Attachment B to 00 22 00
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DW19R0003-R0002.pdf | ||
| CO2_Site_Visit_Photo_Package_Part_2.pdf | ||
| W912DW19R0003-R0001.pdf | ||
| Access_Hatches_Photos.pdf | ||
| Site_Visit_Sign-in_Sheet.pdf | ||
| Floor_Plans_&_Hatch_Covers.pdf | ||
| CO2_Site_Visit_Photo_Package(1).pdf | ||
| CJD_CO2_Fire_Suppression_System_-_REFERENCE_DRAWINGS.pdf | ||
| PPQ.docx | DOCX document | |
| Attachment_A.docx | DOCX document | |
| CJD_CO2_Fire_Suppression_System_-_DRAWINGS.pdf | ||
| CJD_CO2_Fire_Suppression_System_SPECIFICATIONS_-_22_FEB_2019.pdf | ||
| W912DW19R0003_CJD_CO2_SYSTEM_MODERNIZATION.pdf | ||
| Request_for_Visitation_Authority.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
00 22 00 - ATTACHMENT B
FACTOR A: CORPORATE EXPERIENCE AND CAPABILITIES FOR WATER MIST TYPE FIRE SUPPRESSION SYSTEM PROJECTS
USE ONE FORM PER PROJECT
Note: A separate Word version of this document will be accessible on fedbizopps at fbo.gov
1. Circle to indicate if work was performed as a Prime Contractor or Subcontractor:
Water Mist Type Fire Suppression Prime Subcontractor
2. Name of Offeror: ______________________________________________
3. Project Title: ______________________________________________
4. Contract/Project Number: ______________________________________________
5. Project Location: ______________________________________________
6. Total Contract Value: $ ___________________
7. If Offeror performed as Subcontractor, the $ value of Subcontract: $ ______________
8. Construction Phase Start Date (Month/Year): ____________________________________
9. Construction Phase Completion Date (Month/Year): _______________________________ (Actual date if project has been completed, anticipated date if project is not complete)
10. Name of Customer/Client: ______________________________________________
11. Telephone Number of Customer/Client: _________________________________________
12. Email Address of Customer/Client: ____________________________________________
13. Describe General Scope of the Construction Project: __________________________
14. Describe/demonstrate how the project is relevant to the solicitation in the following areas:
14.1. Describe what type of Water Mist Fire Suppression System was installed and how it meets criteria A.2:
14.2. Describe what type of facility work was performed at:
14.3. Describe outage coordination during continued facility operation:
14.4. Describe how Offeror minimized impacts to normal facility operations:
14.5. Describe the Offeror’s role and responsibility during construction of the project:
15. Your Performance Evaluation by Customer/Client, if known:
Note: Use of additional pages as necessary to provide sufficient detail to satisfy 00 22 00:
A.2. Installation and commissioning of new water mist fire suppression systems with outage coordination during continued facility operation at a powerhouse, power plant, generation station, manufacturing facility or similar industrial facilities.