVERED PARKING STRUCTURE
WWD-1-21/102 FIO024 EXTERIOR PLANTERS
WWD-1-21/103 FIO025 RETAINING STRUCTURES
WWD-1-21/104 FIO026 MILL CREEK IMPROVEMENTS
WWD-1-21/16 FIO027 FIRST FLOOR PLAN
WWD-1-21/17 FIO028 SECOND FLOOR PLAN
WWD-1-21/18 FIO029 THIRD FLOOR PLAN
WWD-1-21/20 FIO030 BUILDING ELEVATIONS SOUTH AND WEST
WWD-1-21/21 FIO031 BUILDING SECTIONS
WWD-1-21/22 FIO032 WALL SECTIONS AND DETAILS
WWD-1-21/26 FIO033 DETAILS DOOR AND LOUVER
WWD-1-21/30 FIO034 WINDOW/STOREFRONT DETAILS
WWD-1-21/31 FIO035 ROOF PLAN
WWD-1-21/32 FIO036 ROOF DETAILS I
WWD-1-21/33 FIO037 ROOF DETAILS II
WWD-1-21/41 FIO038
LARGE SCALE MISC. PLANS, LOBBY, -
LUNCHROOM, COMPUTER - DAYCARE
(FUTURE CONSTRUCTION)
WWD-1-21/44 FIO039
INTERIOR ELEVATIONS II, CONFERENCE -
ROOMS, CORRIDOR, DISBURSING
WWD-1-21/48 FIO040
INTERIOR WALL DETAILS I, - PARTITION
TYPES/DETAILS
WWD-1-21/52 FIO041 REFLECTED CEILING PLAN, THIRD FLOOR
WWD-1-21/69 FIO042 FIRE RATED WALL PLAN
WWD-1-21/70 FIO043
FIRST FLOOR SPACE PLANNING, -
WORKSTATIONS/FURNITURE
WWD-1-21/71 FIO044
SECOND FLOOR SPACE PLANNING, -
WWD-1-21/72 FIO045
THIRD FLOOR SPACE PLANNING, -
WWD-1-21/76 FIO046
ACCESS FLOOR/RECESSED SLAB, THIRD
WWD-1-21/108 FIO047 MECHANICAL EQUIPMENT SCHEDULES
WWD-1-21/119 FIO048 FIRST FLOOR HVAC DUCTWORK PLAN
WWD-1-21/120 FIO049
FIRST FLOOR HVAC HYDRONICS AND DRAIN
WWD-1-21/121 FIO050 SECOND FLOOR HVAC DUCTWORK PLAN
WWD-1-21/122 FIO051
SECOND FLOOR HVAC HYDRONICS AND
DRAIN PLAN
WWD-1-21/123 FIO052 THIRD FLOOR HVAC DUCTWORK PLAN
WWD-1-21/124 FIO053
THIRD FLOOR HVAC HYDRONICS AND DRAIN
WWD-1-21/125 FIO054 HVAC SCHEMATIC & DETAILS
WWD-1-21/126 FIO055 MECHANICAL ROOM PLANS & SECTION
WWD-1-21/129 FIO056 LEGEND AND ABBREVIATIONS
WWD-1-21/131 FIO057 ONE-LINE DIAGRAM
WWD-1-21/132 FIO058 ONE-LINE DIAGRAM - EMERGENCY
WWD-1-21/133 FIO059 SITE PLAN
WWD-1-21/134 FIO060 FIRST FLOOR LIGHTING PLAN
WWD-1-21/135 FIO061 FIRST FLOOR POWER PLAN
WWD-1-21/136 FIO062
FIRST FLOOR HVAC POWER AND
GROUNDING PLAN
WWD-1-21/137 FIO063 FIRST FLOOR SPECIAL SYSTEMS PLAN
WWD-1-21/138 FIO064 SECOND FLOOR LIGHTING PLAN
WWD-1-21/139 FIO065 SECOND FLOOR POWER PLAN
WWD-1-21/140 FIO066
SECOND FLOOR HVAC POWER AND
WWD-1-21/141 FIO067 SECOND FLOOR SPECIAL SYSTEMS PLAN
WWD-1-21/142 FIO068 THIRD FLOOR LIGHTING PLAN
WWD-1-21/143 FIO069 THIRD FLOOR POWER PLAN
WWD-1-21/144 FIO070
THIRD FLOOR HVAC POWER AND
WWD-1-21/145 FIO071 THIRD FLOOR SPECIAL SYSTEMS PLAN
WWD-1-21/146 FIO072 MISCELLANEOUS FLOOR PLANS
WWD-1-21/147 FIO073 MISCELLANEOUS FLOOR PLANS
WWD-1-21/148 FIO074 MISCELLANEOUS PLANS
WWD-1-21/149 FIO075 SPECIAL SYSTEMS RISER DIAGRAMS
WWD-1-21/151 FIO076 CONTROL DIAGRAMS
WWD-1-21/152 FIO077 CONTROL DIAGRAMS
WWD-1-21/153 FIO078 EQUIPMENT ELEVATIONS
WWD-1-21/154 FIO079 DETAILS
WWD-1-21/155 FIO080 DETAILS
WWD-1-21/156 FIO081 DETAILS
WWD-1-21/158 FIO082 DETAILS
WWD-1-21/159 FIO083 DETAILS
WWD-1-21/160 FIO084 PANEL SCHEDULES
WWD-1-21/161 FIO085 PANEL SCHEDULES
WWD-1-21/162 FIO086 PANEL SCHEDULES AND ADDITIVE PLANS
WWD-1-21/163 FIO087 PANEL SCHEDULES
WWD-1-21/164 FIO088 PANEL SCHEDULES
WWD-1-21/165 FIO089 PANEL SCHEDULES
WWD-1-21/166 FIO090 PANEL SCHEDULES
WWD-1-21/167 FIO091 PANEL SCHEDULES
WWD-1-21/9 FIO092 IRRIGATION PLAN
WWD-1-21/19 FIO093 BUILDING ELEVATIONS, NORTH AND EAST
WWD-1-21/20 FIO094 BUILDING ELEVATIONS, SOUTH AND WEST
WWD-1-21/36 FIO095 STAIR SECTIONS/DETAILS
FIO096
FIRE PROTECTION - CONTRACT NO.
DACW68-92-C-0038
FIO097
FIRE PROTECTION - CONTRACT NO.
FIO098 FIRE PROTECTION - CONTRACT NO.
FIO099
SEC.16721, FIRE ALARM SYSTEM - SECOND
FIO100 FIRE ALARM SYSTEM - RISER DIAGRAM
FIO101 FIRST FLOOR PLAN - FIRE ALARM SYSTEM
FIO102 SECOND FLOOR PLAN - FIRE ALARM SYSTEM
FIO103 THIRD FLOOR PLAN - FIRE ALARM SYSTEM
WWD-1-35/3 FIO104
COOLING WATER SYSTEM MODIFICATIONS -
COOLING TOWER PIPE ROUTING PLAN
WWD-1-35/4 FIO105
MISCELLANEOUS PIPE DETAILS
WWD-1-35/5 FIO106
COOLING TOWER SUPPORT STRUCTURE I
WWD-1-35/5.1 FIO107
COOLING TOWER SUPPORT STRUCTURE II
WWD-1-35/5.2 FIO108
ROOF SUPPORT BEAM CONNECTION -
MODIFICATION
WWD-1-35/6 FIO109
PARTIAL ROOF PLAN
WWD-1-35/7 FIO110
GENERAL NOTES AND DETAILS
WWD-1-35/8 FIO111
SYMBOLS, NOTES, SCHEDULES - AND
ABBREVIATIONS
WWD-1-35/10 FIO112
PARTIAL FIRST FLOOR, THIRD AND ROOF -
ELECTRICAL PLAN
WWD-1-35/10 FIO113
PARTIAL FIRST FLOOR, THIRD AND ROOF -
ELECTRICAL PLAN
WWD-1-35/11 FIO114
MECHANICAL ROOM PLANS
WWD-1-35/12 FIO115
COOLING TOWER PIPING DIAGRAM
WWD-1-39/1 FIO116
LIGHTNING PROTECTION DETAILS
FIO117 SHOP DRAWING WWD-40-33-01
(End of drawing list)
(End of clause)
Contract drawings created on CADD will be available in electronic form for use by the Contractor. No For Information Only drawings are available on CADD. The Contractor assumes all risks associated in using electronic CADD drawings. The contract drawings shall govern if there are any discrepancies between the electronic copy and the contract drawing. The Contractor shall promptly notify the Contracting Officer of any discrepancies. The Government will not be responsible to correct the electronic CADD drawing. If contract modifications are issued, the associated electronic CADD drawings will not be available to the Contractor. Electronic copies of CADD drawings are only available in Bentley MicroStation format. The Government will provide the files on CD ROM. If the Contractor requires different media, such as floppy disks, the Contractor shall be responsible for all conversions required for their use and associated conversion inaccuracies.
(End of Summary of Changes)
| Amend-0008_Plans.pdf |
| HQ200FY14bMH606 |
| HQ200FY14bMH607 |
| HQ200FY14bMI601 |
| HQ200FY14bE-611 |
| HQ200FY14bE-620 |
File details come from the government source that posted it. Updated .