Attach_L-2_MPS_with_Cost_POD_MP,_W912BV18R0036.xlsx

XLSX spreadsheet 39 KB Posted

Attached to
Military Master Planning Services Within the Pacific Ocean Division(POD)
Solicitation number
W912BV18R0036
Issued by

About this file

Attachment L-2 Milestone Payment Schedule with Cost for Solicitation No. W912BV18R0036, Master Planning Services within the Pacific Ocean Division (POD).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ATTACHMENT L-2
MILESTONE PAYMENT SCHEDULE WITH COST
MILITARY MASTER PLANNING SERVICES WITHIN

THE PACIFIC OCEAN DIVISION (POD)

Solicitation: W912BV-18-R-0036

Contract #TBD

7 August 2018

NOTES: 1) Offerors shall complete and return this Attachment L-2 version with their Volume II in Excel format; 2) this document is formatted and protected, allowing the required information to be entered in the green cells ONLY; 3) DO NOT attempt to make any changes; 4) Use whole dollar amount (no cents) Unit Prices ONLY.

CLINMILESTONE DESCRIPTIONExpiration Date to Exercise OptionProjected Schedule Start Date (MM/DD/YR)Projected Completion Date (MM/DD/YR)Unit of IssueQTYUNIT PRICECLIN AMOUNT
TASK 1

KICK-OFF MEETING, PLANS AND PROGRESS REPORTS

0001Task 1.1, PWS Section 7.1.1
Contract Kick-Off Meeting via teleconference within 21 calendar days of contract awardAt AwardJB1$0$0.00
0002Task 1.2, PWS Section 7.1.2
Project Management Plan (PMP)At AwardJB1$0$0.00
0003Monthly Progress Reports$0.00
0003AATask 1.4, PWS Section 7.1.3
Monthly Progress Reports, Base Period of PerformanceAt AwardMO24$0$0.00
0003AB
Option 1Task 1.5, PWS Section 7.1.3.1
Monthly Progress Reports, Option Period of Performance2 years after contract awardMO36$0$0.00
0004Task 1.6, PWS Section 7.1.4
Quality Assurance/Quality Control (QA/QC) PlanAt AwardJB1$0$0.00
Total Task 1 Base Tasks (CLINs 0001, 0002, 0003AA, 0004):$0.00
Total Task 1 Option Tasks (CLINs 0003AB)$0.00
Total Base plus Options$0.00

TASK 2

JOINT BASE ELMENDORF-RICHARDSON (JBER), ALASKA

FLIGHTLINE MASTER PLAN

0005Task 2.1, PWS Section 7.2.3
Installation Kick-off Meeting (On-site)At AwardJB1$0$0.00
0006Task 2.2
Airfield Area Development Plan (ADP)$0.00$0.00
0006AATask 2.2, PWS Sections 7.2.4.1 and 7.2.4.2

Data Collection and Analysis

AND

Task 2.2, PWS Section 7.2.4.2

Planning WorkshopAt AwardJB1$0$0.00
0006ABTask 2.2, PWS Section 7.2.4.3

Draft JBER ADP

AND

Task 2.2, PWS Section 7.2.4.4

Draft ADP On-site ReviewAt AwardJB1$0$0.00
0006ACTask 2.2, PWS Section 7.2.4.5

Pre-final ADP

AND

Task 2.2, PWS Section 7.2.4.6

Final JBER ADPAt AwardJB1$0$0.00
0007
Option 2Task 2.3
Area Development Execution Plan (ADEP)$0.00
0007AA
Option 2Task 2.3, PWS Section 7.2.5.1
Data Collection and Workshop2 years after contract awardJB1$0$0.00
0007AB
Option 2Task 2.3, PWS Section 7.2.5.2
Draft ADEP Report2 years after contract awardJB1$0$0.00
0007AC
Option 2Task 2.3, PWS Section 7.2.5.3

Pre-final ADEP Report

AND

Task 2.3, PWS Section 7.2.5.4

Final ADEP Report2 years after contract awardJB1$0$0.00
Total Task 2 Base Tasks (CLINs 0005, 0006AA-AC):$0.00
Total Task 2 Option Tasks (CLINs 0007AA-AC)$0.00
Total Base plus Options$0.00

TASK 3

ARMY BUNKERS AT KEDENA AIR FORCE BASE-OKINAWA, JAPAN

MASTER PLAN SUPPORT

0008Task 3.1, PWS Section 7.3.2
Installation Kick-off Meeting (Virtual)At AwardJB1$0$0.00
0009Task 3.2

Facility Condition Assessments (FCA) for

Category Code 422 of Munitions Storage Facilities (MSF)$0.00$0.00
0009AAData Collection and On-site SurveyAt AwardJB1$0$0.00
0009ABFCA BUILDER Draft ReportsAt AwardJB1$0$0.00
0009ACFCA BUILDER Final ReportsAt AwardJB1$0$0.00
0010
Option 3Task 3.3
Nodal Development Plan (NDP)$0.00$0.00
0010AA
Option 3Task 3.3, PWS Section 7.3.4.1

Data Collection and Analysis

AND

Task 3.3., PWS Section 7.3.4.2

On-site NDP Workshop2 years after contract awardJB1$0$0.00
0010AB
Option 3Task 3.3, PWS Section 7.3.4.3

NDP Draft Report

AND

Task 3.3., PWS Section 7.3.4.4

NDP Pre-final Report2 years after contract awardJB1$0$0.00
0010AC
Option 3Task 3.3., PWS Section 7.3.4.5
NDP Final Report2 years after contract awardJB1$0$0.00
0011
Option 4Task 3.4
Nodal Development Execution Plan (NDEP)$0.00$0.00
0011AA
Option 4Task 3.4, PWS Section 7.3.5.1

Data Collection and Workshop Preparation

AND

Task 3.4, PWS Section 7.3.5.2

NDEP Planning Workshop2 years after contract awardJB1$0$0.00
0011AB
Option 4Task 3.4, PWS Section 7.3.5.3
NDEP Draft Report2 years after contract awardJB1$0$0.00
0011AC
Option 4Task 3.4., PWS Section 7.3.5.6
NDEP Pre-final Report2 years after contract awardJB1$0$0.00
0011AD
Option 4Task 3.4., PWS Section 7.3.5.7
NDEP Final Report2 years after contract awardJB1$0$0.00
0012
Option 5Task 3.5
Storm Water Management Plan (SWMP)$0.00$0.00
0012AA
Option 5Task 3.5, PWS Section 7.3.6.1

Data Collection

AND

Task 3.5, PWS Section 7.3.6.2

Planning Workshop2 years after contract awardJB1$0$0.00
0012AB
Option 5Task 3.5, PWS Section 7.3.6.3

Draft SWMP

AND

Task 3.5., PWS Section 7.3.6.4

Pre-final SWMP2 years after contract awardJB1$0$0.00
0012AC
Option 5Task 3.5., PWS Section 7.3.6.5
Final SWMP2 years after contract awardJB1$0$0.00
0013
Option 6Task 3.6, PWS Section 7.3.7
Planning Charrette (PC) for Project Number (PN) #1$0.00$0.00
0013AA
Option 6Task 3.6, PWS Section 7.3.7.1
PC Workshop Preparation2 years after contract awardJB1$0$0.00
0013AB
Option 6Task 3.6, PWS Section 7.3.7.2

Submit PC Workshop In-brief Presentation and Agenda

AND

Task 3.6, PWS Section 7.3.7.3

Conduct PC Workshop2 years after contract awardJB1$0$0.00
0013AC
Option 6Task 3.6, PWS Section 7.3.7.5
Draft DD Form 13912 years after contract awardJB1$0$0.00
0013AD
Option 6Task 3.6, PWS Section 7.3.7.6
Final DD Form 13912 years after contract awardJB1$0$0.00
0014
Option 7Task 3.7
Planning Charrette (PC) for Project Number (PN) #2$0.00$0.00
0014AA
Option 7Task 3.7

PC Workshop Preparation

(Reference PWS Section 7.3.7.1 requirements)2 years after contract awardJB1$0$0.00
0014AB
Option 7Task 3.7

Submit PC Workshop In-brief Presentation and Agenda (Reference PWS Section 7.3.7.2 requirements)

AND

Task 3.7 Conduct PC Workshop

(Reference PWS Section 7.3.7.3 requirements)2 years after contract awardJB1$0$0.00
0014AC
Option 7Task 3.7

Draft DD Form 1391

(Reference PWS Section 7.3.7.5 requirements)2 years after contract awardJB1$0$0.00
0014AD
Option 7Task 3.7

Final DD Form 1391

(Reference PWS Section 7.3.7.6 requirements)2 years after contract awardJB1$0$0.00
0015
Option 8Task 3.8
Planning Charrette (PC) for Project Number (PN) #3$0.00$0.00
0015AA
Option 8Task 3.8

PC Workshop Preparation

(Reference PWS Section 7.3.7.1 requirements)2 years after contract awardJB1$0$0.00
0015AB
Option 8Task 3.8

Submit PC Workshop In-brief Presentation and Agenda (Reference PWS Section 7.3.7.2 requirements)

AND

Task 3.8 Conduct PC Workshop

(Reference PWS Section 7.3.7.3 requirements)2 years after contract awardJB1$0$0.00
0015AC
Option 8Task 3.8

Draft DD Form 1391

(Reference PWS Section 7.3.7.5 requirements)2 years after contract awardJB1$0$0.00
0015AD
Option 8Task 3.8

Final DD Form 1391

(Reference PWS Section 7.3.7.6 requirements)2 years after contract awardJB1$0$0.00
0016
Option 9Task 3.9
Planning Charrette (PC) for Project Number (PN) #4$0.00$0.00
0016AA
Option 9Task 3.9

PC Workshop Preparation

(Reference PWS Section 7.3.7.1 requirements)2 years after contract awardJB1$0$0.00
0016AB
Option 9Task 3.9

Submit PC Workshop In-brief Presentation and Agenda (Reference PWS Section 7.3.7.2 requirements)

AND

Task 3.9 Conduct PC Workshop

(Reference PWS Section 7.3.7.3)2 years after contract awardJB1$0$0.00
0016AC
Option 9Task 3.9

Draft DD Form 1391

(Reference PWS Section 7.3.7.5 requirements)2 years after contract awardJB1$0$0.00
0016AD
Option 9Task 3.9

Final DD Form 1391

(Reference PWS Section 7.3.7.6 requirements)2 years after contract awardJB1$0$0.00
0017
Option 10Task 3.10
Planning Charrette (PC) for Project Number (PN) #5$0.00$0.00
0017AA
Option 10Task 3.10

PC Workshop Preparation

(Reference PWS Section 7.3.7.1 requirements)2 years after contract awardJB1$0$0.00
0017AB
Option 10Task 3.10

Submit PC Workshop In-brief Presentation and Agenda (Reference PWS Section 7.3.7.2 requirements)

AND

Task 3.10 Reference PWS Section 7.3.7.3

Conduct PC Workshop2 years after contract awardJB1$0$0.00
0017AC
Option 10Task 3.10

Draft DD Form 1391

(Reference PWS Section 7.3.7.5 requirements)2 years after contract awardJB1$0$0.00
0017AD
Option 10Task 3.10

Final DD Form 1391

(Reference PWS Section 7.3.7.6 requirements)2 years after contract awardJB1$0$0.00
Total Task 3 Base Tasks (CLINs 0008, 0009AA-AC):$0.00
Total Task 3 Option Tasks (CLINs 0010-0017)$0.00
Total Base plus Options$0.00

TASK 4

7th AIR FORCE COMMUNITY PLANNIG LIAISON OFFICE (CPLO) PROGRAM SUPPORT-South Korea

0018
Option 11Task 4.1, PWS Section 7.4.3
Installation Kick-off Meeting (Virtual)2 years after contract awardJB1$0$0.00
0019
Option 12Task 4.2, PWS Section 7.4.4
Community Planning and Liaison Office (CPLO) Program Support, Option Year 12 years after contract awardMO12$0$0.00
0020
Option 13Task 4.3, PWS Section 7.4.5

Community Planning and Liaison Office (CPLO) Program Support

Option Year 21 year after award of Task 4.2MO12$0$0.00
0021
Option 14Task 4.4, PWS Section 7.4.6

Community Planning and Liaison Office (CPLO) Program Support

Option Year 31 year after award of Task 4.3MO12$0$0.00
0022
Option 15Task 4.5, PWS Section 7.4.7

Community Planning and Liaison Office (CPLO) Program Support

Option Year 41 year after award of Task 4.4MO12$0$0.00
0023
Option 16Task 4.6, PWS Section 7.4.8

Community Planning and Liaison Office (CPLO) Program Support

Option Year 51 year after award of Task 4.5, but no later than 4 years after contract awardMO12$0$0.00
Total Task 4 Option Tasks (CLINs 0018-0023):$0.00

TASK 5

CAMP ZAMA MILITARY FAMILY HOUSING (MFH) PLANNING AND PROGRAM SUPPORT-JAPAN

0024
Option 17Task 5.1, PWS Section 7.5.2
Installation Kick-off Meeting (Virtual)2 years after contract awardJB1$0$0.00
0025
Option 18Task 5.2
Future Year Development Program (FYDP) with DD Form 1391/Form 22 Preparation$0.00$0.00
0025AA
Option 18Task 5.2, PWS Section 7.5.3.1
Draft FYDP Program Development Plan2 years after contract awardJB1$0$0.00
0025AB
Option 18Task 5.2, PWS Section 7.5.3.2
Final FYDP Program Development Plan2 years after contract awardJB1$0$0.00
0026
Option 19Task 5.3
Programming Planning Charrette Workshops for Project Numbers 1 through 5$0.00$0.00
0026AA
Option 19Task 5.3, PWS Section 7.5.4.1
PC Workshops Preparation2 years after contract awardJB1$0$0.00
0026AB
Option 19Task 5.3, PWS Section 7.5.4.2
Conduct PC Workshops2 years after contract awardJB1$0$0.00
0026AC
Option 19Task 5.3, PWS Section 7.5.4.3
Draft DD Form 1391 or Form 222 years after contract awardJB1$0$0.00
0026AD
Option 19Task 5.3, PWS Section 7.5.4.4
Final DD Form 1391 or Form 222 years after contract awardJB1$0$0.00
0027
Option 20Task 5.4, PWS Section 7.5.5
1st Customer Concept Documents (CCD) for 1 MFH Unit/Facility$0.00$0.00
0027AA
Option 20Task 5.4, PWS Section 7.5.5.1

Data Collection and Information Review

AND

Task 5.4, PWS Section 7.5.5.2

CCD Workshop (On-site)2 years after contract awardJB1$0$0.00
0027AB
Option 20Task 5.4, PWS Section 7.5.5.3
Draft CCD Report2 years after contract awardJB1$0$0.00
0027AC
Option 20Task 5.4, PWS Section 7.5.5.4
Pre-final CCD Report2 years after contract awardJB1$0$0.00
0027AD
Option 20Task 5.4, PWS Section 7.5.5.5

Pre-final CCD Review Meeting

AND

Task 5.4, PWS Section 7.5.5.6

Final CCD Report2 years after contract awardJB1$0$0.00
0028
Option 21Task 5.5
2nd Customer Concept Documents (CCD) for 1 MFH Unit/Facility$0.00$0.00
0028AA
Option 21Task 5.5

Reference PWS Section 7.5.5.1 Data Collection and Information Review

AND

Task 5.5 Reference PWS Section 7.5.5.2

CCD Workshop (On-site)2 years after contract awardJB1$0$0.00
0028AB
Option 21Task 5.5

Reference PWS Section 7.5.5.3

Draft CCD Report2 years after contract awardJB1$0$0.00
0028AC
Option 21Task 5.5

Reference PWS Section 7.5.5.4

Pre-final CCD Report2 years after contract awardJB1$0$0.00
0028AD
Option 21Task 5.5

Reference PWS Section 7.5.5.5 Pre-final CCD Review Meeting

AND

Task 5.5 Reference PWS Section 7.5.5.6

Final CCD Report2 years after contract awardJB1$0$0.00
Total Task 5 Option Tasks (CLINs 0024-0028):$0.00

TASK 6

MARINE CORPS AIR STATION IWAKUNI (MCASI), JAPAN

REAL PROPERTY AND MASTER PLANNING SUPPORT

0029
Option 22Task 6.1, PWS Section 7.6.3
Installation Kick-off Meeting (Virtual)2 years after contract awardJB1$0$0.00
0030
Option 23Task 6.2, PWS Section 7.6.4

FIAR Bi-annual Records Maintenance, 150 Records Annually

Option Year 1$0.00$0.00
0030AA
Option 23Task 6.2, PWS Section 7.6.4.1
Real Property Record Maintenance2 years after contract awardJB1$0$0.00
0030AB
Option 23Task 6.2, PWS Section 7.6.4.2
Real Property Updates/Creation: Draft Submission2 years after contract awardJB1$0$0.00
0030AC
Option 23Task 6.2, PWS Section 7.6.4.3
Property Record Card Creation Final Submission and iNFADS Upload2 years after contract awardJB1$0$0.00
0031
Option 24Task 6.3, PWS Section 7.6.5

FIAR Bi-annual Records Maintenance, 150 Records Annually

Option Year 2$0.00$0.00
0031AA
Option 24Task 6.3

Reference PWS Section 7.6.4.1

Real Property Record Maintenance2 years after contract awardJB1$0$0.00
0031AB
Option 24Task 6.3

Reference PWS Section 7.6.4.2

Real Property Updates/Creation: Draft Submission2 years after contract awardJB1$0$0.00
0031AC
Option 24Task 6.3

Reference PWS Section 7.6.4.3

Property Record Card Creation Final Submission and iNFADS Upload2 years after contract awardJB1$0$0.00
0032
Option 25Task 6.4, PWS Section 7.6.6

FIAR Bi-annual Records Maintenance, 150 Records Annually

Option Year 3$0.00$0.00
0032AA
Option 25Task 6.4

Reference PWS Section 7.6.4.1

Real Property Record Maintenance2 years after contract awardJB1$0$0.00
0032AB
Option 25Task 6.4

Reference PWS Section 7.6.4.2

Real Property Updates/Creation: Draft Submission2 years after contract awardJB1$0$0.00
0032AC
Option 25Task 6.4

Reference PWS Section 7.6.4.3

Property Record Card Creation Final Submission and iNFADS Upload2 years after contract awardJB1$0$0.00
0033
Option 26Task 6.5, PWS Section 7.6.7
GIS Map Viewer Technical Support Services2 years after contract awardMO12$0$0.00
0034
Option 27Task 6.6

GIS Program Support

Option Year 1$0.00$0.00
0034AA
Option 27Task 6.6, PWS Section 7.6.8.1
GIS Program Management and Planning Support2 years after contract awardMO12$0$0.00
0034AB
Option 27Task 6.6, PWS Section 7.6.8.2
GIS Data Management Support2 years after contract awardMO12$0$0.00
0034AC
Option 27Task 6.6, PWS Section 7.6.8.3
GIS Visualization Support2 years after contract awardMO12$0$0.00
0034AD
Option 27Task 6.6, PWS Section 7.6.8.4
Geospatial Analysis Support2 years after contract awardMO12$0$0.00
0035
Option 28Task 6.7, PWS Section 7.6.9

GIS Program Support

Option Year 2$0.00$0.00
0035AA
Option 28Task 6.7

Reference PWS Section 7.6.8.1

GIS Program Management and Planning Support1 year after award of Task 6.6MO12$0$0.00
0035AB
Option 28Task 6.7

Reference PWS Section 7.6.8.2

GIS Data Management Support1 year after award of Task 6.6MO12$0$0.00
0035AC
Option 28Task 6.7

Reference PWS Section 7.6.8.3

GIS Visualization Support1 year after award of Task 6.6MO12$0$0.00
0035AD
Option 28Task 6.7

Reference PWS Section 7.6.8.4

Geospatial Analysis Support1 year after award of Task 6.6MO12$0$0.00
0036
Option 29Task 6.8, PWS Section 7.6.10

GIS Program Support

Option Year 3$0.00$0.00
0036AA
Option 29Task 6.8

Reference PWS Section 7.6.8.1

GIS Program Management and Planning Support1 year after award of Task 6.7MO12$0$0.00
0036AB
Option 29Task 6.8

Reference PWS Section 7.6.8.2

GIS Data Management Support1 year after award of Task 6.7MO12$0$0.00
0036AC
Option 29Task 6.8

Reference PWS Section 7.6.8.3

GIS Visualization Support1 year after award of Task 6.7MO12$0$0.00
0036AD
Option 29Task 6.8

Reference PWS Section 7.6.8.4

Geospatial Analysis Support1 year after award of Task 6.7MO12$0$0.00
0037
Option 30Task 6.9

1st Set of BFRs for 20 Category Codes

(PWS Table 5 – List of 1st Set of BRFs)$0.00$0.00
0037AA
Option 30Task 6.9, PWS Section 7.6.11.1
Data Collection and Coordination2 years after contract awardJB1$0$0.00
0037AB
Option 30Task 6.9, PWS Section 7.6.11.2
BFR Draft Report2 years after contract awardJB1$0$0.00
0037AC
Option 30Task 6.9, PWS Section 7.6.11.3
Pre-final BFR Report2 years after contract awardJB1$0$0.00
0037AD
Option 30Task 6.9, PWS Section 7.6.11.4
Final BFR Report2 years after contract awardJB1$0$0.00
0038
Option 31Task 6.10

2nd Set of BFRs for 20 Category Codes

(PWS Table 6 – List of 2nd Set of BFRs)$0.00$0.00
0038AA
Option 31Task 6.10, PWS Section 7.6.12.1
Data Collection and Coordination2 years after contract awardJB1$0$0.00
0038AB
Option 31Task 6.10, PWS Section 7.6.12.2
BFR Draft Report2 years after contract awardJB1$0$0.00
0038AC
Option 31Task 6.10, PWS Section 7.6.12.3
Pre-final BFR Report2 years after contract awardJB1$0$0.00
0038AD
Option 31Task 6.10, PWS Section 7.6.12.4
Final BFR Report2 years after contract awardJB1$0$0.00
0039
Option 32Task 6.11

3rd Set of BFRs for 20 Category Codes

(PWS Table 7 – List of 3rd Set of BFRs)$0.00$0.00
0039AA
Option 32Task 6.11, PWS Section 7.6.13.1
Data Collection and Coordination2 years after contract awardJB1$0$0.00
0039AB
Option 32Task 6.11, PWS Section 7.6.13.2
BFR Draft Report2 years after contract awardJB1$0$0.00
0039AC
Option 32Task 6.11, PWS Section 7.6.13.3
Pre-final BFR Report2 years after contract awardJB1$0$0.00
0039AD
Option 32Task 6.11, PWS Section 7.6.13.4
Final BFR Report2 years after contract awardJB1$0$0.00
0040
Option 33Task 6.12

4th Set of BFRs for 21 Category Codes

(PWS Table 8 – List of 4th Set of BFRs)$0.00$0.00
0040AA
Option 33Task 6.12, PWS Section 7.6.14.1
Data Collection and Coordination2 years after contract awardJB1$0$0.00
0040AB
Option 33Task 6.12, PWS Section 7.6.14.2
BFR Draft Report2 years after contract awardJB1$0$0.00
0040AC
Option 33Task 6.12, PWS Section 7.6.14.3
Pre-final BFR Report2 years after contract awardJB1$0$0.00
0040AD
Option 33Task 6.12, PWS Section 7.6.14.4
Final BFR Report2 years after contract awardJB1$0$0.00
Total Task 6 Option Tasks (CLINs 0028-0040):$0.00

TASK 7

AIR FORCE CIVIL ENGINEERING CENTER (AFCEC)

CHIBANA DISTRICT MASTER PLAN

0041
Option 34Task 7.1, PWS Section 7.7.3
Installation Kick-off Meeting (Virtual)2 years after contract awardJB1$0$0.00
0042
Option 35Task 7.2
Chibana District Area Development Plan (ADP)$0.00$0.00
0042AA
Option 35Task 7.2, PWS Section 7.7.4.1
Data Collection, Site Analysis and Stakeholder Interviews2 years after contract awardJB1$0$0.00
0042AB
Option 35Task 7.2, PWS Section 7.7.4.2
On-site Planning Workshop2 years after contract awardJB1$0$0.00
0042AC
Option 35Task 7.2, PWS Section 7.7.4.6

Draft Chibana District ADP

AND

Task 7.2, PWS Section 7.7.4.7

On-site Draft Review and Preferred Alternative Selection2 years after contract awardJB1$0$0.00
0042AD
Option 35Task 7.2, PWS Section 7.7.4.8
Pre-final Chibana District ADP2 years after contract awardJB1$0$0.00
0042AE
Option 35Task 7.2, PWS Section 7.7.4.9
Final Chibana District ADP2 years after contract awardJB1$0$0.00
0043
Option 36Task 7.3
Transportation Component Plan (TCP)$0.00$0.00
0043AA
Option 36Task 7.3
Transportation Component Plan Data Collection and Analysis2 years after contract awardJB1$0$0.00
0043AB
Option 36Task 7.3, PWS Section 7.7.5.1
Transportation Component Plan Draft Report2 years after contract awardJB1$0$0.00
0043AC
Option 36Task 7.3, PWS Section 7.7.5.2
Transportation Component Plan Pre-final Report2 years after contract awardJB1$0$0.00
0043AD
Option 36Task 7.3, PWS Section 7.7.5.3
Transportation Component Plan Final Report2 years after contract awardJB1$0$0.00
0044
Option 37Task 7.4
Utilities Component Plan (UCP)$0.00$0.00
0044AA
Option 37Task 7.4
Utilities Component Plan Data Collection and Analysis2 years after contract awardJB1$0$0.00
0044AB
Option 37Task 7.4, PWS Section 7.7.6.1
Utilities Component Plan Draft Report2 years after contract awardJB1$0$0.00
0044AC
Option 37Task 7.4, PWS Section 7.7.6.2
Utilities Component Plan Pre-final Report2 years after contract awardJB1$0$0.00
0044AD
Option 37Task 7.4, PWS Section 7.7.6.3
Utilities Component Plan Final Report2 years after contract awardJB1$0$0.00
0045
Option 38Task 7.5
Sustainability Component Plan (SCP)$0.00$0.00
0045AA
Option 38Task 7.5, PWS Section 7.7.7.1

Data Collection

AND

Task 7.5, PWS Section 7.7.7.2

SCP Planning Workshop2 years after contract awardJB1$0$0.00
0045AB
Option 38Task 7.5, PWS Section 7.7.7.3
Draft SCP Report2 years after contract awardJB1$0$0.00
0045AC
Option 38Task 7.5, PWS Section 7.7.7.4
Pre-final SCP Report2 years after contract awardJB1$0$0.00
0045AD
Option 38Task 7.5, PWS Section7.7.7.5
Final SCP Report2 years after contract awardJB1$0$0.00
Total Task 7 Option Tasks (CLINs 0041-0045):$0.00

TASK 8

AIR FORCE CIVIL ENGINEERING CENTER (AFCEC)

LODGING DISTRICT MASTER PLAN

0046
Option 39Task 8.1, PWS Section 7.8.4
Lodging District Area Development Plan (ADP) Installation Kick-off Meeting (Virtual)2 years after contract awardJB1$0$0.00
0047
Option 40Task 8.2
Kadena AFB Lodging District Area Development Plan (ADP)$0.00$0.00
0047AA
Option 40Task 8.2, PWS Section 7.8.5.1
Lodging District ADP Data Collection2 years after contract awardJB1$0$0.00
0047AB
Option 40Task 8.2, PWS Section 7.8.5.2
Lodging District ADP Planning Workshop2 years after contract awardJB1$0$0.00
0047AC
Option 40Task 8.2, PWS Section 7.8.5.3
Lodging District Draft ADP2 years after contract awardJB1$0$0.00
0047AD
Option 40Task 8.2, PWS 7.8.5.4
Lodging District Draft ADP Review (Web Conference)2 years after contract awardJB1$0$0.00
0047AE
Option 40Task 8.2, PWS Section 7.8.5.5
Lodging District Pre-final ADP2 years after contract awardJB1$0$0.00
0047AF
Option 40Task 8.2, PWS Section 7.8.5.6
Lodging District Final ADP2 years after contract awardJB1$0$0.00
0048
Option 41Task 8.3
Area Development Execution Plan (ADEP)$0.00$0.00
0048AA
Option 41Task 8.3, PWS Section 7.8.6.1
Planning Workshop2 years after contract awardJB1$0$0.00
0048AB
Option 41Task 8.3, PWS Section 7.8.6.2
Lodging District Draft ADEP Report2 years after contract awardJB1$0$0.00
0048AC
Option 41Task 8.3, PWS Section 7.8.6.3
Lodging District Pre-final ADEP Report2 years after contract awardJB1$0$0.00
0048AD
Option 41Task 8.3, PWS Section 7.8.6.4
Lodging District Final ADEP Report2 years after contract awardJB1$0$0.00
Total Task 8 Option Tasks (CLINs 0046-0048):$0.00

TASK 9

NAHA MILITARY PORT RELOCATION PLAN (NMPRP)

OKINAWA, JAPAN

0049
Option 42Task 9.1, PWS Section 7.9.3
Installation Kick-off Meeting (Virtual)2 years after contract awardJB1$0$0.00
0050
Option 43Task 9.2
NMPRP Nodal Development Plan (NDP)$0.00$0.00
0050AA
Option 43Task 9.2, PWS Section 7.9.4.1
Data Collection and Analysis2 years after contract awardJB1$0$0.00
0050AB
Option 43Task 9.2, PWS Section 7.9.4.2
NDP Planning Workshop2 years after contract awardJB1$0$0.00
0050AC
Option 43Task 9.2, PWS Section 7.9.4.3
Draft NDP Report2 years after contract awardJB1$0$0.00
0050AD
Option 43Task 9.2, PWS Section 7.9.4.4
Pre-final NDP Report2 years after contract awardJB1$0$0.00
0050AE
Option 43Task 9.2, PWS Section 7.9.4.5
Final NDP Report2 years after contract awardJB1$0$0.00
0051
Option 44Task 9.3
NMPRP Nodal Development Plan (NDP) Update, Exclusion of Ammunition Pier Requirements$0.00$0.00
0051AA
Option 44Task 9.3, PWS Section 7.9.5.1
Draft NDP Update2 years after contract awardJB1$0$0.00
0051AB
Option 44Task 9.3, PWS Section 7.9.5.2
Pre-final NDP Update2 years after contract awardJB1$0$0.00
0051AC
Option 44Task 9.3, PWS Section 7.9.5.3
Final NDP Update2 years after contract awardJB1$0$0.00
Total Task 9 Option Tasks (CLINs 0049-0051):$0.00

TASK 10

USAG JAPAN MILITARY FAMILY HOUSING (MFH)

PLANNING AND PROGRAM SUPPORT

0052
Option 45Task 10.1, PWS Section 7.10.2
Installation Kick-off Meeting (Virtual)2 years after contract awardJB1$0$0.00
0053
Option 46Task 10.2
USAG Japan MFH (ADP)$0.00$0.00
0053AA
Option 46Task 10.2, PWS Section 7.10.3.1
Data Collection and Analysis2 years after contract awardJB1$0$0.00
0053AB
Option 46Task 10.2, PWS Section 7.10.3.2
ADP Planning Workshop2 years after contract awardJB1$0$0.00
0053AC
Option 46Task 10.2, PWS Section 7.10.3.3
Draft ADP2 years after contract awardJB1$0$0.00
0053AD
Option 46Task 10.2, PWS Section 7.10.3.4
Draft ADP On-site Review Conference2 years after contract awardJB1$0$0.00
0053AE
Option 46Task 10.2, PWS Section 7.10.3.5
Pre-final ADP2 years after contract awardJB1$0$0.00
0053AF
Option 46Task 10.2, PWS Section 7.10.3.6
Final ADP2 years after contract awardJB1$0$0.00
0054
Option 47Task 10.3, PWS Section 7.10.4
Inclusion of 32 Dwelling Units within the USAG Japan MFH ADP$0.00$0.00
0054AA
Option 47Inclusion of 32 Dwelling Units into the Data Collection and AnalysisWithin 3 months of award of Task 10.2JB1$0$0.00
0054AB
Option 47Inclusion of 32 Dwelling Units into the ADP Planning CharretteWithin 3 months of award of Task 10.2JB1$0$0.00
0054AC
Option 47Inclusion of 32 Dwelling Units into the Draft ADPWithin 3 months of award of Task 10.2JB1$0$0.00
0054AD
Option 47Inclusion of 32 Dwelling Units into the Draft ADP On-site Review ConferenceWithin 3 months of award of Task 10.2JB1$0$0.00
0054AE
Option 47Inclusion of 32 Dwelling Units into the Pre-final ADPWithin 3 months of award of Task 10.2JB1$0$0.00
0054AF
Option 47Inclusion of 32 Dwelling Units into the Final ADPWithin 3 months of award of Task 10.2JB1$0$0.00
0055
Option 48Task 10.4
USAG Japan MFH Facility Condition Assessment (FCA)$0.00$0.00
0055AA
Option 48Task 10.4, PWS Section 7.10.5.1
Data Collection and On-site Survey2 years after contract awardJB1$0$0.00
0055AB
Option 48Task 10.4, PWS Section 7.10.5.2
FCA BUILDER Draft Reports2 years after contract awardJB1$0$0.00
0055AC
Option 48Task 10.4, PWS Section 7.10.5.3
FCA BUILDER Final Reports2 years after contract awardJB1$0$0.00
0056
Option 49Task 10.5, PWS Section 7.10.6
Inclusion of 32 Dwelling Units for the Camp Zama and Sagamihara FCA and BUILDER$0.00$0.00
0056AA
Option 49Inclusion of 32 Dwelling Units into the Data Collection and On-site Survey2 years after contract awardJB1$0$0.00
0056AB
Option 49Inclusion of 32 Dwelling Units into the FCA BUILDER Draft Reports2 years after contract awardJB1$0$0.00
0056AC
Option 49Inclusion of 32 Dwelling Units into the FCA BUILDER Final Reports2 years after contract awardJB1$0$0.00
0057
Option 50Task 10.6
Planning Charrette (PC) for Project Number (PN) #1$0.00$0.00
0057AA
Option 50Task 10.6, PWS Section 7.10.7.1
PC Workshop Preparation2 years after contract awardJB1$0$0.00
0057AB
Option 50Task 10.6, PWS Section 7.10.7.2

Submit PC Workshop In-brief Presentation and Agenda

AND

Task 10.6, PWS Section 7.10.7.3

Conduct PC Workshop2 years after contract awardJB1$0$0.00
0057AC
Option 50Task 10.6, PWS Section 7.10.7.5
Draft DD Form 13912 years after contract awardJB1$0$0.00
0057AD
Option 50Task 10.6, PWS Section 7.10.7.6
Final DD Form 13912 years after contract awardJB1$0$0.00
0058
Option 51Task 10.7, PWS Section 10.8
Planning Charrette (PC) for Project Number (PN) #2$0.00$0.00
0058AA
Option 51Task 10.7

PC Workshop Preparation

(Reference PWS Section 7.10.7.1 requirements)2 years after contract awardJB1$0$0.00
0058AB
Option 51Task 10.7, PWS Section 7.10.7.2

Submit PC Workshop In-brief Presentation and Agenda (Reference PWS Section 7.10.7.2)

AND

Task 10.7 Conduct PC Workshop

(Reference PWS Section 7.10.7.3 requirements)2 years after contract awardJB1$0$0.00
0058AC
Option 51Task 10.7

Draft DD Form 1391

(Reference PWS Section 7.10.7.5 requirements)2 years after contract awardJB1$0$0.00
0058AD
Option 51Task 10.7

Final DD Form 1391

(Reference PWS Section 7.10.7.6 requirements)2 years after contract awardJB1$0$0.00
0059
Option 52Task 10.8, PWS Section 7.10.9
Planning Charrette (PC) for Project Number (PN) #3$0.00$0.00
0059AA
Option 52Task 10.8

PC Workshop Preparation

(Reference PWS Section 7.10.7.1 requirements)2 years after contract awardJB1$0$0.00
0059AB
Option 52Task 10.8

Submit PC Workshop In-brief Presentation and Agenda (Reference PWS Section 7.10.7.2 requirements)

AND

Task 10.8 Conduct PC Workshop

(Reference PWS Section 7.10.7.3 requirements)2 years after contract awardJB1$0$0.00
0059AC
Option 52Task 10.8

Draft DD Form 1391

(Reference PWS Section 7.10.7.5 requirements)2 years after contract awardJB1$0$0.00
0059AD
Option 52Task 10.8

Final DD Form 1391

(Reference PWS Section 7.10.7.6 requirements)2 years after contract awardJB1$0$0.00
0060
Option 53Task 10.9, PWS Section 7.10.10
Planning Charrette (PC) for Project Number (PN) #4$0.00$0.00
0060AA
Option 53Task 10.9

PC Workshop Preparation

(Reference PWS Section 7.10.7.1 requirements)2 years after contract awardJB1$0$0.00
0060AB
Option 53Task 10.9

Submit PC Workshop In-brief Presentation and Agenda (Reference PWS Section 7.10.7.2 requirements)

AND

Task 10.9 Conduct PC Workshop

(Reference PWS Section 7.10.7.3 requirements)2 years after contract awardJB1$0$0.00
0060AC
Option 53Task 10.9

Draft DD Form 1391

(Reference PWS Section 7.10.7.5 requirements)2 years after contract awardJB1$0$0.00
0060AD
Option 53Task 10.9

Final DD Form 1391

(Reference PWS Section 7.10.7.6 requirements)2 years after contract awardJB1$0$0.00
0061
Option 54Task 10.10, PWS Section 7.10.11
Planning Charrette (PC) for Project Number (PN) #5$0.00$0.00
0061AA
Option 54Task 10.10

PC Workshop Preparation

(Reference PWS Section 7.10.7.1 requirements)2 years after contract awardJB1$0$0.00
0061AB
Option 54Task 10.10

Submit PC Workshop In-brief Presentation and Agenda (Reference PWS Section 7.10.7.2 requirements)

AND

Task 10.10 Conduct PC Workshop

(Reference PWS Section 7.10.7.3 requirements)2 years after contract awardJB1$0$0.00
0061AC
Option 54Task 10.10

Draft DD Form 1391

(Reference PWS Section 7.10.7.5 requirements)2 years after contract awardJB1$0$0.00
0061AD
Option 54Task 10.10

Final DD Form 1391

(Reference PWS Section 7.10.7.6 requirements)2 years after contract awardJB1$0$0.00
Total Task 10 Option Tasks (CLINs 0052-0061):$0.00
PROPOSAL SUMMARY
Base TasksOption TasksTask Total
Task 1 Base Award (CLINs 0001, 0002, 0003AA, 0004)$0.00
Task 2 Base Award (CLINs 0005, 0006AA-AC)$0.00
Task 3 Base Award (CLINs 0008, 0009AA-AC)$0.00
Task 1, Option 1 (CLIN 0003AB)$0.00$0.00
Task 2, Option 2 (CLINs 0007AA-AC)$0.00$0.00
Task 3, Option 3 (CLINs 0010AA-AC)$0.00
Task 3, Option 4, (CLINs 0011AA-AD)$0.00
Task 3, Option 5, (CLINs 0012AA-AC)$0.00
Task 3, Option 6, (CLINs 0013AA-AD)$0.00
Task 3, Option 7, (CLINs 0014AA-AD)$0.00
Task 3, Option 8, (CLINs 0015AA-AD)$0.00
Task 3, Option 9, (CLINs 0016AA-AD)$0.00
Task 3, Option 10, (CLINs 0017AA-AD)$0.00$0.00
Task 4, Options 11-16, (CLINs 0018-0023)$0.00$0.00
Task 5, Option 17, (CLIN 0024)$0.00
Task 5, Option 18, (CLINs 0025AA-AB)$0.00
Task 5, Option 19, (CLINs 0026AA-AD)$0.00
Task 5, Option 20, (CLINs 0027AA-AD)$0.00
Task 5, Option 21, (CLINs 0028AA-AD)$0.00$0.00
Task 6, Option 22, (CLIN 0029)$0.00
Task 6, Option 23, (CLINs 0030AA-AB)$0.00
Task 6, Option 24, (CLINs 0031AA-AC)$0.00
Task 6, Option 25, (CLINs 0032AA-AC)$0.00
Task 6, Option 26, (CLIN 0033)$0.00
Task 6, Option 27, (CLINs 0034AA-AD)$0.00
Task 6, Option 28, (CLINs 0035AA-AD)$0.00
Task 6, Option 29, (CLINs 0036AA-AD)$0.00
Task 6, Option 30, (CLINs 0037AA-AD)$0.00
Task 6, Option 31, (CLINs 0038AA-AD)$0.00
Task 6, Option 32, (CLINs 0039AA-AD)$0.00
Task 6, Option 33, (CLINs 0040AA-AD)$0.00$0.00
Task 7, Option 34, (CLIN 0041)$0.00
Task 7, Option 35, (CLINs 0042AA-AE)$0.00
Task 7, Option 36, (CLINs 0043AA-AD)$0.00
Task 7, Option 37, (CLINs 0044AA-AD)$0.00
Task 7, Option 38, (CLINs 0045AA-AD)$0.00$0.00
Task 8, Option 39, (CLIN 0046)$0.00
Task 8, Option 40, (CLINs 0047AA-AF)$0.00
Task 8, Option 41, (CLINs 0048AA-AD)$0.00$0.00
Task 9, Option 42, (CLIN 0049)$0.00
Task 9, Option 43, (CLINs 0050AA-AE)$0.00
Task 9, Option 44, (CLINs 0051AA-AC)$0.00$0.00
Task 10, Option 45, (CLINs 0052)$0.00
Task 10, Option 46, (CLINs 0053AA-AF)$0.00
Task 10, Option 47, (CLINs 0054AA-AF)$0.00
Task 10, Option 48, (CLINs 0055AA-AC)$0.00
Task 10, Option 49, (CLINs 0056AA-AC)$0.00
Task 10, Option 50, (CLINs 0057AA-AD)$0.00
Task 10, Option 51, (CLINs 0058AA-AD)$0.00
Task 10, Option 52, (CLINs 0059AA-AD)$0.00
Task 10, Option 53, (CLINs 0060AA-AD)$0.00
Task 10, Option 54, (CLINs 0061AA-AD)$0.00$0.00
Total Base Items:$0.00
Total Option Items:$0.00
TOTAL PROPOSED PRICE:$0.00

Sheet2

Sheet3

File details come from the government source that posted it.