Amendment_0003_SF-30.pdf_Final.pdf

PDF 73 KB Posted

Attached to
KC-46A Body Tanks Storage Federal contract opportunity
Solicitation number
W912DS18B0020
Issued by
Department of the Army Corps of Engineers Engineering District New York

About this file

Amendment 0003

View the file

Other files for this federal contract opportunity

Other files attached to KC-46A Body Tanks Storage, newest first.
File Type Posted
Bid_Abstract.pdf PDF
AE601.pdf PDF
Amendment_0006.pdf PDF
Amendment__0005.pdf PDF
Amendment_0004.pdf PDF
Appendix_A_-_B1837_As-Builds.pdf PDF
Appendix_C_-_JB_MDL_Soil_Contamination.pdf PDF
Appendix_A_-_B1837_As-Builds.pdf PDF
Amendment_3_-_KC46_Body_Tank_Storage_-_Plans.pdf PDF
Amendment_3_-_KC46_Body_Tank_Storage_-_Specs.pdf PDF
Appendix_B_-_Burlington_Co_Exemption_Notice_Bldg_1837.pdf PDF
Amendment_0002.pdf PDF
Site_Visit.pdf PDF
Amendment_0001_final.pdf PDF
Amendment_0001.pdf PDF
W912DS18B0020.pdf PDF
Package_2_-_JB_MDL_-_Fuel_Body_Tanks_-_Specifications.pdf PDF
Package_3_-_JB_MDL_-_Fuel_Body_Tanks_-_CID.pdf PDF
Package_1_-_JB_MDL_-_Fuel_Body_Tanks_-_Plans.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16ROE81412884

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1) Answ er Questions to Prospective bidders for information purposes only.

2) Incorporate changes to the bid scheldule, specif ications, draw ings, and appendixes.

NOTE: Bidders must acknow ledge receipt of this amendement of date specif iied in the bid (or as amended ) by one of the follow ing methods:

In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE BY DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE WITHDRAWAL OF

BID (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Sep-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS18B0020

X 9B. DATED (SEE ITEM 11)

09-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Sep-2018

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS18B0020

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job KC46 Add to B1837 for Body Tanks Storage

FFP

Construction of the Addition to B1837 for Body Tank Storage, JBMDL: All work (includes all plant, labor, and material) for the construction of Fuel Body Tank Storage as described in the plans and specifications except for work included in items below.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Job KC46 Add to B1837 for Body Tanks Storage

FFP

Site work, all work outside the five-foot line of the building perimeter.

0003 1 Job KC46 Add to B1837 for Body Tanks Storage

FFP

All work for the Final Record Drawing Submission (See Section 00 73 00).This CLINS is prepriced at $25,000.00.

$25,000.00

0004 1000 Cubic Feet OPTION KC46 Add to B1837 for Body Tanks Storage

FFP

Disposal of contaminated soil at an approved facility based on the results of sampling and testing (Estimated quantities)

TOTALS

BASE TOTAL AMOUNT (CLIN 0001 -0003) $ __________________

OPTION TOTAL AMOUNT (CLIN 0004) $ __________________

BASE AMOUNT PLUS OPTION AMOUNT (CLIN 0001- 0004) $ __________________

NOTES:

1. Bidders are required to bid on all the Base Bid and any Optional Bid Items or their bids will be rejected.

2. Bidders are reminded that they must bid on the issued plans and specifications as amended. Any deviations, conditions or attachments made by the bidder himself, thereto, may render the bid non-responsive and be cause for its rejection.

3. Line item 0003 is pre-priced at $25,000.00 and this price shown may not be changed. See Section 00 73 00 for Final Record Drawing definition and requirement.

4. The Basis of Evaluation will be the lowest responsive, responsible bid based on the Total Amount for the Base Bid Items plus the Optional Bid Items (Line Items 0001 thru 0004).

5. Option 1 - At any time prior to 150 calendar days after issuance of the Notice to Proceed of the contract, the Government at its option, may direct the Contractor, by written order, to perform the work and/or services provided under this Option. Execution of this option will not alter the project completion date of the contract.

6. The Bid Acceptance Period is as stated on Standard Form 1442.

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0003

1. The following DRAWINGS have been REVISED but NOT REISSUED:

- None

2. The following DRAWINGS have been REVISED and REISSUED:

- Drawing P-101

- Drawing M-601

3. The following DRAWINGS have been ADDED:

4. The following DRAWINGS have been DELETED: ]

Prospective

- Appendixes

SPECIFICATIONS

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

- Appendix A – Bldg 1837 As-Builds

- Appendix B – Burlington Co Exemption Notice

- Appendix C – JB MDL Soil Contamination

- Section 03 45 00 – Precast Architectural Concrete

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

- None

3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:

- Section 00 10 00 – Bid Schedule

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:

- `Section 01 50 00 – Temporary Construction Facilities and Controls – replace paragraph

3.5.7 in its entirety with the following: “NOT USED.”

- Section 03 30 00 – Cast-In-Place Concrete – Add paragraph 2.6 and 2.6.1 as follows: “2.6

FLOOR FINISH MATERIALS

2.6.1 Liquid Chemical Floor Hardener

Hardener must be a colorless aqueous solution containing a blend of inorganic silicate or siliconate material and proprietary components combined with a wetting agent; that penetrates, hardens, and densifies concrete surfaces. Submit manufactures instructions for placement of liquid chemical floor hardener. Use concrete penetrating sealers with a low (maximum 100 grams/liter, less water and less exempt compounds) VOC content.”

- Section 03 30 00 – Cast-In-Place Concrete – Add paragraph 3.9.1.2 as follows:

“3.9.1.2 Chemical-Hardener Treatment Apply liquid-chemical floor hardener where indicated after curing and drying concrete surface.

Dilute liquid hardener with water and apply in three coats. First coat must be one-third strength, second coat one-half strength, and third coat two-thirds strength. Apply each coat evenly and allow to dry 24 hours between coats.

Approved proprietary chemical hardeners must be applied in accordance with manufacturer's printed directions.”

Response to Industy Question for IFB W912DS-18-B-0020

The following Questions and Answers are for informational purposes regarding solicitation W912DS-18-B-0020.

(Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors “for information only ”and do not revise the solicitation, plans or specifications.).

Question 1. From note 6 on sheet MH101 shows connection of hot water piping to existing building heating loop.

This connection point was not visible during the site visit. Please provide existing building drawings which show existing building heating loop to confirm linear feet of pipe needed from new addition to connection point.

Answer 1. Please note that an Appendix A - B1837 As-Builds is hereby issued.

Question 2. Is the soil or concrete contaminated?

Answer 2. Please refer to Appendix C for possible areas of soil contamination. Should there be an anomaly the Government will deal with it accordingly.

Question 3. Will the Government allow either the CQC or Superintendent to perform SSHO duties, ie 2 full-time personnel on job site?

Answer 3. No, please provide staff as outlined in the specifications.

Question 4. As the project is near flight line, what precautions are required? Is there any night time or weekend work involved?

Answer 4. At the moment there are no requirements for night time or weekend work. Should this be the approach taken by the contractor, this will need to be discussed during the initial Kickoff meeting. The requirements for flightline access can be found in appendix to section 01 14 00.

Question 5. Besides soil erosion control permit, what other permits are required that have cost impact?

Answer 5. Please refer to Appendix B as issued with the amendment. There are no other permits that require a fee.

Question 6. Is this project sales tax exempt?

Answer 6. The bidder's attention is directed to FAR 52.229-3, Federal State and Local Taxes. Determination of the applicability of taxes is the bidder's responsibility, and bidders are responsible for including all applicable taxes in their bid. After award, the Contracting Officer may be able to assist with obtaining tax exempt certificates, however, assistance with provision of a form is not an assurance that the contractor will be able to purchase materials that are tax exempt.

Question 7. Drawing S-303, detail A2 - Bracing at fall protection tie-off. Where does this detail apply?

Answer 7. See Framing Plan Legend on S-101. The Roof framing plan (B4/S-101) shows two locations for fall protection anchors that reference Detail A2/S-303. The plan also indicates the approximate location of the anchors to be installed.

Question 8. Please provide specification and thickness for precast wall panels.

Answer 8. Precast wall panels are 8” thick (typ.) and should match the precast wall panels at the existing building, as shown on Architectural drawings. Reference 2/AE502 et. al. Specification 03 45 00 is issued with this amendment.

Question 9. Please provide specification for SC (Sealed Concrete).

Answer 9. Sealed concrete specified in Section 03 30 00 - 2.6 as revised in this Amendment.

Question 10. Are all equipment, power, HVAC controls included in project to be explosion proof? Answer 10. All items shall be explosion proof. Drawing sheet M-601 is being re-issued via amendment for clarification

Question 11. Please provide connection point of gas line. Location could not be determined at site visit.

Answer 11. Please refer to Appendix A for as-builds.

SPECIFICATIONS