Amendment_0002.pdf
PDF 39 KB Posted
- Attached to
- Jacob Riis Park Restoration, Queens, NY.
- Solicitation number
- W912DS-13-R-0033
About this file
Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912DS-13-R-0033_Amendment_0001.pdf | ||
| W912DS-13-R-0033_Jacob_Riis_Park.pdf | ||
| JACOB_RIIS_LOT_RESTOR_FINAL_DWG.PDF | ||
| Specification100__8-8-13.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
a. Provide ANSWERS to QUESTIONS for INFORMATION PURPOSES ONLY.
b. Request for Proposal due date remains 11 OCT 2013 at 2:00PM Eastern Standard Time (EST).
NOTE: Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow ing methods: in the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Oct-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-13-R-0033
X 9B. DATED (SEE ITEM 11)
11-Sep-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Oct-2013
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 1843
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS-13-R-0033
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
W912DS-13-R-0033 Amendment #2 – Jacob Riis Park Parking Lot Restoration The following plans have been revised but not reissued:
‐ CP-501 – Add the following note to detail F6: “The lack length is equal to 38 times the diameter of the wire in the wire mesh.”
‐ CP-501 – Add the following note: “Tie Bars and dowels are 30” long.”
Questions and Answers:
Question #1: The notes on sheet CP-501 state to fill any voids under the slab with stone base. There is no bid item for the stone. Where in the bid should we put this cost? Since it is difficult to quantify the amount of stone required, will a unit price bid or an allowance be considered?
Answer #1: The note defines what you will need to do if you encounter a void. The Government does not know if you will encounter voids and if you do, the quantity of stone required to fill them. Voids found would be considered a differing site conditions and the contract should be modified to deal with them.
Do not account for voids in your price proposal.
Question #2: Bid Item No.10 is a lump sum for the striping of the parking lot. In order to accurately quantify this work, will a striping plan or quantity be given to us prior to the bid?
Answer #2: Please see note #5 on plan sheet G-001. Match existing striping and marking patterns in kind adhering to section 640 of NYSDOT standard specifications.
Question #3: Sheet CP-501, detail F6 for full depth repairs for wire mesh only, what is the required lap length?
Question #3: The lap length is 38 times the diameter of the wire in the wire mesh.
Question #4: With regard to the full depth repairs for wire mesh only, does the shaded area on the partial paving plans show the limits of the full depth saw cut or the partial depth saw cut?
Answer #4: The area shows the width of the full depth cut. This detail is only used when the full depth cut is less than 3 ft wide.
Question #5: Are the new dowels and mesh to be epoxy coated? The spec references both coated and plain steel.
Answer #5: Dowels and mesh don't have to be coated since the area of the repairs is small but in salty environments it is recommended to use stainless steel.
Question #6: In the specifications for partial depth patching of rigid pavement, we are restricted to using 30 pound chipping hammers. There is no spec section for the full depth repairs. Are there any restrictions on the methodology for concrete removal for a full depth repair?
Answer#6: The restriction applies to partial depth repair not to full cut depth.
Questions#7: The specs refer to the drawings for the tie bars and dowels. I see they are placed 30” on center but I am unable to locate the length of each tie bar/dowel.
Answer #7: The tie bars and dowels are 30” long.
Question #8: Please clarify if this project is OCIP.
Answer #8: No it is not OCIP, please see Section 00 80 00 paragraph 9 for insurance requirements.
Question #9: Ref: Section 0010: Bid Item#9: Drawings do not show layout of the median turf. For bidding purposes, please provide approx. quantity for Re-seeding of the median turf.
Answer #9: The Median is 18 ft wide and the lengths can be seen on the plan set.
Question #10: If the actual repair areas in the field end up being larger than the repair areas identified in the drawings, do we get additional compensation for the extra work performed?
Answer #10: The contract requirements are represented in the solicitation’s plans and specifications.
Any additional work would need a modification to the contract.
Question #11: If we are not a certified small business; are we eligible to bid this project?
Answer#11: See spec section 00 22 11 paragraph 1.3.
Question #12: Ref: Special Contract Requirements: 1E: Phasing: During pre-bid, it was discussed that the contractor could perform the demolition work in multiple phases at the same time provide we maintain the flow of traffic. Please confirm that we are not required to complete all work in one phase before moving on to the next phase.
Answer #12: The Parking lot will remain open to the public during construction and it will be the contractor’s job to secure the construction site and to protect the public from any potential accidents that could occur while driving and/or walking through an area with large holes in the parking lot. The contractor will also need to keep an area open to accommodate parked cars. The contractor shall also be responsible for erosion control measures and having open areas for long durations may increase the erosion of the sand beneath the concrete, which the contractor shall be responsible for replacing prior to new concrete placement.
Question #13: Can we close the bays one at a time to the public, till all work is completed in that bay.
Answer #13: Yes.
Question #14: Does the perimeter have to be protected with any fencing or mpt measures?
Answer #14: Construction site safety and security are the responsibility of the construction contractor.
Question #15: Section 015720.0010, page 11, Section 3.5.5 states that “Waste water from construction activities,……, will not be allowed to enter water ways or to be discharged prior to being treated to remove pollutants.” Could you please clarify. Does this infer that when water is used to clean the inside surface of the existing concrete (after it is exposed from the removal of the spall area), the water used needs to be collected into a frac tank? This does seem practical. I would appreciate your response.
Answer #15: No, this does not apply to cleaning the inside surface of existing concrete. This applies to “Waste water from construction activities, such as onsite material processing, concrete curing, foundation and concrete clean-up, water used in concrete trucks, forms, etc.” So it would apply to concrete clean up on the new concrete and any water used in curing, forms or concrete trucks.
Question #16: The specifications and drawings do not specify the type of wiremesh to be used.
Answer #16: Wire Mesh shall meet the requirements of ASTM A184/A184M and is a required construction shop drawing submittal.
(End of Summary of Changes)