Text version
FORT WAINWRIGHT SOLID WASTE REPORTING REQUIREMENTS
The Project manager shall report the diversion and disposal of Construction and Demolition (C&D) material to the Installation Solid Waste Manager for entry into the Solid Waste Annual Reporting, Web-Based Support (SWARWeb) as required in the Army Regulation 420-1, Army Facilities Management, Section 23-15.a, according to the format below every month.
Note that the information required by SWARWeb is not identical to the minimum information required for LEED C&D Waste Credit submittals. SWARWeb requests greater detail than is required by LEED, therefore recording only what is required by LEED will not satisfy the SWARWeb requirements.
For each disposal transaction, report:
1. The time and date
2. Name and location of the disposal site
3. Weight of waste (and indicate if actual scale measurement or an estimate)
4. Unit cost of disposal, e.g.,$/ton or $/CY
For each type of C&D debris material diverted, report the following data elements:
1. Date Occurred: The date the material were delivered to a reuse, recycling, or disposal facility. List each delivery separately.
2. Category: “C&D Debris” for all materials
3. Type: List material by each type from the list below
4. Info Source: Note either “Weight Actual” or “Weight Estimated”
5. Tons: Self explanatory
6. DRMO/DLA: Note ‘Yes” if the material was delivered to DRMO/DLA, “No” if it was delivered elsewhere
For Type, list all materials that were generated through the construction and/or demolition activities of a project broken down as follows: ABC (Aggregate Base Course)
| ABC-ASPHALT | LAND-SOIL, TOP | ||||||
| ABC-BRICK | LAND-VEGETATION/TIMBER (TREE TRUNKS & LIMBS) | ||||||
| ABC-CONCRETE | METAL | ||||||
| ABC-CONCRETE BLOCK UNIT | METAL-ALUMINUM | ||||||
| ABC-OTHER (C&D MASONRY/ASPHALT) | METAL-COPPER | ||||||
| ABC-STONE | METAL-MIXED METAL | ||||||
| ASPHALT | METAL-OTHER (C&D METAL) | ||||||
| BRICK | METAL-STEEL | ||||||
| C&D REFUSE | MIXED C&D (ALL TYPES) | ||||||
| CARPET | MIXED METAL | ||||||
| CONCRETE | MIXED RECYCLABLES | ||||||
| CONCRETE & MASONARY | OD/I/M-CEILING TILE | ||||||
| CONCRETE STONE ASPHALT | OD/I/M- | COMPOSITION ROOF | |||||
| CONCRETE/STONE | OD/I/M-DOORS/WINDOWS/STAIR/CABINETS | ||||||
| CONSTRUCTION RUBBLE | OD/I/M-GLASS | ||||||
| COVER SOIL | OD/I/M-GYPSUM/PLASTER | ||||||
| CRUSHED CONCRETE | OD/I/M-INSULATION | ||||||
| DEBRIS | OD/I/M-OTHER (C/D OTHER) | ||||||
| DIRT | OD/I/M-PAPER | ||||||
| GRAVEL | OD/I/M-PLASTIC | ||||||
| LAND-CRUSHED STONE/BASE | OD/I/M-SIDING | ||||||
| LAND-OTHER (C/D LAND CLEARING) | RECYCLED C&D DEBRIS | ||||||
| LAND-SOIL, LEAD-TAINTED, NON-HAZARDOUS | TELEPHONE POLE | ||||||
| LAND-SOIL, PETROLEUM-TAINTED | WOOD-OTHER (C/D WOOD) | ||||||
| LAND-SOIL, SUBSOIL | WOOD-STRUCTURAL |
FORT WAINWRIGHT SOLID WASTE REPORTING
Contractor Name: _________________________________ Project Name/Number: _____________________________ Project Manager: __________________________________
DISPOSAL TRANSACTION REPORT:
Date of Disposal:
Name and Location of Disposal Site:
Weight of Waste:
(actual or estimate)
Unit Cost of Disposal:
($/ton or $/CY)
EACH TYPE OF C&D DEBRIS MATERIAL DIVERTED:
Date Occurred:
(The date the material was delivered to a reuse, recycling or disposal facility. List each delivery separately)
Category:
(C&D debris for all materials):
Type (see list):
Weight of Waste: (actual/estimate-tons/pounds/CY):
DLA (DRMO): Note ‘Yes” if the material was delivered to DRMO/DLA, “No” if it was delivered elsewhere