Amendment_0002_W912DW18B0011_Repair_CDCs_J00578_&_J00580.pdf

PDF 869 KB Posted

Attached to
Repair Child Development Centers J00578 & J00580
Solicitation number
W912DW18B0011
Issued by

About this file

Amendment 0002 Solicitation Document: -Revised SOW, dated 16 Aug 2018

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

IFB No.: W912DW18B0011 Amendment No.: 0002 Title: "Repair Child Development Centers J00578 & J00580" on Joint Base Lew is-McChord, Washington The purpose of this amendment is to incorporate a revised Statement of Work dated 16 August 2018.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW18B0011

X 9B. DATED (SEE ITEM 11)

27-Jul-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Aug-2018

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW18B0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT 0002

1. The purpose of Amendment 0002 to IFB Solicitation W912DW18B0011 is to incorporate a revised Statement of Work dated 16 August 2018 to provide clarifications and corrections as a result of bidder inquiries received. This revised Statement of Work supersedes and replaces the Statement of Work issued with the original RFP in its entirety.

2. Offerors are to ensure that all amendments are acknowledged in their bids.

3. All other terms and conditions of the IFB solicitation remain unchanged.

Attachment:

Revised SOW, dated 16 Aug 2018

SECTION 01 11 00

STATEMENT OF WORK

Version 1.34

Issued December 29, 2017

CONSTRUCTION

Pre-RFP Draft

Date: May 4, 2018

Revised: August 16, 2018

1. GENERAL DISCUSSION

1.1. Project Identification

1.1.1. Project Title: Repair Child Development Centers J00578 & J00580

1.1.2. IJO Number(s): MJW000883J, MJW000893J

1.1.3. Project Package Number(s): CE0606

1.2. Description of Work

1.2.1. The contractor shall supply all supervision, labor, equipment, and materials to perform all work in strict accordance with the contract specifications, this statement of work, and identified drawings to provide Repair of Child Development Centers (CDCs) Buildings 578 and 580.

1.3. Area Description

1.3.1. Location

1.3.1.1. McChord Field, Joint Base Lewis-McChord (JBLM), WA – Building Numbers 578 and 580.

1.3.2. Known Existing Site Conditions

1.3.2.1. Building 578 is an existing facility originally constructed in 1994. The site is located in a developed area of McChord Field (formerly McChord Air Force Base). The site is relatively flat including play grounds, a garden, large trees and mature shrubs, in addition to a lawn area.

1.3.2.2. Building 580 is an existing facility originally constructed in 1994. The site is located in a developed area of McChord Field. The site is relatively flat including play grounds, a garden, large trees and mature shrubs, in addition to a lawn area.

1.4. Principal Items To Be Accomplished

1.4.1. Base Construction Deliverables, IJO MJW000893J.

1.4.1.1. Base Item CLIN 0001. Child Development Center Bldg 580, Repair (‘K’)

a. Include all work as indicated in drawings and specifications, except work identified in Paragraphs

1.4.1.2 through 1.4.2.8 of this SOW.

(1) Site lighting work as indicated on Sheet E002 of the design drawings will NOT be included in this contract. These fixtures have been already been replaced.

(2) Remove mechanical and electrical equipment and associated finishes as indicated to complete the work.

(3) Remove building elements, partitions, kitchen equipment and finishes indicated to complete the work.

(4) Replace floor coverings as indicated on the drawings.

(5) Replace existing ACT ceilings in the corridors and Activity Room as indicated on the drawings.

Replace ceilings in Activity Rooms, lobby, and other areas as needed to accommodate work.

(6) Replace existing window sills.

(7) Paint existing interior walls as indicated on the drawings.

(8) Rearrange existing Kitchen area:

(a) Provide plumbing, fire suppression, exhaust ventilation, and electrical service and distribution as indicated.

(b) Upgrade Kitchen finishes.

(c) Collect, clean, and reinstall/relocate existing kitchen equipment as indicated.

(d) Provide new built-in kitchen equipment as indicated in drawings and specs, with the exception of items identified within Paragraphs 1.4.1.2, 1.4.2.2, or 1.4.2.3 of this SOW.

(9) Replace existing HVAC equipment to include Kitchen HVAC air distribution.

(10) Provide natural gas domestic heating water boilers with gas meter that is tied into the JBLM

DDC system.

(11) Replace existing domestic hot and cold water piping, water heaters, hot water recirculating systems, thermostatic hot water mixing valves and waste and vent.

(12) Replace interior lighting fixtures.

(13) Replace existing exit hardware on exterior doors from Activity Rooms.

(14) Remove hazardous building materials in accordance with Hazardous Building Material Survey dated December 5, 2014, included as an attachment.

1.4.1.2. Base Item CLIN 0002. Child Development Center Bldg 580, Construction (‘L’)

a. All work associated with the following tasks as indicated in drawings and specifications.

(1) Provide door operators at the main entry vestibule door.

(2) Provide new closets in activity rooms.

(3) Remove existing walls between rooms 116 and 117 as well as between rooms 106 and 107, as indicated.

(a) Provide plumbing and electrical work to support new wall layout.

(4) Provide new adult restroom near front admin desk.

(5) Provide braced wall as indicated on the drawings.

(6) Replace fire sprinkler heads provide new heads where required to accommodate building renovations.

(7) Provide fire alarm components (pull stations, bell alarms, smoke detectors, strobes, horns, etc.)

(8) Provide duress alarm at front reception counter.

(9) Replace existing exterior building lighting.

(10) Expand Kitchen area into adjacent Care Room 127.

(a) Remove existing fixtures, partitions, flooring and finishes to support expansion.

(b) Provide new partitions and finishes as indicated.

(c) Provide janitor’s closet with sink.

(d) Provide new door threshold and air curtain.

1.4.2. Optional Construction Deliverables, IJO MJW000893J

1.4.2.1. Option Item CLIN 0003. Furniture Moves Bldg 580, Equipment (‘M’)

a. All work to remove, store and reinstall furniture and building contents.

(1) Remove and/or detach building contents as necessary (including but not limited to desks, chairs, bookcases, tables, pictures, chalk, white and bulletin boards and other furniture, waste cans, recycle bins, copies, TVs, signs, supplies, etc.)

(2) Transport and store items in Contractor provided secured storage facility with protection from the weather and environment.

(3) Transport items and reinstall. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

1.4.2.2. Option Item CLIN 0004. Built-In Refrigeration Bldg 580, Construction (‘L’)

a. Provide Walk-in Cooler/Freezer Assembly to include cooler/freezer unit coolers and refrigeration rack.

1.4.2.3. Option Item CLIN 0005. Kitchen Equipment Bldg 580, Equipment (‘M’)

a. Provide and install the following equipment (noted as “BY OTHERS” on Kitchen Equipment

Schedule, Sheet FS-1

(1) Mobile Cooler Shelving

(2) Wall Shelf

(3) Mobile Worktable

(4) Tilting Kettle (20 gal)

(5) Griddle (countertop)

(6) 2 Open Burners (countertop)

(7) Mobile Equipment Stand

(8) Mobile Convection Oven (double stacked)

(9) Mobile Heated Cabinet

(10) Mop and Broom Rack w/Shelf

(11) Janitor Shelving

(12) Dry Storage Shelving

1.4.2.4. Option Item CLIN 0006. Telecom Cables Bldg 580, Equipment (‘M’)

a. Provide telecommunications cabling.

1.4.2.5. Option Item CLIN 0007. DDC Controls Bldg 580, Repair (‘K’)

a. Replace existing pneumatic control systems with an electronic DDC control system that is compatible with JBLM.

1.4.2.6. Option Item CLIN 0008. Fire Extinguishers Bldg 580, Equipment (‘M’)

a. Provide fire extinguishers IAW NFPA 10.

1.4.2.7. Option Item CLIN 0009. Vision Panels in Doors Bldg 580, Construction (‘L’)

a. The following work is not currently indicated on the design drawings.

b. Replace all existing doors to activity rooms with doors that have a half-height glass vision panel.

(1) Glass panels shall be safety glass.

(2) Doors shall meet all applicable fire ratings and code requirements.

c. Reuse existing door hardware.

1.4.2.8. Option Item CLIN 0010. Viewing Windows Bldg 580, Construction (‘L’)

a. The following work is not currently indicated on the design drawings.

b. Provide one view window and two vision panels between each activity room/active play space/care room and the corridor.

(1) Vision panel glazing must extend from existing door height to 51-inches above finished floor.

Tempered glass shall be provided.

(2) View window glazing shall extend from existing door height to within 18 or 24-inches above finished floor. Safety glass shall be provided.

(3) Due to height requirements of vision panels and view windows, contractor shall coordinate install locations with existing casework and plumbing fixtures as well as future locations of cubbies, furniture, equipment, accessories, etc.

c. Contractor shall provide stamped structural details of window/panel installation in existing walls.

d. Windows and panels shall meet all applicable fire ratings and code requirements.

e. Existing wainscot, finishes, furniture (i.e. cubbies), equipment, accessories (i.e. soap dispensers, paper towel dispensers), etc. shall be removed and reinstalled as required to accommodate new window/panel installation.

f. Relocate existing fire extinguishers, outlets, switches, electrical conduit and wiring, controls, plumbing, etc. as necessary to accommodate new window/panel installation.

1.4.3. Optional Construction Deliverables, IJO MJW000883J

1.4.3.1. Option Item CLIN 0011. Child Development Center Bldg 578, Repair (‘K’)

a. Include all work as indicated in drawings and specifications, except work identified in Paragraphs

1.4.3.2 through 1.4.3.8 of this SOW.

(1) Remove mechanical and electrical equipment and associated finishes as indicated to complete the work.

(2) Remove building elements, partitions, and finishes indicated to complete the work.

(3) Replace floor coverings as indicated on the drawings.

(4) Replace existing ACT ceilings in the corridors and Activity Room as indicated on the drawings.

Replace ceilings in Activity Rooms, lobby, and other areas as needed to accommodate work.

(5) Replace existing window sills.

(6) Paint existing interior walls as indicated on the drawings.

(7) Replace existing HVAC equipment.

(8) Provide natural gas domestic heating water boilers with gas meter that is tied into the JBLM DDC system.

(9) Replace existing domestic hot and cold water piping, water heaters, hot water recirculating systems, thermostatic hot water mixing valves and waste and vent.

(10) Replace interior lighting fixtures.

(11) Replace existing exit hardware on exterior doors from Activity Rooms.

(12) Remove hazardous building materials in accordance with Hazardous Building Material Survey dated December 5, 2014, included as an attachment.

1.4.3.2. Option Item CLIN 0012. Child Development Center Bldg 578, Construction (‘L’)

a. All work associated with the following tasks as indicated in drawings and specifications.

(1) Provide door operators at the main entry vestibule door.

(2) Provide new closets in activity rooms.

(3) Remove existing walls between rooms 210 and 211 as indicated.

(a) Provide plumbing and electrical work to support new wall layout.

(4) Provide braced wall as indicated on the drawings.

(5) Replace fire sprinkler heads provide new heads where required to accommodate building renovations.

(6) Provide fire alarm components (pull stations, bell alarms, smoke detectors, strobes, horns, etc.)

(7) Provide Fire Extinguisher cabinets.

(8) Provide duress alarm at front reception counter.

(9) Replace existing exterior building lighting.

1.4.3.3. Option Item CLIN 0013. Furniture Moves Bldg 578, Equipment (‘M’)

a. All work to remove, store and reinstall furniture and building contents.

(1) Remove and/or detach building contents as necessary (including but not limited to desks, chairs, bookcases, tables, pictures, chalk, white and bulletin boards and other furniture, waste cans, recycle bins, copies, TVs, signs, supplies, etc.)

(2) Transport and store items in Contractor provided secured storage facility with protection from the weather and environment.

(3) Transport items and reinstall. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

1.4.3.4. Option Item CLIN 0014. Telecom Cables Bldg 578, Equipment (‘M’)

a. Provide telecommunications cabling.

1.4.3.5. Option Item CLIN 0015. DDC Controls Bldg 578, Repair (‘K’)

a. Replace existing pneumatic control systems with an electronic DDC control system that is compatible with JBLM.

1.4.3.6. Option Item CLIN 0016. Fire Extinguishers Bldg 578, Equipment (‘M’)

a. Provide fire extinguishers IAW NFPA 10.

1.4.3.7. Option Item CLIN 0017. Vision Panels in Doors Bldg 578, Construction (‘L’)

a. The following work is not currently indicated on the design drawings.

b. Replace all existing doors to activity rooms with doors that have a half-height glass vision panel.

(1) Glass panels shall be safety glass.

(2) Doors shall meet all applicable fire ratings and code requirements.

c. Reuse existing door hardware.

1.4.3.8. Option Item CLIN 0018. Viewing Windows Bldg 578, Construction (‘L’)

a. The following work is not currently indicated on the design drawings.

b. Provide one view window and two vision panels between each activity room/active play space/care room and the corridor.

(1) Vision panel glazing must extend from existing door height to 51-inches above finished floor.

Tempered glass shall be provided.

(2) View window glazing shall extend from existing door height to within 18 or 24-inches above finished floor. Safety glass shall be provided.

(3) Due to height requirements of vision panels and view windows, contractor shall coordinate install locations with existing casework and plumbing fixtures as well as future locations of cubbies, furniture, equipment, accessories, etc.

c. Contractor shall provide stamped structural details of window/panel installation in existing walls.

d. Windows and panels shall meet all applicable fire ratings and code requirements.

e. Existing wainscot, finishes, furniture (i.e. cubbies), equipment, accessories (i.e. soap dispensers, paper towel dispensers), etc. shall be removed and reinstalled as required to accommodate new window/panel installation.

f. Relocate existing fire extinguishers, outlets, switches, electrical conduit and wiring, controls, plumbing, etc. as necessary to accommodate new window/panel installation.

2. PERFORMANCE AND SCHEDULING

2.1. Performance Period Requirements

2.1.1. The Contractor is required to commence work under this Contract within ten (10) business days after the date of issuance of the Notice to Proceed (NTP) for the Base Item(s), prosecute the work diligently, and complete all work on all Base Item(s) no later than 270 calendar days after the date of issuance of the Notice to Proceed for the Base Item(s). The time stated for completion includes final cleanup of the premises and submission of all required close-out documentation.

2.2. Award of Options

2.2.1. Award of Option Item(s): The Government may award any of the Option Item(s), or none at all, but any Option Item(s) will be awarded not later than one hundred and eighty (180) calendar days after the date of issuance of the Notice to Proceed for the Base Item(s). The Government may award Option Items on different dates during this time period.

2.2.2. Duration of Option Items: If Option Items 0003-0010 are awarded prior to or after the issuance of

Notice to Proceed for the Base Item(s), the total duration of this Contract stated in Subparagraph

2.1.1, above, including base and option items shall not be extended, and all Option Items awarded during that time period shall be completed within the time stated in Subparagraph 2.1.1, above. If

Option Items 0011-0018 are awarded, whether prior to or after the date of issuance of Notice to

Proceed for the Base Item(s), the time for completion of all Base and Option Item(s) under this

Contract] shall be 450 days after the issuance of Notice to Proceed for the Base Item(s).

2.3. Construction Phasing Requirements

2.3.1. Building 580 will be available to the contractor upon issuance of Notice to Proceed for the base items. Should Option Items for Building 578 be awarded, the facility will not be available to the contractor until all work in Building 580 is complete and the occupants can transition personnel and furnishings/equipment to Building 580 and/or swing space. The contractor must account for this transition time within the Period of Performance.

2.4. Liquidated Damages

2.4.1. If the contractor fails to complete the work within the time period specified above, liquidated damages in the amount of $1,122.62 per calendar day will be assessed.

3. DRAWINGS

3.1. Contract Drawings

3.1.1. The drawings outlined below are provided to aid in conceptual guidance.

3.1.1.1. Building 580

Drawing

No.

Sheet

No.

Drawing Title Date

G001 1 Cover Sheet 3/16/18

Drawing

No.

Sheet

No.

Drawing Title Date

G002 2 Drawing Index 3/16/18

C101 3 Civil Site Plan 3/16/18

C102 4 Fence Details 3/16/18

AD101 5 Demolition Floor Plan 3/16/18

AD102 6 Demolition Floor Plan 3/16/18

A001 7 Colors and Materials and Abbreviations 3/16/18

A101 8 Floor Plan 3/16/18

A102 9 Floor Plan 3/16/18

A103 10 Finishes Floor Plan 3/16/18

A104 11 Finishes Floor Plan 3/16/18

A121 12 Reflected Ceiling Plan 3/16/18

A122 13 Reflected Ceiling Plan 3/16/18

A141 14 Enlarged Plans and Fixture Typical 3/16/18

A601 15 Door and Window Schedules and Types 3/16/18

A721 16 Details 3/16/18

FS-1 17 Equipment Plan and Schedule 6/30/17

FS-2 18 Utility Schedule 6/30/17

FS-3 19 Electrical Rough-Ins Plan 6/30/17

FS-4 20 Plumbing Rough-Ins Plan 6/30/17

FS-5 21 Building Works Plan 6/30/17

FS-6 22 Refrig. Conduit Rough-Ins Plan 6/30/17

FS-7 23 Elevation and Details 6/30/17

FS-8 24 Elevation and Details 6/30/17

FSR-1 25 Refrigeration Engineering 6/30/17

FSV-001 26 Exhaust Hood Engineering 6/30/17

No.

Sheet

No.

Drawing Title Date

FSV-002 27 Exhaust Hood Engineering 6/30/17

FSV-003 28 Exhaust Hood Engineering 6/30/17

FSV-004 29 Exhaust Hood Engineering 6/30/17

S001 30 General Notes 3/16/18

S002 31 General Notes and Abbreviations 3/16/18

S003 32 Inspection and Light Gauge Schedules 3/16/18

S100 33 Foundation Plan Sheet 1 3/16/18

S101 34 Foundation Plan Sheet 2 3/16/18

S301 35 Foundation Details 3/16/18

S302 36 Framing Details 3/16/18

M001 37 General Notes Legend & Abbreviations 6/30/17

MHD100 38 Demo Plan - HVAC 6/30/17

MHD101 39 Demo Plan - HVAC 6/30/17

MPD100 40 Demo Plan - Piping 6/30/17

MPD101 41 Demo Plan - Piping 6/30/17

MD200 42 Enlarged Plans 6/30/17

MD500 43 Mechanical Piping Details - Demo 6/30/17

MD600 44 Mechanical Schedules - Demo 6/30/17

MD601 45 Mechanical Schedules - Demo 6/30/17

MD602 46 Mechanical Schedules - Demo 6/30/17

MH100 47 Floor Plan HVAC 6/30/17

MH101 48 Floor Plan HVAC 6/30/17

MP100 49 Floor Plan Piping 6/30/17

MP101 50 Floor Plan Piping 6/30/17

MHK400 51 Enlarged Demo & New Kitchen Plan 6/30/17

No.

Sheet

No.

Drawing Title Date

M200 52 Enlarged Plans and Fixture Typical 6/30/17

M500 53 Mechanical Details 6/30/17

M501 54 Mechanical Details 6/30/17

M600 55 Mechanical Schedules 6/30/17

M601 56 Mechanical Schedules 6/30/17

M602 57 Mechanical Control Sequences 6/30/17

M603 58 Mechanical Control Sequences 6/30/17

M604 59 Mechanical Control Sequences 6/30/17

M605 60 Mechanical Control Sequences 6/30/17

M606 61 Mechanical Control Sequences 6/30/17

P001 62 General Notes Legend & Abbreviations 6/30/17

PD010 63 Foundation Demolition Plan- Piping 6/30/17

PD011 64 Foundation Demolition Plan - Plumbing 6/30/17

PD100 65 Demo Floor Plan - Piping 6/30/17

PD101 66 Demo Floor Plan - Plumbing 6/30/17

PD500 67 Plumbing Details Demo 6/30/17

PL010 68 Foundation Plan - Plumbing 6/30/17

PL011 69 Foundation Plan - Piping 6/30/17

PL100 70 Floor Plan - Plumbing 6/30/17

PL101 71 Floor Plan - Plumbing 6/30/17

PLK400 72 Enlarged Demo & New Kitchen Plan 6/30/17

P600 73 Plumbing Schedules 6/30/17

E001 74 Legend, Abbreviations and General Notes 6/30/17

E002 75 Site Lighting Plan 6/30/17

ED101 76 First Floor South Lighting Demolition Plan 6/30/17

No.

Sheet

No.

Drawing Title Date

ED102 77 First Floor North Lighting Demolition Plan 6/30/17

ED103 78 First Floor South Power Demolition Plan 6/30/17

ED104 79 First Floor North & Kitchen Power Demolition Plan 6/30/17

E101 80 First Floor North Lighting Plan 6/30/17

E102 81 First Floor South Lighting Plan 6/30/17

E103 82 First Floor North Power Plan 6/30/17

E104 83 First Floor South Power Plan 6/30/17

E401 84 Enlarged Plan 6/30/17

E501 85 Typical Details 6/30/17

E601 86 System On-Line Diagram and Load Calcs 6/30/17

E602 87 Existing Panel Schedules 6/30/17

E603 88 Panel Schedules 6/30/17

E604 89 Panel Schedule 6/30/17

E605 90 Panel WE1 and WE2 Schedules 6/30/17

E606 91 Control Diagrams 6/30/17

E607 92 Luminaire Schedule 6/30/17

E608 93 Kitchen Equipment Electrical Connections Schedule 6/30/17

T0-01 94 Symbols, Abbreviations and General Notes 6/30/17

T2-01D 95 First Floor South Demo Plan 6/30/17

T2-02D 96 First Floor North Demo Plan 6/30/17

T2-01 97 First Floor South Telecom Plan 6/30/17

T2-02 98 First Floor North Telecom Plan 6/30/17

T4-01 99 Riser Diagram 6/30/17

T4-02 100 Typical Details 6/30/17

FX001 101

Fire Protection Floor Plan, General Notes, Special

Notes and Construction Notes

6/30/17

No.

Sheet

No.

Drawing Title Date

FA001 102 Fire Alarm Legend and Notes 6/30/17

FA201 103 Fire Alarm Partial Floor Plan South 6/30/17

FA202 104 Fire Alarm Partial Floor Plan - North 6/30/17

3.1.1.2. Building 578

No.

Sheet

No.

Drawing Title Date

G001 1 Cover Sheet 3/16/18

G002 2 Drawing Index 3/16/18

C101 3 Civil Site Plan 3/16/18

C102 4 Fence Details 3/16/18

AD101 5 Demolition Floor Plan 3/16/18

AD102 6 Demolition Floor Plan 3/16/18

A001 7 Colors and Materials and Abbreviations 3/16/18

A101 8 Floor Plan 3/16/18

A102 9 Floor Plan 3/16/18

A103 10 Finishes Floor Plan 3/16/18

A104 11 Finishes Floor Plan 3/16/18

A121 12 Reflected Ceiling Plan 3/16/18

A122 13 Reflected Ceiling Plan 3/16/18

A601 14 Door and Window Schedules and Types 3/16/18

A721 15 Details 3/16/18

S001 16 General Notes 3/16/18

S002 17 General Notes and Abbreviations 3/16/18

S003 18 Light Gauge Schedules 3/16/18

S100 19 Foundation Plan 3/16/18

No.

Sheet

No.

Drawing Title Date

S301 20 Foundation Details 3/16/18

S302 21 Framing Details 3/16/18

M001 22 General Notes Legend & Abbreviations 6/30/17

MHD100 23 Demo Plan - HVAC 6/30/17

MHD101 24 Demo Plan - HVAC 6/30/17

MPD100 25 Demo Plan - Piping 6/30/17

MPD101 26 Demo Plan - Piping 6/30/17

MD500 27 Mechanical Piping Details - Demo 6/30/17

MD600 28 Mechanical Schedules - Demo 6/30/17

MD601 29 Mechanical Schedules - Demo 6/30/17

MD602 30 Mechanical Schedules - Demo 6/30/17

MH100 31 Floor Plan HVAC 6/30/17

MH101 32 Floor Plan HVAC 6/30/17

MP100 33 Floor Plan Piping 6/30/17

MP101 34 Floor Plan Piping 6/30/17

M200 35 Enlarged Plan 6/30/17

M500 36 Mechanical Details 6/30/17

M501 37 Mechanical Details 6/30/17

M600 38 Mechanical Schedules 6/30/17

M601 39 Mechanical Schedules 6/30/17

M602 40 Mechanical Control Sequences 6/30/17

M603 41 Mechanical Control Sequences 6/30/17

M604 42 Mechanical Control Sequences 6/30/17

M605 43 Mechanical Control Sequences 6/30/17

P001 44 General Notes Legend & Abbreviations 6/30/17

No.

Sheet

No.

Drawing Title Date

PD100 45 Demolition Plan- Plumbing 6/30/17

PD101 46 Demolition Plan - Plumbing 6/30/17

PD500 47 Plumbing Details Demo 6/30/17

PL100 48 Floor Plan - Plumbing 6/30/17

PL101 49 Floor Plan - Plumbing 6/30/17

P600 50 Plumbing Schedules 6/30/17

E001 51 Legend, Abbreviations and General Notes 6/30/17

ED101 52 First Floor South Lighting Demolition Plan 6/30/17

ED102 53 First Floor North Lighting Demolition Plan 6/30/17

ED103 54 First Floor South Power Demolition Plan 6/30/17

ED104 55 First Floor North Power Demolition Plan 6/30/17

E101 56 First Floor North Lighting Plan 6/30/17

E102 57 First Floor South Lighting Plan 6/30/17

E103 58 First Floor North Power Plan 6/30/17

E104 59 First Floor South Power Plan 6/30/17

E401 60 Enlarged Plan 6/30/17

E501 61 Typical Details 6/30/17

E601 62 System On-Line Diagram and Load Calcs

6/30/17

E602 63 Existing Panel Schedules 6/30/17

E603 64 Existing Panel Schedules 6/30/17

E604 65 Luminaire Schedule 6/30/17

T0-01 66 Symbols, Abbreviations and General Notes 6/30/17

T2-01D 67 First Floor South Demo Plan 6/30/17

T2-02D 68 First Floor North Demo Plan 6/30/17

T2-01 69 First Floor South Telecom Plan 6/30/17

No.

Sheet

No.

Drawing Title Date

T2-02 70 First Floor North Telecom Plan 6/30/17

T4-01 71 Riser Diagram 6/30/17

T4-02 72 Typical Details 6/30/17

FX001 73

Fire Protection Floor Plan, General Notes, Special

Notes and Construction Notes

6/30/17

FA001 74 Fire Alarm Legend and Notes 6/30/17

FA201 75 Fire Alarm Partial Floor Plan South 6/30/17

FA202 76 Fire Alarm Partial Floor Plan - North 6/30/17

3.1.2. Dimensions and utility locations are approximate and must be verified in the field.

3.1.3. Revisions to Drawings:

3.1.3.1. Change General Note 2 on Sheet E601 of the Bldg 580 drawing package to reference panel schedules on Sheet E602, in lieu of ED601.

3.1.3.1.3.1.3.2. Plate Number A103 and A104: Add the following statement to Finishes Legend, “All corner guard heights to be 48-inches with minimum 2-inch wings”.

3.2. Produced As-built drawings shall follow the CAD/GIS format identified in the current version

(FY17) JBLM, DPW Geospatial Requirements

3.2.1. All exterior work under this project shall be geospatially referenced on as-built drawings or provided in GIS format

3.2.2. Each As-built drawing sheet shall be annotate with the following:

- Project Title

- Project IJO number(s)

- Project Package number(s)

- Contract number to include Task Order number

- Labeled As-built with As-built date

4. SPECIFICATIONS AND CODES

4.1. Codes

4.1.1. The Contractor shall comply with the most recent edition, at time of solicitation, of all pertinent

Local, State, and Federal building and life/health/safety codes, to include the following:

a. Applicable Unified Facilities Criteria (UFC)

b. UFC 1-200-01: General Building Requirements

c. UFC 1-200-02: High Performance and Sustainable Building Requirements https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-200-02

d. UFC 3-301-01 Structural Engineering

e. UFC 3-310-04 Seismic Design of Buildings

f. UFC 3-600-01 Fire Protection Engineering for Facilities

g. Army Standards for Child Development Centers for Children 6 Weeks to 5 Years, and Standard

Design Criteria Room by Room Descriptions for Children 6 Weeks to 5 Years

h. Accessibility, 2008 ABA Accessibility Standard for DOD Facilities

i. ASA IE&E SDD policy www.asaie.army.mil/Public/ES/doc/SDD%20Policy.pdf

j. UFC 1-201-01 Non-Permanent DOD Facilities in Support of Military Operations

k. EM 385-1-1

(http://www.publications.usace.army.mil/USACEPublications/EngineerManuals.aspx)

l. ASCE 7 American Society of Engineers

m. National Electrical Code

n. National Fire Protection Association (NFPA) Codes

o. Telecommunication Industry Association/Electrical Industry Association Wiring Standards

(Building Telecommunication Wiring Standards)

p. Army Installation Information Infrastructure Architecture Policy (I3A)

q. USACE Energy and Water Conservation Design Guide

(http://www.wbdg.org/references/pa_dod_energy.php)

r. JBLM Design Standard specifications (http://www.lewis-mcchord.army.mil/designstandards/)

s. PWE-707, Standard Operating Procedure for Construction and Demolition (C&D) Waste

Planning and Reporting (Available through government Project Manager)

4.2. Specifications

4.2.1. The contractor shall comply with all relevant specification sections as set forth in this contract.

4.2.2. Revise the UFGS Specification Sections provided, as follows:

4.2.2.1. GENERAL: Meet LEED Low VOC requirements for ALL interior sealants and adhesives.

4.2.2.2. GENERAL: All reference to UFC 3-600-01 shall be to the current version 8 August 2016 with

Change 2, 25 March 2018.

4.2.2.3. 01 45 35; Replace 1.2 System Description with the following: Perform Special Inspection in accordance with the Schedule of Special Inspections and Chapter 17 of IBC. The Schedule of

Special Inspections is included as attachment 01 45 35-A to this specification.

4.2.2.4. 01 74 19; Replace last sentence in Section 1.2 with “A minimum of 60 percent by weight of total project solid waste shall be diverted from the landfill.”

4.2.2.5. 01 74 19; Replace the first sentence in Section 1.3 m. “The waste management plan shall reflect a goal of not less than a 60% level of diversion.

4.2.2.6. 01 74 19; Add C&D Diversion/Disposal Transaction Report Summary (Form 229) and HJB Form

229 Instructions.

4.2.2.7. 06 20 00 Closet shelves, brackets and standards shall be capable of supporting 100 pounds per linear foot. Shelves shall be minimum ¾-inch thick.

https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-200-02 http://www.asaie.army.mil/Public/ES/doc/SDD%20Policy.pdf http://www.publications.usace.army.mil/USACEPublications/EngineerManuals.aspx http://www.wbdg.org/references/pa_dod_energy.php http://www.lewis-mcchord.army.mil/designstandards/

4.2.2.8. 06 61 16 – Solid surfacing material shall be cast, 100% acrylic polymer solid surfacing material.

4.2.2.9. 08 14 00 – Add the following: Wood doors shall be Forest Stewardship Council (FSC) certified.

4.2.2.10. 08 71 00 – Add the following hardware item to the specification:

2.3.25 Low Energy Power Door Operators: BHMA A156.19. Provide operator, interior and exterior wall-mounted push plates, and door signage. Operator shall have the following features:

(1) Aluminum header to conceal operating mechanism.

(2) Manual operation when operator does not have power or actuator button is not depressed.

(3) Manual operating force adjustable from 5 lbf to 15 lbf.

(4) Programmable operator with adjustable opening speed, closing speed, check locations, and open angle from 85 to 110 degrees.

(5) On-off-hold open switch.

(6) Push plate actuators. Provide wireless type, 4 ½” x 4 ½” square plate, stainless steel with blue engraved accessibility symbol and black ABS surface mounting box, with radio frequency transmitter and 9 VDC battery.

(7) Provide operations & maintenance information and instruction for door operators and actuators.

4.2.2.11. Add the following to paragraph 3.3 Hardware Locations:

c. Exit Devices: Mount 44 inches above the finish floor. On existing doors, mount at existing height. Field verify that new exit devices will be compatible with existing door and frame hardware preparation. Existing exit devices are rim type, with surface mounted strike on door frame.

4.2.2.12. 08 71 00 - Add the following door hardware schedule:

a. HW-1

6 ea. Hinges A8112

1 ea. Lockset F84 (classroom function)

2 ea. Flush bolts L04081

1 ea. Dustproof strike L04021

2 ea. Closer/Stop Arm C02021, PT 4D, 4G (stop arm to prevent door from striking nearby walls, doors or windows)

2 ea. Finger protection devices (Activity Room side of each leaf) Note: Finger protection devices shall be omitted from Door #125B for Building 580.

b. HW-2 (45-minute fire-rated door)

3 ea. Hinges A8112

1 ea. Lockset F86 (storeroom function)

1 ea. Closer C02011

1 set Smoke gasket R3Y164

1 ea. Wall Stop L02251

1 ea. Kickplates J102

c. HW-3 (Replaces existing exit device and door closer; remainder of hardware to remain)

1 ea. Exit devices Type 1, F-03 with cylinder dogging and dogging indicator

1 ea. Closer C02021, with hold open arm

d. HW-4

3 ea. Hinges A8111

1 ea. Lockset F82

1 ea. Closer C02021

1 set Smoke Gasket R3Y164

1 ea. Wall Stop L02251

1 ea. Kickplate J102

1 ea. Threshold J38130

e. HW-5

3 ea. Hinges A8112

1 ea. Lockset F82

1 ea. Closer C02011

1 ea. Wall Stop L02251

1 set Smoke gasket R3Y164

f. HW-6

3 ea. Hinges A8112

1 ea. Privacy Lock F76

1 ea. Closer C02011

1 set Smoke Gasket R3Y164

1 ea. Wallstop L02251

g. HW-7 (Low energy door operators replace closers; other hardware on door to remain)

2 ea. Low energy door operator

2 ea. Push plate actuators

4.2.2.13. 08 81 00 – Add the following glazing schedule:

a. Interior glazing in non-fire rated doors and windows shall be clear tempered glass.

b. Interior glazing in fire-rated doors shall be clear fire/safety rated glass. Wire glass is not permitted.

4.2.2.14. 09 06 90 – Revise paragraph 1.2 to provide color boards within 60 days after the Contractor is given Notice to Proceed.

4.2.2.15. 09 30 00 – Add the following: Provide epoxy grout for all floors. Provide penetrating water based sealer at all grout and non-glazed tile surfaces similar to Custom Building Products “Aqua

Mix Sealer’s Choice Gold” with maximum VOC content of 73 g/L. Sealer shall be no-sheen, shall provide stain protection in food preparation and serving areas and allow moisture vapor transmission. Apply in accordance with manufacturer’s instructions, with sufficient applications to prevent water penetration of surface. Clean with a pH neutral cleaner in accordance with manufacturer’s instructions. Submit cleaning instructions with Operations & Maintenance data.

4.2.2.16. 09 30 00 – Add the following to Sustainable Design Requirements: Provide preference to products containing the minimum biobased material content in accordance with the USDA

BioPreferred Program.

4.2.2.17. 09 68 00 – Provide walk off mat (WOM-1) carpet tile, nominal 50 x 50 cm square. Walk off mat carpet shall be 100% solution-dyed UV-stabilized polypropylene fibers, resistant to wear, ultraviolet light and staining, with integral backing for glue down installation. Pile height shall be nominal 3/8-inch with a hobnail or berber pattern for scraping action and needle punch construction for resistance to crushing. Pile weight shall be 52 oz./sq. yd. Product shall be Green

Label Plus certified by the Carpet and Rug Institute. Install using low VOC adhesive (<50 g/L).

4.2.2.18. 09 90 00 – Add the following: Provide low VOC paints meeting the requirements specified in paragraph 3.15 for all interior surfaces; where specified system is not low VOC compliant, submit equal or better performance and durability system that meets low VOC requirements for approval.

Add Interior Paints and Coatings and Exterior Paints and Coatings to the list of designated items under the USDA Biopreferred program in paragraph 2.1. Give preference to biobased paint if it meets the performance requirements of the system specified. Revise the Paint Tables as follows:

a. Interior Metal, including Mechanical, Electrical and Fire Sprinkler systems: Provide specified High

Performance Architectural Latex system (Semigloss)

b. Gypsum Wallboard, where not indicated otherwise: Provide specified Institutional Low Odor/Low

VOC Latex system (Eggshell or Satin gloss)

c. Gypsum Wallboard, where epoxy paint is indicated: Provide MPI System INT 9.2F Epoxy-Modified

Latex system (Semigloss), premium grade (primer, intermediate and top coats).

4.2.2.19. 10 14 02 – Provide room identification signage to match sign type, material, style, shape and color indicated.

4.2.2.20. 10 28 13 – Add the following:

a. Mop and Broom Holder: Provide an 8-inch deep stainless steel utility shelf and integral base with 4 stainless steel rag hooks and 3 spring loaded rubber cams to hold mops and brooms at each janitor's closet.

b. Modify paragraph 2.2.8 Combination Paper Towel Dispenser/Waste Receptacle to provide semi-recessed (maximum opening depth to fit in wall stud cavity) dispenser/receptacle with a hands free, battery operated paper towel dispenser that accommodates 8-inch diameter rolls, 8 inches wide, and waste receptacle with a capacity of 18 gallons.

c. Coordinate all dispensers with using Agency to ensure compatibility with janitorial services contract.

4.2.2.21. 13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT

a. Reference: Add ASCE 7, ASTM E580, UFC 3-301-01 Structural Engineering, UFC3-310-04

Seismic Design of Buildings.

b. 1.2.2. Mechanical Equipment; Revise to read: Mechanical equipment to be seismically protected shall include the following items to the extent required in other sections of these specifications:

(1) Boilers and furnaces

(2) Water Heaters

(3) Water Chiller Units

(4) Refrigerant Piping

(5) Valves and Fittings for Piping

(6) Fan Coil Units

(7) Exhaust Hood

(8) Piping installed more than 12” below the structure.

c. 1.2.3 Mechanical Systems; Revise to read: The following mechanical systems shall be installed as required in these specifications and shall be seismically protected in accordance with this specification.

(1) Any new piping inside the building except as specifically stated below under 1.2.5 “Items not covered by this section.”

(2) Chilled water distribution systems outside of building

(3) Heat distribution systems (supply, return and condensate return outside the building

d. 1.2.4 Contractor Designed Bracing; Replace the first sentence with the following: The contractor shall design the bracing in accordance with UFC 3-310-04, SMACNA Seismic Restraint Manual, ASCE 7 and ASTM E580.

4.2.2.22. 13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT

a. 1.2.2 Miscellaneous Equipment and Systems: Revise to read: The bracing for the following miscellaneous equipment and systems shall be developed by the Contractor in accordance with the requirements of this specification.

(1) Interior partitions

(2) Ceilings

4.2.2.23. 23 54 16.00 10 – Delete the following sections from the specification:

a. 2.3.4 Wall Furnace

b. 2.3.5 Duct Furnace

c. 2.3.6 Infrared Heaters

4.2.2.24. 23 57 10.00 10 – Delete the following sections from the specifications:

a. 2.2.9.2 Grooved Mechanical Fittings

b. 2.2.17 Grooved Mechanical Joints

c. 2.4.9 Radiator Valves

d. 2.7 Flash Tank

e. 2.10 Steam Traps

f. 2.11 Heat Exchangers

g. 2.12 System Equipment and Accessories

h. 2.15 Radiators and Convectors

i. 3.5.3 Steam Systems

j. 3.5.10 Grooved Joints for Copper Tube

k. 3.13.4.2 Steam Air Vents

l. 3.14 Steam Traps

4.2.2.25. 23 64 26 – Delete the following sections from the specification:

a. 2.2 Steel Piping

b. 2.3 Pipe for Steam and Condensate

c. 2.4 Piping for High Pressure Compressed Air Systems

d. 2.11.6 Condenser Water

e. 3.1.4.4 Grooved Mechanical Connections

f. 3.4.3 Condenser Water Quality Test Reports

4.2.2.26. 23 82 01.00 10 – Delete the following sections from the specification:

a. 2.2 Self Contained Furnace

b. 2.3 Furnace Components

c. 2.6 Automatic Vent Dampers

d. 2.7 Humidifiers

e. 2.9 Fuel Oil Systems

f. 2.10 Fuel Gas Supply System

g. 2.11.2 Fibrous Glass Ductwork

h. 3.2.1 Furnaces

i. 3.2.2 Automatic Vent Dampers

j. 3.2.3 Humidifiers

k. 3.2.8 Fibrous Glass Ductwork

4.2.2.27. 23 83 00.00 20 Delete the following sections from the specification:

a. 1.3 Submittals; SD-03 Delete references to the cabinet heaters, baseboards and pedestal units

b. 2.1 Electric Unit and Cabinet Heaters delete references to the cabinet heaters

c. 2.2 Electric Baseboard or Sill or Pedestal Unit

d. 3.1.2 Cabinet Heaters

e. 3.1.4 Baseboard Heaters

f. Appendix A – delete references to the cabinet heaters, baseboards and pedestal units.

4.2.2.28. 26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

a. 1.2.2 Electrical Equipment; Replace with the following:

(1) Electrical equipment shall include the following items to the extent required on the drawings or in other sections of these specifications: Light Fixtures

4.2.3. In addition to the UFGS Specification Sections attached, the below list of Technical Specification

Sections are pertinent to this project and shall be included in the specifications for construction. An omission from this list does not relieve the contractor from adhering to the specifications for that feature of work necessary to meet manufacturer's certification and all applicable building codes.

SECTION NO. SPECIFICATION SECTION NAME

DIVISION 01

01 11 00 SUMMARY OF WORK

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 35 SPECIAL INSPECTION FOR SEISMIC RESISTING SYSTEMS

04 45 35 A SCHEDULE OF SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 62 35 RECYCLED/RECOVERED MATERIALS

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATIONS AND MAINTENANCE DATA

DIVISION 02

02 41 00 DEMOLITION

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

02 83 19.00 10

LEAD BASED PAINT HAZARD ABATEMENT, TARGET HOUSING AND

CHILD OCCUPIED FACILITIES

02 84 16

HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBS

AND MERCURY

SECTION NO. SPECIFICATION SECTION NAME

DIVISION 03

03 15 13.00 10 EXPANSION JOINTS, CONTRACTION JOINTS, AND WATERSTOPS

03 20 01.00 10 CONCRETE REINFORCEMENT

03 30 00 CAST-IN-PLACE CONCRETE

03 62 16 METALLIC NON-SHRINK GROUTING

DIVISION 05

05 12 00 STRUCTURAL STEEL

DIVISION 06

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

DIVISION 07

07 21 16 MINERAL FIBER BLANKET INSULATION

07 60 00 FLASHING AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL AND DOOR LOUVERS

DIVISION 09

09 06 90 COLOR SCHEDULE

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 00 CERAMIC TILE, QUARRY TILE, AND PAVER TILE

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 68 00 CARPET

09 90 00 PAINTS AND COATINGS

DIVISION 10

10 14 02 INTERIOR SIGNAGE

10 26 13 CORNER GUARDS

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 11

11 05 40 COMMON WORK RESULTS FOR FOODSERVICE EQUIPMENT

11 06 40.13 FOODSERVICE EQUIPMENT SCHEDULE

11 31 13 ELECTRIC KITCHEN EQUIPMENT

11 41 11 REFRIGERATED AND FROZEN FOOD STORAGE EQUIPMENT

11 42 00 FOOD PREPARATION EQUIPMENT

SECTION NO. SPECIFICATION SECTION NAME

11 44 00 FOOD COOKING EQUIPMENT

11 48 00 CLEAN AND DISPOSAL EQUIPMENT

DIVISION 13

13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT

13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT

DIVISION 21

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 21 03.00 10 WET CHEMICAL FIRE EXTINGUISHING SYSTEM

DIVISION 22

22 00 00 PLUMBING, GENERAL PURPOSE

22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL

22 07 19.00 40 PLUMBING PIPING INSULATION

DIVISION 23

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 01 30.41 HVAC SYSTEM CLEANING

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93 TESTING ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS

23 09 23

DIRECT DIGITAL CONTROL FOR HVAC AND OTHER LOCAL BUILDING

SYSTEMS

23 11 23.00 10 GAS PIPING SYSTEMS

23 54 16.00 10 HEATING SYSTEM; GAS FIRED HEATERS

23 57 10.00 10

FORCED HOT WATER HEATING SYSTEMS USING WATER AND STEAM

HEAT EXCHANGERS

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 82 01.00 10 WARM AIR HEATING SYSTEMS

23 83 00.00 20 ELECTRIC SPACE HEATING EQUIPMENT

DIVISION 26

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28

28 31 74 INTERIOR FIRE DETECTION AND ALARM SYSTM

5. SUBMITTALS

5.1. Project Submittal Requirements

5.1.1. All submittals shall be submitted in accordance with the specification section titled SUBMITTAL

PROCEDURES. Required submittals are identified in their applicable specification sections.

5.1.2. In addition to the requirements as outlined in the specification section titled SUBMITTAL

PROCEDURES, an electronic copy of each submittal shall be provided to the Government.

Delivery method shall be decided during the CQC coordination meeting.

5.1.3. Contractor will employ RMS 3.0 in the execution of the task order.

5.1.4. See attached Form 4288 (Submittal Register).

5.2. Close-out Submittal Requirements

5.2.1. The Contractor shall provide close-out submittals as required by the contract specifications.

5.2.1.1. The contractor shall provide project as-built drawings meeting the CAD/GIS requirements in the current version (FY17) of JBLM DPW Geospatial Requirements

5.2.1.2. The Contractor shall provide a Letter of non-retention for all contract documents, plans, drawings, and specifications after the destruction of all copies that are not required by the contractor to meet legal requirements.

6. ENVIRONMENTAL AND CULTURAL RESOURCES

6.1. Asbestos Containing Material

6.1.1. Existing suspect materials involved with all disturbance work are assumed to be Asbestos-

Containing Material (ACM). It is the contractor’s responsibility to either test for, or to assume the suspect material is ACM, and that it is abated /encapsulated in accordance with AHERA, Federal, and Local regulations. No Asbestos Hazard Emergency Response Act (AHERA) inspection is required when the suspect materials are assumed to be ACM. The government reserves the right to accept assumptions of ACM-positive, or to require such AHERA surveys to be performed.

6.1.2. Available AHERA survey data is attached (see Haz Bldg Matl Survey 578 and Haz Bldg Matl

Survey 580). The Contractor shall determine the adequacy of the existing survey documentation and include additional AHERA inspections in the proposal when required to accurately delineate asbestos disturbance work.

6.1.3. When performed, inspections shall be accomplished in accordance with the Asbestos Hazard

Emergency Response Act (AHERA), Federal and Local regulations. A Certified AHERA Asbestos

Building Inspector shall perform all inspections. The inspection documentation shall comply with

AHERA, Federal and Local regulations and shall include assessment of each Asbestos-Containing

Material (ACM), its location, quantity, type, friability and percentage of asbestos.

6.1.4. If the tested material is positive for asbestos, or assumed to be ACM and must be disturbed during project execution, contractor shall have a certified Asbestos Contractor perform all asbestos disturbance work necessary to complete the project in accordance with 29 CFR 1926.1101, WAC

296-62-077, 296-65, and PSCAA Regulation 3.4. A certified abatement plan and all other applicable requirements of ‘UFGS 02 82 13.00 10 Asbestos Abatement’ are also required to be submitted and accepted before work is started. If this effort is believed to constitute differing site condition(s), then submit an RFI identifying the situation.

6.2. Lead-Containing Paint

6.2.1. Existing suspect painted surface materials involved in disturbance work will be considered to contain detectable lead paint. It is the contractor’s responsibility to either test for, or to assume the suspect material is either Lead Based Paint (LBP) or Lead Containing Paint (LCP), and that it is abated/encapsulated in accordance with OSHA, HUD, Federal and Local regulations. The government reserves the right to accept assumptions of LCP/LBP-positive, or to require such

LCP/LBP surveys to be performed.

6.2.2. Available lead paint survey is attached (see Haz Bldg Matl Survey 578 and Haz Bldg Matl Survey

580). The Contractor shall determine the adequacy of the existing survey documentation and include additional lead paint inspections in the proposal when required to accurately delineate lead disturbance work.

6.2.3. When performed, testing shall be accomplished in accordance with OSHA and/or HUD guidelines.

A Certified Lead Paint Inspector shall perform lead paint inspections. The inspection documentation shall comply with Federal and Local…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.