Attachment_A.docx

DOCX document 14 KB Posted

Attached to
Chief Joseph Dam CO2 Fire Suppression System Modernization, Bridgeport, WA Federal contract opportunity
Solicitation number
W912DW19R0003
Issued by
Department of the Army Corps of Engineers Engineering District Seattle

About this file

Attachment A to 00 22 00

View the file

Other files for this federal contract opportunity

Other files attached to Chief Joseph Dam CO2 Fire Suppression System Modernization, Bridgeport, WA, newest first.
File Type Posted
W912DW19R0003-R0002.pdf PDF
W912DW19R0003-R0001.pdf PDF
Access_Hatches_Photos.pdf PDF
CO2_Site_Visit_Photo_Package_Part_2.pdf PDF
Site_Visit_Sign-in_Sheet.pdf PDF
Floor_Plans_&_Hatch_Covers.pdf PDF
CO2_Site_Visit_Photo_Package(1).pdf PDF
Attachment_B.docx DOCX document
CJD_CO2_Fire_Suppression_System_-_DRAWINGS.pdf PDF
CJD_CO2_Fire_Suppression_System_SPECIFICATIONS_-_22_FEB_2019.pdf PDF
W912DW19R0003_CJD_CO2_SYSTEM_MODERNIZATION.pdf PDF
CJD_CO2_Fire_Suppression_System_-_REFERENCE_DRAWINGS.pdf PDF
PPQ.docx DOCX document
Request_for_Visitation_Authority.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

00 22 00 - ATTACHMENT A

FACTOR A: CORPORATE EXPERIENCE AND CAPABILITIES FOR TOTAL FLOODING TYPE FIRE SUPPRESSION SYSTEM PROJECTS

USE ONE FORM PER PROJECT

Note: A separate Word version of this document will be accessible on fedbizopps at fbo.gov

1. Circle to indicate if work was performed as a Prime Contractor or Subcontractor:

Flooding Type Fire Suppression Prime Subcontractor

2. Name of Offeror: ______________________________________________

3. Project Title: ______________________________________________

4. Contract/Project Number: ______________________________________________

5. Project Location: ______________________________________________

6. Total Contract Value: $ _________________ (Final value if completed, current value if not completed)

7. If Offeror performed as Subcontractor, the $ value of Subcontract: $ ______________

8. Construction Phase Start Date (Month/Year): ____________________________________

9. Construction Phase Completion Date (Month/Year): _______________________________ (Actual date if project has been completed, anticipated date if project is not complete)

10. Name of Customer/Client: ______________________________________________

11. Telephone Number of Customer/Client: _________________________________________

12. Email Address of Customer/Client: ____________________________________________

13. Describe General Scope of the Construction Project: __________________________

14. Describe/demonstrate how the project is relevant to the solicitation in the following areas:

14.1. Describe what type of Total Flooding Fire Suppression System was installed and how it meets criteria A.1:

14.2. Describe what type of facility work was performed at:

14.3. Describe outage coordination during continued facility operation:

14.4. Describe how Offeror minimized impacts to normal facility operations:

14.5. Describe the Offeror’s role and responsibility during construction of the project:

15. Your Performance Evaluation by Customer/Client, if known:

Note: Use of additional pages as necessary to provide sufficient detail to satisfy 00 22 00:

A.1. Replacement or Modification of an existing total flooding type Fire Suppression System with outage coordination during continued facility operation at a powerhouse, power plant, generation station, manufacturing facility or similar industrial facilities.

Describe modification, installation and commissioning of existing total flooding type fire suppression systems in normally operating powerhouses, power plants, generation stations, manufacturing facilities or similar industrial facilities. Contractor shall describe the facility, construction and phasing to clearly demonstrate how the project minimized impacts to normal facility operations.