W912DW18R0001-0002..pdf

PDF 5 MB Posted

Attached to
Mud Mountain Dam Fish Passage Facility, Buckley, WA
Solicitation number
W912DW18R0001
Issued by

About this file

Amendment R0002 for W912DW18R0001

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

W912DW18R0001 Mud Mountain Dam Fish Passage Facility, Buckley, WA

1. This amendment (0002) provides for the follow ing changes:

a. Revision to Section 00 21 00-A:

Site Visit tentative schedule is updated w ith coresponding maps.

b. Revision to CLIN 0008

CLIN 0008 Pricing Breakdow n Schedule and Sketches are included as other than cost and pricing data for ease of review by the evaluation team. Offeror shall complete the CLIN 0008 Pricing Breakdow n Schedule in your pricing proposal. Sketches are intended to provide graphic representation only.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Oct-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW-18-R-0001

X 9B. DATED (SEE ITEM 11)

02-Oct-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Oct-2017

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW-18-R-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The below Table of Contents has been added

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Section 00 21 00-A Site

Visit Schedule & Maps

8 19-OCT-2017

Attachment 2 CLIN 0008 Price

Breakdown and Sketches

4 19-OCT-2017

(End of Summary of Changes)

Pre-Proposal SITE VISIT INFORMATION

Updated as of 19OCT2017 –

The tour will require approximately 6 hours. The tentative schedule is as follows:

0730—Suggested arrival time at Federal Center South (FCS) to ensure timely entry through security.

0800 – Presentation of Proposal Requirements & Review of Care & Diversion of Water Plan in the Galaxy

Conference Room.

0930 – Buses depart FCS main parking lot: 4735 E. Marginal Way S., Seattle, WA 1030 – Pickup additional personnel at WA Army National Guard Armory, 455 N River Ave, Buckley, WA* 1040 – Arrive at MMD – Fish Passage Facility Left Bank of White River (current Trap/Haul facility) 1125 – Arrive at MMD – Fish Passage Facility Right Bank of White River (future Trap/Haul facility) near

Muckleshoot Indian Tribe (MIT) Hatchery parking area at 25429 SE Mud Mountain Rd, Enumclaw, WA

1220 – Arrive at MMD – Fish Release Site (approximately 2.3 mi upstream of MMD, access road is off

SR410)

1310 – Drop-Off at WA Army National Guard Armory, 455 N River Ave, Buckley, WA 1400 – Buses arrive back at FCS main parking lot: 4735 E. Marginal Way S., Seattle, WA

*For participants who choose not to attend the presentation at FCS, bus pick-up is available at the WA Army National Guard Armory, 455 N River Ave, Buckley, WA 98321 at 1030. We will depart the Armory at 1035. Please park in stalls farthest away from the Armory building. If you do not plan on attending the presentation at FCS, but will meet at the Armory to attend the site visit, please email Leah Hauenstein, Project Manager, at leah.j.hauenstein@usace.army.mil by Monday 23 October 2017 at 1500PT.

Other Logistics:

Personal Protective Equipment (PPE) not required.

There are not restrooms on the site visit. Please utilize the facilities at FCS before departing on the bus.

Rain gear recommended.

There will not be a stop for lunch. Please plan accordingly.

See additional Site Visit map attachments:

Federal Center South - Main Parking: 4735 E. Marginal Way S., Seattle, WA 98105

- Parking is available here

- Suggested arrival time is 0730 in order to check-in with security in lobby of main building

(Bldg 1201) in time for 0800 presentation

- Buses will arrive by 0900 and depart by 0930

Buses arrive by 1030 at WA Army National Guard Armory, 455 N River Ave, Buckley, WA for additional personnel pick-up and depart by 1035.

Buses arrive at 1040 for tour of MMD-Fish Passage Facility Project Site (Left Bank of White River

– current Trap/Haul facility) and depart by 1115.

Buses arrive at 1125 for tour of MMD-Fish Passage Facility Project Site (Rt. Bank of White River

– future Trap/Haul facility, near Muckleshoot Indian Tribe (MIT) Hatchery parking area at 25429

SE Mud Mountain Rd, Enumclaw, WA) and depart by 1200.

Buses arrive at 1220 for tour of MMD Fish Release Site (approximately 2.3 mi upstream of MMD, access road is off SR410) and depart by 1300

Buses arrive by 1310 at WA Army National Guard Armory, 455 N River Ave, Buckley, WA for personnel drop-off and depart by 1315.

Bus return to Federal Center South by 1400. Main Parking: 4735 E. Marginal Way S., Seattle, WA 98105

MMD FPF CLIN 0008 Pricing Breakdown Schedule

Number Description Price 1 Intake Foundation White River Scour Portection 2 Secant Pile Foundation Wall 3 Individual Foundation Piles 4 Demolition of Existing Fish Trap 5 Demolition for Sediment Sluiceway Construction 6 Intake Log Boom and Attaching hardware 7 Submerged Bedload Excluder Wall 8 Submerged Bedload Excluder Wall Bulkhead 9 Left Sidewall Extension/Deck 10 Demolition for Intake Face Wall 11 Excavation for Intake Face Wall 12 Intake Face Wall and Openings 13 Sediment Sluiceway Subgrade Prep

14A Sediment Sluiceway Right Sidewall (Upstream) 14B Sediment Sluiceway Right Sidewall (Downstream) 15 Sediment Sluiceway Left Sidewall 16 Sediment Sluiceway Concrete Floor Slab 17 Sediment Sluiceway Crossing Deck Slab 18 Control Density Fill in Exisiting Fish Trap 19 In-Flume Barrier toRaise Water Surface Elevation for Fish Protection 20 Intake Facewall Bulkheads 21 Sediment Sluiceway Gate & Appurtenances 22 Sediment Sluiceway Gate Bulkheads 23 Flow Divide Wall 24 Operating Deck Support Walls 25 Operating Deck 26 Flow Control Gates 27 Flow Control Gate Bulkheads 28 Access Road and Features East of Operating Deck 29 All Electrical, Instrumentation and Controls 30 Access Ramp West of Operating Deck

Total equals CLIN 0008

Note: Offeror to fill out shaded blocks. Total price must match total price for CLIN 0008 on price schedule.

W912DW18R0001-0002.pdf
MMD FPF CLIN 0008 Pricing Breakdown Schedule and Sketches.pdf
Sheet1

File details come from the government source that posted it. Updated .