W912D1-23-Q-0026 P00002.pdf
PDF 301 KB Posted
- Attached to
- Aircraft Ramp System Kits Federal contract opportunity
- Solicitation number
- W912D1-23-Q-0026
About this file
This modification amends solicitation W912D1-23-Q-0026 for aircraft ramp system kits. The amendment clarifies the description of CLIN 0002 to indicate brand name or equal is acceptable and includes storage boxes as part of the kit. It also adds a questions and answers section addressing considerations for alternate designs with shorter ramp lengths, traction surfaces other than rungs/cleats, and containers integrated into the kit. Delivery of all components on a 463L pallet for C-5/C-17 transport is required. The amendment seeks to allow for design flexibility while maintaining required aircraft access and transport capabilities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912D1-23-Q-0026 P00002 CON. COPY.pdf | ||
| Combined Synopsis-Solicitation W912D1-23-Q-0026.pdf | ||
| Amendment 1 to W912D1-23-Q-0026 SF 1449.pdf | ||
| W912D1-23-Q-0026 Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0012001090
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Reason for amendment:
- Add "Questions and Answ ers" section
- CLIN clarif ication
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Sep-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912D123Q0026
X 9B. DATED (SEE ITEM 11)
08-Sep-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Sep-2023
CODE
408TH CONTRACTING SUPPORT BDE
RCC-KU, CAMP ARIFJAN KUWAIT
APO AE 09366
W912D1 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912D123Q0026
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
CLIN 0002
The CLIN extended description has changed from:
Storage box for ramp system with a minimum limited warranty of one (1) year.
To:
- Brand Name or Equal
- Storage box for ramp system with a minimum limited warranty of one (1) year.
The following have been added by full text:
QUESTIONS AND ANSWERS
The following section will include questions and answers through subsequent amendments to the solicitation.
Question Response
Will quotes be considered on a shoring kit specifically designed and fabricated for the specific mission, but manufactured by another company?
Yes, companies with different designs, but same functionality should be considered. Example: had overall 6 degree or less ramp angle, axle LBS rating, portable, ATTL certified, ect…..
Will quotes be considered on a shoring kit that utilizes a pooched plate traction surface, designed specifically for small helicopter tires, Instead of using rungs/cleats for traction?
Yes, pooched center ramps designed specifically for rotary aircraft should be considered.
The schedule, on page 3 of the solicitation, details the individual component sizes. The “Approach Ramp”, fourth bullet, states it must be 100-inches long. That will fit on a 463L pallet, but will NOT fit in an 8-foot pickup bed. Will quotes be considered for a shoring kit that has different component lengths, but still creates an overall assembly length that works better for loading the helicopters?
Yes, other designs that have shorter ramp lengths should be considered, if they still provide adequate aircraft clearance for AH-64 30mm cannon does not need to be removed to be loaded in C-17/C-5 aircraft. Same for UH-60 aircraft with
FLIR.
The schedule, on page 4 of the solicitation, addresses the container. It does not mention the dimensions. Based on the dimensions of the Approach Ramp, it must be longer than 100-inches. Will quotes be considered for containers that will contain all components, but still fit within and 8-foot pickup bed? Will quotes be considered for shoring kits that includes the container as part of the
Yes, if ramp sections still fit on a 463 pallet for shipment with aircraft on C-5/-17. Container does not have separate item as long as listed as part of kit.
W912D123Q0026 kit part number (P/N), or does it have to be listed as a separate item?
General concerns regarding delivery address: Please review solicitation amendments
Are storage boxes needed? Please review solicitation and the respective amendments
(End of Summary of Changes)
File details come from the government source that posted it. Updated .