Attachment_A.docx
DOCX document 14 KB Posted
- Attached to
- Chief Joseph Dam CO2 Fire Suppression System Modernization, Bridgeport, WA Federal contract opportunity
- Solicitation number
- W912DW19R0003
About this file
Attachment A to 00 22 00
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DW19R0003-R0002.pdf | ||
| W912DW19R0003-R0001.pdf | ||
| Access_Hatches_Photos.pdf | ||
| CO2_Site_Visit_Photo_Package_Part_2.pdf | ||
| Site_Visit_Sign-in_Sheet.pdf | ||
| Floor_Plans_&_Hatch_Covers.pdf | ||
| CO2_Site_Visit_Photo_Package(1).pdf | ||
| Attachment_B.docx | DOCX document | |
| CJD_CO2_Fire_Suppression_System_-_DRAWINGS.pdf | ||
| CJD_CO2_Fire_Suppression_System_SPECIFICATIONS_-_22_FEB_2019.pdf | ||
| W912DW19R0003_CJD_CO2_SYSTEM_MODERNIZATION.pdf | ||
| CJD_CO2_Fire_Suppression_System_-_REFERENCE_DRAWINGS.pdf | ||
| PPQ.docx | DOCX document | |
| Request_for_Visitation_Authority.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
00 22 00 - ATTACHMENT A
FACTOR A: CORPORATE EXPERIENCE AND CAPABILITIES FOR TOTAL FLOODING TYPE FIRE SUPPRESSION SYSTEM PROJECTS
USE ONE FORM PER PROJECT
Note: A separate Word version of this document will be accessible on fedbizopps at fbo.gov
1. Circle to indicate if work was performed as a Prime Contractor or Subcontractor:
Flooding Type Fire Suppression Prime Subcontractor
2. Name of Offeror: ______________________________________________
3. Project Title: ______________________________________________
4. Contract/Project Number: ______________________________________________
5. Project Location: ______________________________________________
6. Total Contract Value: $ _________________ (Final value if completed, current value if not completed)
7. If Offeror performed as Subcontractor, the $ value of Subcontract: $ ______________
8. Construction Phase Start Date (Month/Year): ____________________________________
9. Construction Phase Completion Date (Month/Year): _______________________________ (Actual date if project has been completed, anticipated date if project is not complete)
10. Name of Customer/Client: ______________________________________________
11. Telephone Number of Customer/Client: _________________________________________
12. Email Address of Customer/Client: ____________________________________________
13. Describe General Scope of the Construction Project: __________________________
14. Describe/demonstrate how the project is relevant to the solicitation in the following areas:
14.1. Describe what type of Total Flooding Fire Suppression System was installed and how it meets criteria A.1:
14.2. Describe what type of facility work was performed at:
14.3. Describe outage coordination during continued facility operation:
14.4. Describe how Offeror minimized impacts to normal facility operations:
14.5. Describe the Offeror’s role and responsibility during construction of the project:
15. Your Performance Evaluation by Customer/Client, if known:
Note: Use of additional pages as necessary to provide sufficient detail to satisfy 00 22 00:
A.1. Replacement or Modification of an existing total flooding type Fire Suppression System with outage coordination during continued facility operation at a powerhouse, power plant, generation station, manufacturing facility or similar industrial facilities.
Describe modification, installation and commissioning of existing total flooding type fire suppression systems in normally operating powerhouses, power plants, generation stations, manufacturing facilities or similar industrial facilities. Contractor shall describe the facility, construction and phasing to clearly demonstrate how the project minimized impacts to normal facility operations.
File details come from the government source that posted it.