Amendment 0001

View the file

Other files

File Type Posted
Amendment_0002.pdf PDF
W912DS-13-R-0033_Jacob_Riis_Park.pdf PDF
JACOB_RIIS_LOT_RESTOR_FINAL_DWG.PDF PDF
Specification100__8-8-13.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

a. Change Site Visit from 23 Sept 2013 at 10:00AM to 24 Sept 2013 at 10: 00AM.

b. Issue Revised Wage Determination General Decision Number: NY130003 09/06/2013 NY3.

Proposal due date remains 11 October 2013 at 2:00PM EST.

NOTE: Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 15

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Sep-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-13-R-0033

X 9B. DATED (SEE ITEM 11)

11-Sep-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Sep-2013

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-13-R-0033

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits will be held on 24 September 2013 at 10:00AM EST. The point of contact is:

Name: Matthew Emigholz Address: 26 Federal Plaza, New York, NY 10278 Telephone: 917-790-8248

(End of provision)

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

WAGE DETERMINATION REV 01

General Decision Number: NY130003 09/06/2013 NY3

Superseded General Decision Number: NY20120003

State: New York

Construction Types: Building, Heavy, Highway and Residential

Counties: Bronx, Kings, New York, Queens and Richmond Counties in New York.

BUILDING & RESIDENTIAL CONSTRUCTION PROJECTS (includes single family homes and apartments up to and including 4 stories), HEAVY AND HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 01/04/2013 1 01/11/2013 2 01/18/2013 3 02/08/2013 4 03/22/2013 5 04/26/2013

6 05/03/2013 7 05/17/2013 8 05/31/2013 9 06/07/2013 10 07/05/2013 11 07/26/2013 12 08/02/2013 13 08/09/2013 14 08/16/2013 15 08/30/2013 16 09/06/2013

ASBE0012-001 07/01/2013

Rates Fringes

Asbestos Workers/Insulator Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.....................$ 64.13 29.04

HAZARDOUS MATERIAL HANDLER.......$ 30.00 9.10

BOIL0005-001 01/01/2013

Rates Fringes

BOILERMAKER......................$ 49.47 33%+22.87+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Thanksgiving Day, Memorial Day, Independence Day, Labor Day and Good Friday, Friday after Thanksgiving, Christmas Eve Day and New Year's Eve

BRNY0001-001 07/01/2013

Rates Fringes

BRICKLAYER.......................$ 49.09 22.93

MASON - STONE....................$ 55.56 26.75

BRNY0001-002 07/01/2012

Rates Fringes

Pointer, cleaner and caulker.....$ 42.69 21.74

BRNY0004-001 07/01/2012

Rates Fringes

MARBLE MASON.....................$ 54.19 28.3

BRNY0007-001 01/01/2011

Rates Fringes

TERRAZZO FINISHER................$ 42.86 28.55

TERRAZZO WORKER/SETTER...........$ 44.39 28.55

BRNY0020-001 07/01/2012

Rates Fringes

MARBLE FINISHER..................$ 43.60 27.10

BRNY0024-001 07/01/2012

Rates Fringes

BRICKLAYER

MARBLE POLISHERS............$ 38.03 20.90

BRNY0052-001 06/04/2012

Rates Fringes

Tile Layer.......................$ 50.25 27.66

BRNY0088-001 06/04/2012

Rates Fringes

TILE FINISHER....................$ 39.67 24.16

CARP0001-009 07/01/2008

Rates Fringes

Carpenters:

Carpenters & Soft floor layers......................$ 43.02 35.96

CARP0740-001 07/01/2010

Rates Fringes

MILLWRIGHT.......................$ 46.19 44.93

CARP1456-004 01/01/2011

Rates Fringes

Dock Builder & Piledrivermen

DOCKBUILDERS................$ 46.21 38.36

CARP1456-005 01/01/2011

Rates Fringes

Diver Tender.....................$ 41.16 38.46 Diver............................$ 58.01 38.46

CARP1536-001 10/01/2010

Rates Fringes

Carpenters:

TIMBERMEN...................$ 42.63 31.32

ELEC0003-001 11/09/2011

ELECTRICIAN

Electricians................$ 51.00 23.672 Jobbing, and maintenance and repair work.............$ 25.30 15.13+a

PAID HOLIDAYS:

a. New Years Day, Martin Luther King, Jr.'s Birthday, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Thanksgiving Day, the day after Thanksgiving Day, and Christmas Day

ELEC1049-001 03/31/2013

QUEENS COUNTY

Rates Fringes

Line Construction (Substation and Switching structures pipe type cable installation and maintenance jobs or projects;

Railroad electrical distribution/transmission systems maintenance (when work is not performed by railroad employees) Overhead and Underground transmission/distribution line work. Fiber optic, telephone cable and equipment) Groundman...................$ 28.99 17.83 Heavy Equipment Operator....$ 38.65 18.14 Lineman and Cable Splicer...$ 48.31 23.07 Tree Trimmer................$ 23.06 28.5%+9.75

ELEV0001-002 03/17/2013

Rates Fringes

ELEVATOR MECHANIC

Elevator Constructor........$ 57.01 27.605+a+b Modernization and Repair....$ 45.14 27.455+a+b

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Good Friday, President's Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.

b. PAID VACATION: An employee who has worked less than 5 years shall recieve vacation pay credit on the basis of 4% of his hourly rate for all hours worked; an employee who has worked 5 to 15 years shall receive vacation pay credit on the basis of 6% of his hourly rate for all hours worked;

an employee who has worked 15 or more years shall receive vacation pay credit on the basis of 8% of his hourly rate for all hours worked.

ENGI0014-001 07/01/2013

Rates Fringes

Pavement equipment operator Asphalt Plants..............$ 54.17 28.65+a Asphalt roller..............$ 64.04 28.65+a Asphalt spreader............$ 65.76 28.65+a Power Equipment Operator

(HEAVY & HIGHWAY)

GROUP 1....................$ 85.00 28.65

GROUP 10...................$ 61.53 28.65

GROUP 11...................$ 57.46 28.65

GROUP 12...................$ 58.74 28.65

GROUP 13...................$ 59.21 28.65

GROUP 14...................$ 44.63 28.65

GROUP 15...................$ 41.44 28.65

GROUP 2....................$ 70.10 28.65

GROUP 3....................$ 72.34 28.65

GROUP 4....................$ 70.63 28.65

GROUP 5....................$ 69.23 28.65

GROUP 6....................$ 66.45 28.65

GROUP 7....................$ 67.70 28.65

GROUP 8....................$ 65.76 28.65

GROUP 9....................$ 64.34 28.65

Steel erector Compressors, Welding Machines....................$ 41.84 28.65 Cranes, Hydraulic Cranes, 2 drum derricks, Forklifts, Boom Trucks......$ 70.50 28.65 Three drum derricks.........$ 73.37 28.65 Utility Laborer Horizontal Boring Rig.......$ 62.53 28.65 Off shift compressors.......$ 51.93 28.65 Utility Compressors.........$ 41.18 28.65

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Tower crane

GROUP 2: Backhoes, power shovel, Hydraulic clam shells, moles and machines of a similar type

GROUP 3: Mine hoists and crane, etc. used as mine hoists

GROUP 4: Gradalls, keystones, cranes (with digging buckets), bridge cranes, trenching machines, vermeer cutter and machines of a similar nature

GROUP 5: Piledrivers, derrick boats, tunnel shovels

GROUP 6: All drills, and machines of a similar nature

GROUP 7: Back filling machines, cranes, mucking machines, dual drum pavers

GROUP 8: Mixers (concrete w/loading attachments), concrete pavers, cableways, land derricks, power house (low pressure units), concrete pumps

GROUP 9: Concrete plants, well drilling machines, stone crushers double drum hoist, power house (other than above)

GROUP 10: Concrete mixers

GROUP 11: Elevators

GROUP 12: Concrete breaking machine, Hoists (single drum), load masters, locomotive and dinkies over 10 tons

GROUP 13: Vibratory console

GROUP 14: Compressors (portable 3 or more in battery), tugger machine (caissons), well point pumps, chum drill

GROUP 15: Boilers, (high pressure, compressors (portable, single, or 2 in battery, not over 100' apart), pumps (river cofferdam and welding machines (except where arc is operated by members of local 15) push button machines, all engines irrespective of power (power pac) used to drive auxilliary equipment, air, hydraulic etc.

PREMIUMS ON CRANES (Crawler or Truck):

100' to 149' boom - add .50 150' to 249' boom - add .75 250' to 349' boom - add 1.00 350' to 450' boom - add 1.50

Premiums for Cranes on Steel Erection:

100' to 149' boom - add 1.75 150' to 249' boom - add 2.00 250' to 349' boom - add 2.25 350' to 450' boom - add 2.75 Tower crane - add 2.00

FOOTNOTE:

a. Paid Holidays: New Year's Day; Lincoln's Birthday;

Washington's Birthday; Memorial Day; Independence Day;

Labor Day; Veterans Day; Columbus Day; Election Day;

Thanksgiving Day; and Christmas Day; provided the employee works one day the payroll week in which the holiday occurs.

ENGI0014-002 07/01/2013

Rates Fringes

Power Equipment Operator

BUILDING & RESIDENTIAL

GROUP 1....................$ 65.83 28.65+a GROUP 2....................$ 69.74 28.65+a GROUP 3....................$ 63.58 28.65+a GROUP 4....................$ 57.82 28.65+a GROUP 5....................$ 43.28 28.65+a

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Double drum

GROUP 2: Stone derrick, cranes, hydraulic cranes, boom trucks

GROUP 3: 4 pole Hoist, Single Drum Hoists

GROUP 4: Fork lift, house cars, plaster (platform machine), plaster bucket, concrete pump and all other equipment used for hoisting material

GROUP 5: Compressors, welding machines (cutting concrete work), paint spraying, sand blasting, pumps (with the exclusion of concrete pumps), house car (settlement basis only), all engines irrespective of power (power pac) used to drive auxiliary equipment, air, hydraulic, etc., boilers

Premiums for Cranes:

100'-149' boom - add 1.75 150'-249' boom - add 2.00 250'-349' boom - add 2.25 350'-450' boom - add 2.75 Tower cranes add 2.00

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Lincoln's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Columbus Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the payroll week in which the holiday occurs

IRON0040-002 07/01/2013

BRONX, NEW YORK, RICHMOND

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 46.75 50.98

IRON0046-003 07/01/2011

Rates Fringes

IRONWORKER

METALLIC LATHERS AND

REINFORCING IRONWORKERS.....$ 40.00 24.97

IRON0197-001 01/01/2013

Rates Fringes

IRONWORKER

STONE DERRICKMAN............$ 41.00 36.57

IRON0361-002 07/01/2013

KINGS, QUEENS

Rates Fringes

Ironworkers:

(STRUCTURAL)................$ 46.75 50.98

* IRON0580-001 07/01/2013

IRONWORKER, ORNAMENTAL...........$ 42.30 42.12

LABO0006-001 07/01/2011

Rates Fringes

Laborers:

BUILDING CONSTRUCTION

CEMENT AND CONCRETE

WORKERS....................$ 38.98 26.08

LABO0029-001 07/01/2012

Rates Fringes

Laborers:

Heavy Blasters (hydraulic trac drill).....................$ 41.30 29.25 Blasters...................$ 40.55 29.25 Hydraulic Trac Drill.......$ 29.92 29.25 Jackhammers, Chippers, Spaders, Concrete Breakers, All Other Pneumatic Tools, Walk Behind Self-Propelled Hydraulic Asphalt and Concrete Breaker...........$ 34.64 29.25 Powder Carriers............$ 31.08 29.25 Wagon; Airtrac; Quarry Bar Drill Runners..........$ 35.07 28.00

LABO0078-001 02/01/2013

Rates Fringes

LABORERS

BUILDING CONSTRUCTION

ASBESTOS (Removal, Abatement, Encapsulation or Decontamination of asbestos); LEAD; &

HAZARDOUS WASTE LABORERS

(Hazardous Waste, Hazardous Materials, Biochemical and Mold Remediation, HVAC, Duct Cleaning, Re-spray Fireproofing, etc).........$ 35.90 14.75

LABO0079-001 07/01/2013

Rates Fringes

Laborers Building Construction Demolition Laborers Tier A.....................$ 35.34 18.9 Tier B.....................$ 24.53 13.37

Mason Tenders...............$ 37.00 23.35

CLASSIFICATIONS

TIER A: Responsible for the removal of all interior petitions and structural petitions that can consist of sheet rock, block or masonry. Also, all structural slab openings for ducts, mechanical, shafts, elevators, slab openings and exterior walls where the building is not being completely demolitioned.

TIER B: Responsible for shoveling of debris into containers, pushing containers from the inside to the outside of the building.

LABO0147-001 07/01/2012

Rates Fringes

LABORERS (FREE AIR & TUNNEL).....$ 58.30 27.20

Maintenance Men, Inside Muck Lock Tenders, Pump Men, Electricians, Cement Finishers, Caulkers, Hydraulic Men, Shield Men, Monorail Operators, Motor Men, Conveyor Men, Powder Carriers, Pan Men, Riggers, Chuck Tenders, Track Men Painters, Nippers, Brakemen, Cable Men, Hose Men, Grout Men, Gravel Men, Form Workers, Concrete Workers, Tunnel Laborers, Mole Nipper (one (1) Mole Sipper per Working Shaft per Shift for up to and including Two (2) Moles

LABO0731-001 07/01/2011

Rates Fringes

Laborers:

Building, Heavy and Residential Construction

UNSKILLED..................$ 38.20 30.27

UTILITY LABORER............$ 38.05 30.27

Heavy & Highway Construction

LABORER/EXCAVATION

{Asbestos, Lead, Hazardous Waste Removal (including soil)..........$ 36.64 26.21

Paid Holidays: Labor Day and Thanksgiving Day

LABO1010-001 07/01/2011

Rates Fringes

Laborers:

HIGHWAY CONSTRUCTION

Fence Installer & Repairer.$ 38.34 30.25

FORMSETTERS................$ 42.21 30.25

LABORERS...................$ 38.34 30.25

Landscape Planting & Maintenance................$ 38.34 30.25 Maintenance Safety Surface.$ 38.34 30.25

Slurry/Sealcoater/Play Equipment Installer........$ 38.34 30.25 Small Equipment Operator (Not Operating Engineer)...$ 38.34 30.25 Small Power Tools Operator.$ 38.34 30.25

FOOTNOTES:

a. PAID HOLIDAYS: Memorial Day, Fourth of July, Labor Day, Columbus Day, Election Day and Thanksgiving Day, provided the employee has worked one (1) day in the calendar week in which the said holiday occurs.

LABO1010-002 07/01/2011

Rates Fringes

Laborers-Asphalt Construction:

Micro Paver.................$ 44.86 30.25 Raker.......................$ 44.37 30.25 Screedperson................$ 44.86 30.25 Shoveler (Production Paving Only)................$ 41.08 30.25 Small Equipment Operator (Asphalt)...................$ 41.08 30.25

PAIN0009-001 05/01/2013

Rates Fringes

GLAZIER..........................$ 42.00 33.14

Painters:

Painters, Drywall Finishers, Lead Abatement Worker......................$ 41.75 20.87 Spray, Scaffold and Sandblasting................$ 44.75 20.87

PAIN0806-001 10/01/2012

Rates Fringes

Painters:

Structural Steel and Bridge.$ 47.00 32.08

PAIN1974-001 12/26/2012

Rates Fringes

Painters:

Drywall Tapers/Pointers.....$ 43.82 22.01

PLAS0262-001 02/01/2012

Rates Fringes

PLASTERER........................$ 40.78 26.80

PLAS0262-002 02/01/2012

KINGS AND QUEENS COUNTIES

PLASTERER........................$ 40.78 26.80

PLAS0780-001 07/01/2013

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 44.63 38.95

PLUM0001-001 01/01/2013

Rates Fringes

PLUMBER

MECHANICAL EQUIPMENT AND

SERVICE

Any repair and/or replacement of the present plumbing system that does not change the existing roughing..........$ 33.21 16.05

PLUMBERS:...................$ 52.86 36.21

PLUM0638-001 06/27/2012

Rates Fringes

PLUMBER

SERVICE FITTERS.............$ 26.30 2.55

SPRINKLER FITTERS,

STEAMFITTERS................$ 51.25 49.54

Service Fitter work shall consist of all repair, service and maintenance work on domestic, commercial and industrial refrigeration, air conditioning and air cooling, stoker and oil burner apparatus and heating apparatus etc., including but not exclusively the charging, evacuation, leak testing and assembling for all machines for domestic, commercial and industrial refrigeration, air conditioning and heating apparatus. Also, work shall include adjusting, including capacity adjustments, checking and repairing or replacement of all controls and start up of all machines and repairing all defects that may develop on any system for domestic, commercial and industrial refrigeration and all air conditioning, air cooling, stoker and oil burner apparatus and heating apparatus regardless of size or type.

ROOF0008-003 07/01/2012

Rates Fringes

ROOFER...........................$ 39.00 27.35

SHEE0028-002 09/15/2011

Rates Fringes

SHEET METAL WORKER

BUILDING CONSTRUCTION.......$ 48.90 36.00

RESIDENTIAL CONSTRUCTION....$ 27.22 16.48

TEAM0282-001 07/01/2013

Rates Fringes

Truck drivers:

TRUCK DRIVERS:

Asphalt....................$ 38.57 40.1025+a Euclids & Turnapulls.......$ 38.105 40.1025+a High Rise..................$ 46.01 38.9125+a

FOOTNOTES:

PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Election Day, Veterans' Day (Armistice Day), Thanksgiving Day, Day after Thanksgiving and Christmas Day. Employees working two (2) days in the calendar week in which a holiday falls are to be paid for such holiday, provided that they shape each remaining workday during such calendar week.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.

The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.

0000/9999: weighted union wage rates will be published annually each January.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

(End of Summary of Changes)