CJD_CO2_Fire_Suppression_System_-_REFERENCE_DRAWINGS.pdf
PDF 21 MB Posted
- Attached to
- Chief Joseph Dam CO2 Fire Suppression System Modernization, Bridgeport, WA Federal contract opportunity
- Solicitation number
- W912DW19R0003
About this file
REFERENCE DRAWINGS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DW19R0003-R0002.pdf | ||
| W912DW19R0003-R0001.pdf | ||
| CO2_Site_Visit_Photo_Package_Part_2.pdf | ||
| Access_Hatches_Photos.pdf | ||
| Site_Visit_Sign-in_Sheet.pdf | ||
| Floor_Plans_&_Hatch_Covers.pdf | ||
| CO2_Site_Visit_Photo_Package(1).pdf | ||
| Attachment_B.docx | DOCX document | |
| CJD_CO2_Fire_Suppression_System_-_DRAWINGS.pdf | ||
| CJD_CO2_Fire_Suppression_System_SPECIFICATIONS_-_22_FEB_2019.pdf | ||
| PPQ.docx | DOCX document | |
| Attachment_A.docx | DOCX document | |
| W912DW19R0003_CJD_CO2_SYSTEM_MODERNIZATION.pdf | ||
| Request_for_Visitation_Authority.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR REFERENCE ONLY
File details come from the government source that posted it.