Access_Connection_Permit.pdf

PDF 2 MB Posted

Attached to
Mud Mountain Dam Fish Passage Facility, Buckley, WA
Solicitation number
W912DW18R0001
Issued by

About this file

Access Connection Permit

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Provisions

1. To the extent permitted by applicable law, the Permit Holder, its successors and assigns, agrees to protect the State of Washington, its officers and employees and save them harmless from all claims, actions or damages of every kind and description which may accrue to or be suffered by any person, persons, or property by reason of the acts or omissions of the Permit Holder, its assigns, agents, contractors, licensees, employees or any person whomsoever, in connection with Permit Holder's, its assigns', agents', contractors', licensees' or employees' construction, installation, maintenance, operation, use or occupancy of the right of way or in the exercise of this permit. In case any suit or action is brought against the State of Washington, its officers and employees, arising out of or by reason of any of the above causes, the Permit Holder, its successors or assigns will, upon notice of such action, defend the same at its sole cost and expense and satisfy any judgement against the State of Washington, its officers, or employees: PROVIDED, that if the claims or damages are caused by or result from the concurrent negligence of (a) the State of Washington's agents or employees and (b) the Permit Holder or Permit Holder's agents or employees, this indemnity provision shall be valid and enforceable only to the extent of the negligence of the Permit Holder or the Permit Holder's agents or employees.

To the extent permitted by applicable law, the Permit Holder, and on behalf of its assigns, agents, licensees, contractors and employees agrees to waive any claims for losses, expenses, damages or lost revenues incurred by it or its agents, contractors, licensees, employees or customers in connection with Permit Holder's, its assigns', agents', contractors', licensees' or employees' construction, installation, maintenance, operation, use or occupancy of the right of way or in the exercise of this permit against the State of Washington, its agents or employees except the reasonable costs of repair to property resulting from the negligent injury or damage to Permit Holder's property by the State of Washington, its agents, contractors or employees.

2. During the progress of the work, such barriers shall be erected and maintained as may be necessary or as may be directed for the protection of the traveling public; the barriers shall be properly lighted at night.

3. Except as herein authorized, no excavation shall be made or obstacle placed within the limits of the State highway in such a manner as to interfere with the travel over said road.

4. If the work done under this permit interferes in any way with the drainage of the State highway, the Permit Holder shall wholly and at its own expense make such provision as the Department may direct to take care of said drainage.

5. Permit Holder hereby authorizes the Department to enter upon their lands where necessary to construct or reconstruct the permitted access connection and/or construct and maintain traffic control devices and appurtenances.

6. The access connection shall be maintained between the right of way line and the shoulder line of said (highway, frontage service road of said highway, highway and/or frontage service road, "-" Line of said highway) by the Permit Holder, their heirs, successors or assigns.

7. On completion of said work herein contemplated, all rubbish and debris shall be immediately removed and the roadway and roadside shall be left neat and presentable and satisfactory to the Department.

8. The cost of construction or modification of a connection shall be the responsibility of the Permit Holder, including the cost of modification of any connection required as a result of changes on property site use in accordance with WAC 468-51-110.

9. The Department hereby reserves the right to order the change of location or the removal of any structure or structures authorized by this permit at any time, said change or removal to be made at the sole expense of the party or parties to whom this permit is issued, or their successors and assigns.

10. Existing permitted connections impacted by the Department's work program and which, in the consideration of the Department, necessitate modification, relocation, or replacement in order to meet current Department connection location, quantity, spacing, and design standards, shall be modified, relocated, or replaced in kind by the Department at no cost to the Permit Holder. The cost of further enhancements or modification to the altered, relocated, or replaced connections desired by the Permit Holder shall be the responsibility of the Permit Holder.

11. If any changes are made or proposed in the land use, intensity of development, type of traffic, or traffic flow of the property served by this connection permit, the Permit Holder is required to contact the Department to determine if further analysis is needed to determine if the change is significant and would require a new permit and modifications to the connection.

12. All such changes, reconstruction, or relocation by the Permit Holder shall be done in such manner as will cause the least interference with any of the

Department's work, and the Department shall in no way be held liable for any damage to the Permit Holder by reason of any such work by the Department, its agents or representatives, or by the exercise of any rights by the Department upon roads, streets, public places, or structures in question.

13. This permit or privilege shall not be deemed or held to be an exclusive one and shall not prohibit the Department from granting other permits or franchise rights of like or other nature to other public or private companies or individuals, nor shall it prevent the Department from using any of its roads, streets, or public places, or affect its right to full supervision and control over all or any part of them, none of which is hereby surrendered.

14. The Department may revoke, amend, or cancel this permit or any of the provisions thereof at any time by giving written notice to the Permit Holder. The

Permit Holder shall immediately remove all facilities from the right of way. Any facilities remaining upon the right of way 30 days after written notice of cancellation shall be removed by the Department at the Permit Holder's expense.

15. It is the responsibility of the appicant or Permit Holder to obtain any other local permits or other agency approvals that may be required, including satisfaction of all environmental regulations. It is also the responsibility of the Permit Holder to acquire any property rights necessary to provide continuity from the applicant's property to the Department's right-of-way if the Permit Holder's property does not abut the right of way.

16. The party or parties to whom this permit is issued shall maintain at its or their sole expense the structure or object for which this permit is granted in a condition satisfactory to the Department.

17. Any breach of any of the conditions and requirements herein made, or failure on the part of the Permit Holder of this permit to proceed with due diligence and in good faith after its acceptance, with construction work hereunder, shall subject this permit to cancellation as herein provided.

18. This permit is subject to all applicable provisions of 468-51 WAC, 468-52 WAC, Chapter 47.50 RCW, Chapter 47.32 RCW, and/or Chapter

47.44 RCW, and amendments thereto.

19. The obligation to pay or reimburse any money under this Permit is subject to the availability of funds appropriated for this purpose to the Department of the Army, and nothing in this Permit shall be interpreted to require obligations or payments in violation of the Anti-Deficiency Act, 31 U.S.C. §1341 nor shall it be implied that Congress will at a later date appropriate funds to meet any deficiencies.

20. Nothing in this Permit shall be interpreted as a waiver of sovereign immunity by the United States or as a waiver, release or forbearance of the right to assert federal law to the extent applicable.

RAMPS - Access Connection Permit - Page 2

Special Provisions for Highway Encroachments

RAMPS – Special Provisions Page 1 Exhibit “A”

Permit No. 50829 (AC 1701002)

Applicable provisions are denoted by

1. No work provided for herein shall be performed until the Permit Holder is authorized by the following Department representative:

Ed Giraud, Construction Liaison WSDOT – NW Region Local Agency & Development Services PO Box 330310 (MS 240) Seattle, WA 98133-9710 Office: (206) 440-4709

2. Prior to the beginning of construction, a preconstruction conference shall be held at which the Department and the Permit Holder and Permit Holder's engineer, contractor, and inspector shall be present.

3. Should the Permit Holder choose to perform the work outlined herein with other than its own forces, a representative of the Permit Holder shall be present at all times unless otherwise agreed to by the Department representative. All contact between the Department and the Permit Holder's contractor shall be through the representative of the Permit Holder. Where the Permit Holder chooses to perform the work with its own forces, it may elect to appoint one of its own employees engaged in the construction as its representative. Failure to comply with this provision shall be grounds for restricting any further work by the Permit Holder within the State right of way until said requirement is met. The Permit Holder, at its own expense, shall adequately police and supervise all work on the above described project by itself, its contractor, subcontractor, agent, and others, so as not to endanger or injure any person or property.

4. A copy of the permit must be on the job site and protected from the elements at all times during any of the construction authorized by said permit.

5. This permit does not give the Permit Holder or any agent or contractor of the Permit Holder any rights to cut, spray, retard, remove, destroy, damage, disfigure or in any way modify the physical condition of any vegetative material located on the highway right of way, except by written permission from the Department or for purposes as described by No. 6 if denoted below. All restoration shall be done to the satisfaction of the Department at the sole expense of the Permit Holder.

6. If necessary to increase sight distance, brush shall be removed from both sides of the access connection and stumps shall be removed. The indiscriminate cutting of merchantable timber or disfiguring of any feature of scenic value shall not be permitted.

7. The he access connection(s) shall be constructed in accordance with the attached ____________________.

Sufficient length of______________________ diameter culvert pipe shall be placed in ditch and laid to a true line and grade.

The access connection(s) shall be surfaced to the limits as shown on the plan with a 150 millimeter (6 inch) minimum compacted depth of gravel base material and a 80 millimeter (3 inch) compacted depth of crushed surfacing top course. Asphalt paving will not be required. Finished grade of the access connection shall be in accordance with the profile control as shown on the attached plan. Directing of surface water from private property to Department right of way will not be permitted, unless otherwise approved by the Department.

8. The he access connection(s) shall be constructed in accordance with the attached ____________________.

Sufficient length of______________________ diameter culvert pipe shall be placed in ditch and laid to a true line and grade.

The access connection(s) shall be surfaced to the limits as shown on the plan with a 150 millimeter (6 inch) minimum compacted depth of gravel base material, a 80 millimeter (3 inch) minimum compacted depth of crushed surfacing top course, and paved with a 80 millimeter (3 inch) minimum compacted depth of Asphaltic Concrete Class B unless otherwise specified by the Department.

Any existing oil mat on shoulder or roadway shall be removed and new pavement laid to a butt joint with existing pavement.

Finished grade of new pavement shall be in accordance with the profile control as shown on attached plan. Directing of surface water from private property onto Department right of way will not be permitted, unless otherwise approved by the Department.

9. All buildings and appurtenances shall be so located at a distance from the right of way line of any State Highway that none of the right of way therefore is required for use of the patrons or customers of any such establishment. Permit Holder shall comply with local building codes to the extent applicable to a federal project. Set-back requirements for the location of buildings in relation to the right of way line are a function of local authorities, and they should be consulted regarding requirements that must be adhered to.

10. The Permit Holder agrees to schedule the work herein referred to and perform said work in such a manner as not to delay the Department's contractor in the performance of his contract.

11. Work within the right of way shall be restricted to between the hours of _____________ and _____________ and.or _____________, and no work shall be allowed on the right of way Saturday, Sunday, or holidays, unless authorized by the DEPARTMENT. Any lane closures must be submitted for approval in advance of use. The hours of permitted closure may differ from the above noted hours.

RAMPS – Special Provisions Page 2 Exhibit “A”

12. The shoulders, where disturbed, shall be surfaced with crushed surfacing top course or 4” native material minimum compacted depth, or as directed by the DEPARTMENT. The surface of the finished shoulder shall slope down from the edge of pavement at the rate of 5% unless otherwise directed. The restored shoulder must not have any strips or sections less than 2 feet (0.6 meters) wide. The restored shoulder shall be surfaced with the attached seed mix below – Special Provision 27.

13. The Permit Holder shall be responsible for constructing and maintaining the access connection(s) and appurtenances between the shoulder line of the highway and the right of way line inclusive of surfacing and drainage. The Department has the right to inspect all installations at the time of construction and at any time afterward and to require that necessary changes and repairs be made.

Unsatisfactory work will be corrected by the Department, at the Permit Holder's expense, or access may be removed at the Permit Holder's expense. Directing of surface water from private property onto Department right of way will not be permitted.

14. The access connection shall be sufficiently surfaced back an adequate distance from the edge of the pavement to prevent any tracking of material onto the highway. Any tracking of material onto the highway shall be subject to enforcement of Chapter

46.61.655 RCW if applicable and shall be immediately cleaned up by the Permit Holder or the Permit Holder's agent.

15. Standard highway warning signs designated as "Truck Crossing" sign, plate W8-6, shall be placed and maintained at Permit Holder's expense on each side of the access connection. Signs shall be in evidence only when access is actually being used. If necessary, flagmen shall be provided. Sufficient parking space shall be provided by the Permit Holder outside Department right of way so no vehicles will be parked on said right of way.

16. All manholes, valve covers, and like appurtenances shall be constructed at such an elevation to conform to the shoulder slope from the edge of pavement or as directed by the Department.

17. All slopes, slope treatment, top soil, ditches, pipes, etc., disturbed by this operation shall be restored to their original cross section and condition. All hazards shall be marked by warning signs, barricades, and lights. If necessary, flagmen shall be employed for the purpose of protecting the traveling public. Roadside operations shall be specified by the Department's representative.

18. During the construction and/or maintenance of this facility, the Permit Holder shall comply with the Manual on Uniform Traffic Control Devices for Streets and Highways, (Federal Highway Administration) and Washington modifications thereto. If determined necessary by the Department, the Permit Holder shall submit a signing and traffic control plan to the Department's representative for approval prior to construction or maintenance operations. No lane closures shall be allowed except as approved by the Department representative. Approvals may cause revision of special provisions, including hours of operation.

19. Bond coverage required to ensure proper compliance with all terms and conditions of said permit will be furnished by a Blanket Surety Bond held by the Department at the Olympia Service Center.

20. A surety bond in the amount of _____________ written by a surety company authorized to do business in the State of Washington shall be furnished to ensure compliance with any and all of the terms and conditions of this permit and shall remain in force until all work under this permit has been completed and approved by the Department.

21. Relative to advertising adjacent to all State highways, we wish to call your attention to the Scenic Vistas Act of 1971, Chapter

47.42 RCW and State Transportation Commission ruling Chapter 468-66 WAC. Violation of this section of the statutes will be sufficient cause for cancellation of this permit. On-premise signs are allowed.

22. The Permit Holder shall notify the DEPARTMENT’s Representative upon completion of the work under this PERMIT so that a final inspection can be made.

23. The responsibility of the Permit Holder for proper performance, safe conduct, and adequate policing and supervision of the project shall not be lessened or otherwise affected by Department approval of plans, specifications, or work, or by the presence at the work site of Department representatives, or by compliance by the Grantee with any requests or recommendations made by such representatives.

24. All material and workmanship shall conform to the Washington State Department of Transportation Standard Specifications for Road, Bridge and Municipal Construction, current edition, and amendments thereto, and shall be subject to inspection by the Department.

25. Itemization of any marketable timber within the State highway right of way removed during construction and sight distance clearing shall be completed and any payments to the DEPARTMENT for said lumber shall be executed.

26. Traffic control is required for work within State highway right of way and a Traffic Control Plan shall be reviewed and approved by the DEPARTMENT prior to construction of the approach. Work within State highway right of way is typically restricted between certain hours and these work hours will be provided by the DEPARTMENT in concurrence with the Traffic Control Plan approval.

27. The approach shall be constructed as specified in the attached Exhibits. Sufficient length of culvert pipe (at least 18” in diameter and capable of handling major storm events) shall be placed in ditch and laid to a true line and grade. The finished grade of the access connection shall be in accordance with the profile control so surface runoff flows away from the highway. Directing of surface water from private property to the DEPARTMENT right of way will not be permitted, unless otherwise approved by the

DEPARTMENT.

28. The access connection shall be blocked off or gated during periods of no active forest management or maintenance activities. The control mechanism (locking fence, gates, bollards, etc) preventing entry to the site shall be placed outside of the State highway right of way.

RAMPS – Special Provisions Page 3 Exhibit “A”

29. During construction of this project, the GRANTEE shall comply with the Washington State Department of Transportation Highway Runoff Manual, or DEPARTMENT-approved equivalent, and implement Best Management Practices (BMPs) as detailed in the manual to mitigate erosion. All discharges to State right of way on this project shall conform to State and Local water quality regulations and shall meet WAC 173-201A. Seed of the following composition, proportion and quality shall be applied at a rate of 50 pounds per acre on the berm and disturbed areas requiring seeding, fertilizing and mulching:

Kind and Variety of Pounds of Pure Seed in Mixture Live Seed Per Acre

Sterile Triticale or Sterile Wheat Grass 40.0 Creeping Red Fescue (Festuca rubra ssp. rubra) 7.5 Rough Bentgrass (Agrostis scabra) 2.5

TOTAL 50.0

30. Pursuant to, WAC 468-51-110 Changes in property site use – The access connection is issued to the Permit Holders for a particular type of land use generating specific projected traffic volumes at the final stage of proposed development. Any changes made in the use, intensity of development, type of traffic, or traffic flow of the property requires the Permit Holders, their assignee, or property owner to contact the DEPARTMENT to determine if further analysis is needed to determine if the change is significant and would require a new permit and modifications to the connection.

palisof Text Box "EXHIBIT B" Sheet 1 of 1 Access Permit Permit No. AC 1701002

SR 410 (MP 31.929 RT) RAMPS 50829

palisof Callout

STA 380+73 RT

ACCESS CONNECTION TYPE 1

palisof Callout

STA 386+63 RT

Existing Access Connection (to be obliterated).

T19N-R07E

T19N-R07E

PIN #:

0119079001

PIN #:

0119079002

PIN #:

1219079002

PIN #:

1219079002

PIN #:

1219079003

PIN #:

1219079015

0 130 260 390 520 65065

Feet

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S E

A T

T L

E D

IS

T

R

IC

T

S E

A T

T L E

W

A S

H

IN

G T

O N

N o te s

C re a te d b y

S e c ti o n

C o o rd in a te S y s te m

D a te

F ile

N a m e

D a tu m

P a th

M U

D M

O U

N T A

IN

D

A M

F is h

P a s s a g e F is h

D ro p S it e

K

IN

G C

O U

N T

Y W

A S

H

IN

G T

O N

S T A

T

ER

E A

L E

S T A

T E

P L A

N N

IN

G

M A

P o f

S h e e t N u m b e r:

O

J V

C E

N W

S -R

E -T

R

O T

R \c a d a s tr a l\ O rg P ro je c ts

\C iv il\ M u d M o u n ta in D a m

\T a s k s \M

M D

F P

\O L

D \D

R O

P

S

IT

E \F

IS

H

-R E

L E

A S

E -2

W

A D

O T .m x d

S e p

:0

:0

A

M

M M

D

F P .m x d

Legend

Interest

Permanent Access Easement From MIT

Permit From WADOT

Temporary Construction Area From MIT

LandParcelArea

LandParcelLine

Township

Section

Qtr_Section

King County Parcels Name Interest Acres Tract

WADOT Permit From WADOT 0.18 A11P-2

MIT Temporary Construction Area From MIT 0.15 A13E-2

MIT Permanent Access Easement From MIT 1.2 A13E-1 palisof Text Box "EXHIBIT C" Sheet 1 of 3 Access Permit Permit No. AC 1701002

SR 410 (MP 31.929 RT) RAMPS 50829

palisof Callout

ACCESS CONNECTION TYPE 1

STA 380+73 RT

"EXHIBIT C" Sheet 2 of 3 Access Permit Permit No. AC 1701002

SR 410 (MP 31.929 RT) RAMPS 50829

palisof Text Box

NOTES:

1) Sawcut at existing fogline.

2) Roadway surfacing within highway right of way inclusive of shoulder shall be 8" of Hot Mix Asphalt (HMA) class ½", Pg. 64-22 over 12" of Crushed Surfacing Base Course (CSBC), or match existing depth whichever is greater.

3) See Special Provisions.

"EXHIBIT C" Sheet 3 of 3 Access Permit Permit No. AC 1701002

SR 410 (MP 31.929 RT) RAMPS 50829

S-A7431001-17110717160
RAMPS50829_4USCOE_nonSTD_Final
RAMPS50829_4USCOE_nonSTDsp1-3_Final
RAMPS50829_ExhibitB_Final
RAMPS50829_ExhibitC_Final

File details come from the government source that posted it.