Amendment_0004.pdf
PDF 55 KB Posted
- Attached to
- KC-46A Body Tanks Storage Federal contract opportunity
- Solicitation number
- W912DS18B0020
About this file
Amendment 0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Abstract.pdf | ||
| AE601.pdf | ||
| Amendment_0006.pdf | ||
| Amendment__0005.pdf | ||
| Appendix_A_-_B1837_As-Builds.pdf | ||
| Appendix_C_-_JB_MDL_Soil_Contamination.pdf | ||
| Appendix_A_-_B1837_As-Builds.pdf | ||
| Amendment_3_-_KC46_Body_Tank_Storage_-_Plans.pdf | ||
| Amendment_3_-_KC46_Body_Tank_Storage_-_Specs.pdf | ||
| Appendix_B_-_Burlington_Co_Exemption_Notice_Bldg_1837.pdf | ||
| Amendment_0003_SF-30.pdf_Final.pdf | ||
| Amendment_0002.pdf | ||
| Site_Visit.pdf | ||
| Amendment_0001_final.pdf | ||
| Amendment_0001.pdf | ||
| W912DS18B0020.pdf | ||
| Package_2_-_JB_MDL_-_Fuel_Body_Tanks_-_Specifications.pdf | ||
| Package_3_-_JB_MDL_-_Fuel_Body_Tanks_-_CID.pdf | ||
| Package_1_-_JB_MDL_-_Fuel_Body_Tanks_-_Plans.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W16ROE81412884
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1) Answ er Questions to Prospective bidders for informational purposes only.
NOTE: Bidders must acknow ledge receipt of this amendment of date specif iied in the bid (or as amended) by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE BY DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF
BID (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS18B0020
X 9B. DATED (SEE ITEM 11)
09-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Sep-2018
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS18B0020
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0004
Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only” and do not revise the solicitation, plans or specifications.
Question 1. Demolition plan states to demolish existing concrete pavement. Is any rebar or wire mesh in existing concrete pavement?
Answer 1. Available information on existing pavement does not indicate reinforcing in the pavement section.
Question 2. Detail A1 and A2 states to "Compact top 12" to 100% maximum dry density" This is practically unlikely. Will government allow compaction for top 12" above 95% maximum dry density?
Answer 2. Refer to Revised detail A1 and A2 on C-502 to state “Compact top 12” to 95% maximum dry density per ASTM-1557” as issued under previous amendment #3.
Question 3. Detail shows to "relocate existing conduit, equipment, and fixture as required for installation around new overhead door." Are these conduits required to be explosion proof?
Answer 3. The existing hangar bay is a Class I Div. 2 hazardous area and therefore seal off conduit fittings are required.
Question 4. Note on EP100 states to run conduit tight to structure along ceiling of existing hangar bay. Please provide height of roof steel in existing hangar.
Answer 4. The height of the roof steel in the existing hangar is 80’-8” AFF to the bottom of the structure.
Question 5. Section 08 11 13, on the door schedule it says to use hardware set 715 which isn't on there and I can't find it on any other plans. What should be done?
Answer 5. Door hardware is indicated with a “BT” prefix in the submitted door hardware group number 715.
The following have been modified:
AMENDMENT 0003
1. The following DRAWINGS have been REVISED but NOT REISSUED:
- None
2. The following DRAWINGS have been REVISED and REISSUED:
- Drawing P-101
- Drawing M-601
3. The following DRAWINGS have been ADDED:
4. The following DRAWINGS have been DELETED: ]
Prospective
- Appendixes
SPECIFICATIONS
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
- Appendix A – Bldg 1837 As-Builds
- Appendix B – Burlington Co Exemption Notice
- Appendix C – JB MDL Soil Contamination
- Section 03 45 00 – Precast Architectural Concrete
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
- None
3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:
- Section 00 10 00 – Bid Schedule
4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:
- `Section 01 50 00 – Temporary Construction Facilities and Controls – replace paragraph
3.5.7 in its entirety with the following: “NOT USED.”
- Section 03 30 00 – Cast-In-Place Concrete – Add paragraph 2.6 and 2.6.1 as follows: “2.6
FLOOR FINISH MATERIALS
2.6.1 Liquid Chemical Floor Hardener
Hardener must be a colorless aqueous solution containing a blend of inorganic silicate or siliconate material and proprietary components combined with a wetting agent; that penetrates, hardens, and densifies concrete surfaces. Submit manufactures instructions for placement of liquid chemical floor hardener. Use concrete penetrating sealers with a low (maximum 100 grams/liter, less water and less exempt compounds) VOC content.”
- Section 03 30 00 – Cast-In-Place Concrete – Add paragraph 3.9.1.2 as follows:
“3.9.1.2 Chemical-Hardener Treatment Apply liquid-chemical floor hardener where indicated after curing and drying concrete surface.
Dilute liquid hardener with water and apply in three coats. First coat must be one-third strength, second coat one-half strength, and third coat two-thirds strength. Apply each coat evenly and allow to dry 24 hours between coats.
Approved proprietary chemical hardeners must be applied in accordance with manufacturer's printed directions.”
Response to Industy Question for IFB W912DS-18-B-0020 The following Questions and Answers are for informational purposes regarding solicitation W912DS-18-B-0020.
Question 1. From note 6 on sheet MH101 shows connection of hot water piping to existing building heating loop.
This connection point was not visible during the site visit. Please provide existing building drawings which show existing building heating loop to confirm linear feet of pipe needed from new addition to connection point.
Answer 1. Please note that an Appendix A - B1837 As-Builds is hereby issued.
Question 2. Is the soil or concrete contaminated?
Answer 2. Please refer to Appendix C for possible areas of soil contamination. Should there be an anomaly the Government will deal with it accordingly.
Question 3. Will the Government allow either the CQC or Superintendent to perform SSHO duties, ie 2 full-time personnel on job site?
Answer 3. No, please provide staff as outlined in the specifications.
Question 4. As the project is near flight line, what precautions are required? Is there any night time or weekend work involved?
Answer 4. At the moment there are no requirements for night time or weekend work. Should this be the approach taken by the contractor, this will need to be discussed during the initial Kickoff meeting. The requirements for flightline access can be found in appendix to section 01 14 00.
Question 5. Besides soil erosion control permit, what other permits are required that have cost impact?
Answer 5. Please refer to Appendix B as issued with the amendment. There are no other permits that require a fee.
Question 6. Is this project sales tax exempt?
Answer 6. The bidder's attention is directed to FAR 52.229-3, Federal State and Local Taxes. Determination of the applicability of taxes is the bidder's responsibility, and bidders are responsible for including all applicable taxes in their bid. After award, the Contracting Officer may be able to assist with obtaining tax exempt certificates, however, assistance with provision of a form is not an assurance that the contractor will be able to purchase materials that are tax exempt.
Question 7. Drawing S-303, detail A2 - Bracing at fall protection tie-off. Where does this detail apply?
Answer 7. See Framing Plan Legend on S-101. The Roof framing plan (B4/S-101) shows two locations for fall protection anchors that reference Detail A2/S-303. The plan also indicates the approximate location of the anchors to be installed.
Question 8. Please provide specification and thickness for precast wall panels.
Answer 8. Precast wall panels are 8” thick (typ.) and should match the precast wall panels at the existing building, as shown on Architectural drawings. Reference 2/AE502 et. al. Specification 03 45 00 is issued with this amendment.
Question 9. Please provide specification for SC (Sealed Concrete).
Answer 9. Sealed concrete specified in Section 03 30 00 - 2.6 as revised in this Amendment.
Question 10. Are all equipment, power, HVAC controls included in project to be explosion proof? Answer 10. All items shall be explosion proof. Drawing sheet M-601 is being re-issued via amendment for clarification
Question 11. Please provide connection point of gas line. Location could not be determined at site visit.
Answer 11. Please refer to Appendix A for as-builds.
(End of Summary of Changes)